Rehabilitation of Wilson Dam Generating Units

Publication: Journal of the Power Division
Volume 95, Issue 2

Abstract

The first eight hydroelectric generating units at Wilson Dam were placed in service in 1925. The TVA began a program of rehabilitating and modernizing these units in 1964 to reduce maintenance, increase generating capability and provide remote control operation. The major equipment changes included new turbine runners, new generator stators complete with air housings, and new governors. In spite of unforeseen problems with four of the generator spiders which delayed the construction program and resulted in numerous changes to the construction schedule, the program was satisfactorily completed in 1968. The generating capacity of the units was increased an average of 17%, control was transferred to the central control room and the units have been in service for periods up to two years without significant operational or maintenance problems.

Get full access to this article

View all available purchase options and get full access to this article.

Information & Authors

Information

Published In

Journal of the Power Division
Volume 95Issue 2October 1969
Pages: 321 - 334

History

Published in print: Oct 1969
Published online: Feb 11, 2021

Permissions

Request permissions for this article.

Authors

Affiliations

William F. Willis, M.ASCE
Project Construction Engr., Div. of Construction, Tennessee Valley Authority, Russellville, Ala.
J. E. Kirkland
Principal Mechanical Engr., Div. of Engrg. Design, Tennessee Valley Authority, Knoxville, Tenn.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share