Research Article
Jul 1975
Flood Protection of Crystal River Unit 3 Nuclear Plant
This article has a reply.
VIEW THE REPLYAuthors: Ronald M. Noble, M.ASCE, and Bert SimpsonAuthor Affiliations
Abstract
To satisfy U.S. Atomic Energy Commission (AEC) safety criteria, a required evaluation of the worst site-related flood is performed for the Crystal River Plant, located on the Gulf Coast of Florida, the probable maximum stillwater flood levels are likely to be a result of the probable maximum hurricane. Flood protection requirements for the Crystal River Plant are determined by considering the most severe combination of probable maximum hurricane parameters for the Gulf Coast Region. These parameters are used as input to a model of hurricane surge generation and attendant wave activity in order to determine the maximum flood levels at the Crystal River Plant.
Get full access to this article
View all available purchase options and get full access to this article.
Information & Authors
Information
Published In
Journal of the Power Division
Volume 101 • Issue 1 • July 1975
Pages: 85 - 94
Copyright
© 1975 American Society of Civil Engineers.
History
Published in print: Jul 1975
Published online: Feb 11, 2021
Permissions
Request permissions for this article.
Authors
Affiliations
Ronald M. Noble, M.ASCE
Mgr., Ocean Sciences, Dames & Moore, Los Angeles, Calif.
Bert Simpson
Engr., Nuclear Affairs, Florida Power Corp., St. Peters burg, Fla.
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.
View Options
Get Access
Access content
Please select your options to get access
Log in/Register
Log in via your institution (Shibboleth)
ASCE Members:
Please log in to see member pricing
Purchase
Save for later Item saved, go to cart Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
Get Access
Access content
Please select your options to get access
Log in/Register
Log in via your institution (Shibboleth)
ASCE Members:
Please log in to see member pricing
Purchase
Save for later Item saved, go to cart Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.