Abstract
Precast concrete (PC) and composite structures have been widely used in large industrial buildings for constructability and cost efficiency. The PC beams and composite columns are preferrable for use as long-span beams and large-sized columns, respectively, to realize efficient steel-concrete composite construction. The present study developed seismic details of the PC beam-to-composite column joint. A cyclic loading test was performed on the beam-column joints to investigate the seismic performance. For the test parameters, the connection details and the plastic hinge relocation were considered. The test results showed that the load-carrying capacity and deformation capacity of the specimens satisfied the requirements for intermediate moment frames specified in AISC 341-16. Further, the load-carrying capacities predicted using the plastic hinge relocation concept and the effective tension force of the bottom reinforcement at the PC beam section agreed with the test results.
Get full access to this article
View all available purchase options and get full access to this article.
Data Availability Statement
Some or all data, models, or code generated or used during the study are available from the corresponding author by request.
Acknowledgments
This research was financially supported by grants from Korea Institute for Advancement of Technology (KIAT) (No. P0017191). The authors are grateful to the authorities for their support.
References
ACI (American Concrete Institute). 2019. Building code requirements for structural concrete and commentary. ACI 318-19. Farmington Hills, MI: ACI.
AISC. 2016. Seismic provisions for structural steel buildings. ANSI/AISC 341-16. Chicago: AISC.
AWS (American Welding Society). 1998. Committee, structural welding code-reinforcing steel. AWS D1.4. Miami, FL: AWS.
Baek, J. W., S. M. Kang, T. H. Kim, and J. Y. Kim. 2020. “Structural performance of PC double beam-column connection under gravity and seismic loading.” Int. J. Concr. Struct. Mater. 14 (1): 1–22. https://doi.org/10.1186/s40069-020-00439-4.
Campione, G. 2013. “RC columns strengthened with steel angles and battens: Experimental results and design procedure.” Pract. Period. Struct. Des. Constr. 18 (1): 1–11. https://doi.org/10.1061/(ASCE)SC.1943.
Choi, I. S., S. D. Choi, K. S. Kim, D. H. Lee, and H. J. Ju. 2015. “High-performance precast prestressed slab system with structural esthetic and material savings.” [In Korean.] Mag. Korea Concr. Inst. 27 (5): 36–39. https://doi.org/10.22636/MKCI.2015.27.5.36.
Eom, T. S., H. J. Hwang, H. G. Park, C. N. Lee, and H. S. Kim. 2014. “Flexural test for steel-concrete composite members using prefabricated steel angles.” J. Struct. Eng. 140 (4): 04013094. https://doi.org/10.1061/(ASCE)ST.1943-541X.0000898.
Eom, T. S., H. G. Park, H. J. Hwang, and S. M. Kang. 2016. “Plastic hinge relocation methods for emulative PC beam-column connections.” J. Struct. Eng. 142 (2): 04015111. https://doi.org/10.1061/(ASCE)ST.1943-541X.0001378.
Ertas, O., S. Ozden, and T. Ozturan. 2006. “Ductile connections in precast concrete moment resisting frames.” PCI J. 51 (3): 66–76. https://doi.org/10.15554/pcij.05012006.66.76.
Esmaeili, J., and N. Ahooghalandary. 2020. “Introducing an easy-install precast concrete beam-to-column connection strengthened by steel box and peripheral plates.” Eng. Struct. 205 (Feb): 110006. https://doi.org/10.1016/j.engstruct.2019.110006.
Ghayeb, H. H., H. A. Razak, and N. H. R. Sulong. 2020. “Seismic performance of innovative hybrid precast reinforced concrete beam-to-column connections.” Eng. Struct. 202 (Jan): 109886. https://doi.org/10.1016/j.engstruct.2019.109886.
Guo, X., S. Gao, L. Wang, and T. N. Bui. 2018. “Bearing capacity of embedded channel-shaped steel connections at precast concrete beam end.” Eng. Struct. 175 (Nov): 177–190. https://doi.org/10.1016/j.engstruct.2018.08.043.
Hu, G., W. Huang, and H. Xie. 2020. “Mechanical behavior of a replaceable energy dissipation device for precast concrete beam-column connections.” J. Constr. Steel Res. 164 (Jan): 105816. https://doi.org/10.1016/j.jcsr.2019.105816.
Hu, M., Q. Han, S. Wu, and X. Du. 2021. “Shear capacity of precast concrete shear keys with ultrahigh-performance concrete for connections.” J. Bridge Eng. 26 (7): 04021036. https://doi.org/10.1061/(ASCE)BE.1943-5592.0001734.
Hwang, H. J., T. S. Eom, and H. G. Park. 2015a. “Design considerations for interior RC beam-column joint with additional bars.” Eng. Struct. 98 (Sep): 1–13. https://doi.org/10.1016/j.engstruct.2015.04.021.
Hwang, H. J., T. S. Eom, H. G. Park, and S. H. Lee. 2016. “Axial load and cyclic lateral load tests for composite columns with steel angles.” J. Struct. Eng. 142 (5): 04016001. https://doi.org/10.1061/(ASCE)ST.1943-541X.0001452.
Hwang, H. J., T. S. Eom, H. G. Park, S. H. Lee, and H. S. Kim. 2015b. “Cyclic loading test for beam-column connections of concrete-filled U-shaped steel beams and concrete-encased steel angle columns.” J. Struct. Eng. 141 (11): 04015020. https://doi.org/10.1061/(ASCE)ST.1943-541X.0001242.
Kim, C. S., H. G. Park, K. S. Chung, and I. R. Choi. 2014. “Eccentric axial load capacity of high-strength steel-concrete composite columns of various sectional shapes.” J. Struct. Eng. 140 (4): 04013091. https://doi.org/10.1061/(ASCE)ST.1943-541X.0000879.
Kim, H. J., H. J. Hwang, and H. G. Park. 2020a. “Eccentric-axial-load test for composite columns using bolt-connected steel angles.” J. Struct. Eng. 146 (9): 04020178. https://doi.org/10.1061/(ASCE)ST.1943-541X.0002699.
Kim, H. J., H. J. Hwang, and H. G. Park. 2021. “Flexural testing for composite members with bolt-connected steel angles.” Eng. Struct. 230 (Mar): 111638. https://doi.org/10.1016/j.engstruct.2020.111638.
Kim, H. J., H. J. Hwang, H. G. Park, and D. K. Kim. 2020b. “Concentric axial load test for composite columns using bolt-connected steel angles.” Eng. Struct. 214 (Jul): 110650. https://doi.org/10.1016/j.engstruct.2020.110650.
Kim, H. J., H. G. Park, and H. J. Hwang. 2022. “Cyclic lateral loading test for composite columns with high-strength steel angle cage.” Eng. Struct. 250 (Jan): 113463. https://doi.org/10.1016/j.engstruct.2021.113463.
Lee, D. J., J. D. Lee, T. S. Oh, and T. H.-K. Kang. 2014. “Seismic experiment of precast concrete exterior beam-column joint using bolt type connection and prestressing method.” [In Korean.] J. Korea Concr. Inst. 26 (2): 125–133. https://doi.org/10.4334/JKCI.2014.26.2.125.
Li, B., S. A. Kulkarni, and C. L. Leong. 2009. “Seismic performance of precast hybrid-steel concrete connections.” J. Earthquake Eng. 13 (5): 667–689. https://doi.org/10.1080/13632460902837793.
Montuori, R., and V. Piluso. 2009. “Reinforced concrete columns strengthened with angles and battens subjected to eccentric load.” Eng. Struct. 31 (2): 539–550. https://doi.org/10.1016/j.engstruct.2008.10.005.
Park, R. 1988. “Ductility evaluation from laboratory and analytical testing.” In Vol. VII of Proc., 9th World Conf. on Earthquake Engineering, 605–616. Rotterdam, Netherlands: A.A.Balkema.
Senturk, M., S. Pul, A. Ilki, and I. Hajirasouliha. 2020. “Development of a monolithic-like precast beam-column moment connection: Experimental and analytical investigation.” Eng. Struct. 205 (Feb): 110057. https://doi.org/10.1016/j.engstruct.2019.110057.
Song, L. L., T. Guo, and C. Chen. 2014. “Experimental and numerical study of a self-centering prestressed concrete moment resisting frame connection with bolted web friction devices.” Earthquake Eng. Struct. Dyn. 43 (4): 529–545. https://doi.org/10.1002/eqe.2358.
Zhang, J., C. Ding, X. Rong, H. Yang, K. Wang, and B. Zhang. 2020. “Experimental seismic study of precast hybrid SFC/RC beam–column connections with different connection details.” Eng. Struct. 208 (Apr): 110295. https://doi.org/10.1016/j.engstruct.2020.110295.
Information & Authors
Information
Published In
Copyright
© 2023 American Society of Civil Engineers.
History
Received: Aug 12, 2022
Accepted: Dec 29, 2022
Published online: Feb 25, 2023
Published in print: May 1, 2023
Discussion open until: Jul 25, 2023
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.