Technical Papers
Nov 8, 2023

Effect of Implementing Sustainable Management Practices on Construction Claim Mitigation

Publication: Journal of Management in Engineering
Volume 40, Issue 1

Abstract

The fragmented management of traditional construction projects, which mainly lacks the integration of project processes, often results in schedule delays and cost overruns. As a result, claims are most likely to arise between the contracting parties. Numerous studies have investigated the influence of integrating sustainable management practices (SMPs) in construction projects on specific project performance objectives, such as cost and quality; however, none has considered the effect of SMPs on claims resolution. Therefore this research investigated the impact of implementing an integration of SMPs clusters on construction claim mitigation. To achieve this goal, an adaptive neurofuzzy inference system (ANFIS) model was developed to establish 12 optimal approaches for integrating SMPs that promote the reduction of 10 different claim types. This study assists construction project management experts in identifying optimal combinations of a minimum number of sustainable management practices that, if implemented together, can help to significantly reduce targeted types of claims.

Practical Applications

Each construction project is characterized by its uniqueness, complexity, and uncertainty, making it vulnerable to risks, disputes, and severe fluctuation in budget and time of completion. Consequently, it is becoming crucial to adjust the traditional construction management practices into more-sustainable practices to minimize risks and improve the chances of delivering a project with minimum cost and time overruns. Therefore, integrating sustainability concepts into the project management process can support critical planning at very early stages, enhance coordination among key project parties, improve quality of output, increase productivity, and enhance project sustainability performance throughout the useful life of the project. The findings of this study reveal the importance of implementing sustainable management practices in mitigating certain construction claims. This research identified optimal approaches for the implementation of 25 sustainable management practices to avoid the occurrence of 10 frequent claim types. Using the results and models of this study, construction management practitioners can select, considering their project conditions and financial constraints, an ideal combination of critical sustainable management practices that can ensure the effective reduction of major construction claims encountered in their projects.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.

References

Abidin, N. Z., and C. L. Pasquire. 2007. “Revolutionize value management: A mode towards sustainability.” Int. J. Project Manage. 25 (3): 275e282. https://doi.org/10.1016/j.ijproman.2006.10.005.
Aibinu, A. A. 2009. “Aνoiding and mitigating delay and disruption claims conflict: Role of pre-contract negotiation.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 1 (1): 47–58. https://doi.org/10.1061/(ASCE)1943-4162(2009)1:1(47).
Akadiri, P. O. 2015. “Understanding barriers affecting the selection of sustainable materials in building projects.” J. Build. Eng. 4 (Dec): 86–93. https://doi.org/10.1016/j.jobe.2015.08.006.
Al Azad, N., W. I. Enegbuma, J. A. Bamgbade, and C. C. Ohueri. 2019. “Influencing factors in extension of time claims.” In Vol. 43 of Proc., Australasian Universities Building Education Association Conf., 70–85. North Rockhampton, Australia: Central Queensland Univ.
Ali, B., K. Sopian, H. Y. Chan, S. Mat, and A. Zaharim. 2008. “Key success factors in implementing renewable energy programme in Malaysia.” WSEAS Trans. Environ. Dev. 4 (12): 1141–1150.
Al Malki, Y. M., and M. S. Alam. 2021. “Construction claims, their types and causes in the private construction industry in the Kingdom of Bahrain.” Asian J. Civ. Eng. 22 (Apr): 477–484. https://doi.org/10.1007/s42107-020-00326-z.
Al-Qershi, M. T., and R. Kishore. 2017. “Claim causes and types in Indian construction industry–contractor’s perspective.” Am. J. Civ. Eng. Archit. 5 (5): 196–203.
Amari, S. I., A. Cichocki, and H. H. Yang. 1996. “A new learning algorithm for blind signal separation.” In Advances in neural information processing systems, edited by M. Mozer, 757–763. Burlington, MA: Morgan Kaufmann Publishers.
Atsalakis, G. S., I. G. Atsalaki, F. Pasiouras, and C. Zopounidis. 2019. “Bitcoin price forecasting with neuro-fuzzy techniques.” Eur. J. Oper. Res. 276 (2): 770–780. https://doi.org/10.1016/j.ejor.2019.01.040.
Awwad, R., B. Barakat, and C. Menassa. 2016. “Understanding dispute resolution in the Middle East region from perspectives of different stakeholders.” J. Manage. Eng. 32 (6): 05016019. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000465.
Badi, S., and N. Murtagh. 2019. “Green supply chain management in construction: A systematic literature review and future research agenda.” J. Cleaner Prod. 223 (Jun): 312–322. https://doi.org/10.1016/j.jclepro.2019.03.132.
Bakhary, N. A., H. Adnan, and A. Ibrahim. 2015. “A study of construction claim management problems in Malaysia.” Proc. Econ. Finance 23 (Jan): 63–70. https://doi.org/10.1016/S2212-5671(15)00327-5.
Bakhtiar, K. A., L. Y. Shen, and S. H. B. Misnan. 2008. “A framework for comparison study on the major methods in promoting sustainable construction practice.” J. Alam Bina 12 (3): 55–69.
Bourdeau, L. 1999. “Sustainable development and the future of construction: A comparison of visions from various countries.” Build. Res. Inf. 27 (6): 354e366. https://doi.org/10.1080/096132199369183.
Buson, M., R. Laurenti, H. Rozenfeld, and F. A. Forcellini. 2009. “A proposal for assessing the sustainability of projects in the planning phase based on lean principles: A case study in the electronics segment.” In Sao Jose Dos camps. São Paulo, Brazil: Univ. Sao Paolo.
Cakmak, E., and P. I. Cakmak. 2014. “An analysis of causes of disputes in the construction industry using analytical network process.” Proc. Soc. Behav. Sci. 109 (Jan): 183–187. https://doi.org/10.1016/j.sbspro.2013.12.441.
Chen, B., Z. Tian, Z. Chen, Z. Zhang, and W. Sun. 2018. “Structural safety evaluation of in-service tunnels using an adaptive neuro-fuzzy inference system.” J. Aerosp. Eng. 31 (5): 04018073. https://doi.org/10.1061/(ASCE)AS.1943-5525.0000883.
Choudhry, R. M. 2017. “Achieving safety and productivity in construction projects.” J. Civ. Eng. Manage. 23 (2): 311–318. https://doi.org/10.3846/13923730.2015.1068842.
Christini, G., M. Fetsko, and C. Hendrickson. 2004. “Environmental management systems and ISO 14001 certification for construction firms.” J. Constr. Eng. Manage. 130 (3): 330e336. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:3(330).
Diekmann, J. E., and M. C. Nelson. 1985. “Construction claims: Frequency and severity.” J. Constr. Eng. Manage. 111 (1): 74–81. https://doi.org/10.1061/(ASCE)0733-9364(1985)111:1(74).
Ding, G. K. C. 2008. “Sustainable construction—The role of environmental assessment tools.” J. Environ. Manage. 86 (3): 451–464. https://doi.org/10.1016/j.jenvman.2006.12.025.
DTI (Department of Trade and Industry). 2006. “Sustainable construction strategy report 2006.” Accessed May 10, 2021. https://www.sd-commission.org.uk/data/files/publications/dti_sdap.pdf.
El-Adaway, I. H., and A. A. Kandil. 2010. “Multiagent system for construction dispute resolution (MAS-COR).” J. Constr. Eng. Manage. 136 (3): 303–315. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000144.
Eom, C. S., and J. H. Paek. 2009. “Risk index model for minimizing environmental disputes in construction.” J. Constr. Eng. Manage. 135 (1): 34–41. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:1(34).
Falagas, M. E., E. I. Pitsouni, G. A. Malietzis, and G. Pappas. 2008. “Comparison of PubMed, Scopus, Web of Science, and Google scholar: Strengths and weaknesses.” FASEB J. 22 (2): 338–342. https://doi.org/10.1096/fj.07-9492LSF.
Fellows, R., and A. Liu. 2008. “Impact of participants’ values on construction sustainability.” Proc. Inst. Civ. Eng. Sustainability 161 (4): 219–227. https://doi.org/10.1680/ensu.2008.161.4.219.
Field, A. 2013. Discovering statistics using IBM SPSS statistics. 4th ed. London: SAGE.
Georgy, M. E., L. M. Chang, and L. Zhang. 2005. “Prediction of engineering performance: A neurofuzzy approach.” J. Constr. Eng. Manage. 131 (5): 548–557. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:5(548).
Gerek, I. H. 2014. “House selling price assessment using two different adaptive neuro-fuzzy techniques.” Autom. Constr. 41 (May): 33–39. https://doi.org/10.1016/j.autcon.2014.02.002.
Goel, A., L. S. Ganesh, and A. Kaur. 2019. “Sustainability integration in the management of construction projects: A morphological analysis of over two decades’ research literature.” J. Cleaner Prod. 236 (Nov): 117676. https://doi.org/10.1016/j.jclepro.2019.117676.
Gotschol, A., P. De Giovanni, and V. Esposito Vinzi. 2014. “Is environmental management an economically sustainable business?” J. Environ. Manage. 144 (Nov): 73–82. https://doi.org/10.1016/j.jenvman.2014.05.001.
Guan, L., A. Abbasi, and M. J. Ryan. 2020. “Analyzing green building project risk interdependencies using interpretive structural modeling.” J. Cleaner Prod. 256 (May): 120372. https://doi.org/10.1016/j.jclepro.2020.120372.
Gultekin, P., S. Mollaoglu-Korkmaz, D. R. Riley, and R. M. Leicht. 2013. “Process indicators to track effectiveness of high-performance green building projects.” J. Constr. Eng. Manage. 139 (12): A4013005. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000771.
Gunhan, S. 2019. “Analyzing sustainable building construction project delivery practices: Builders’ perspective.” Pract. Period. Struct. Des. Constr. 24 (1): 05018003. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000397.
Hameed, I. 2011. “Using Gaussian membership functions for improving the reliability and robustness of students’ evaluation systems.” Expert Syst. Appl. 38 (6): 7135–7142. https://doi.org/10.1016/j.eswa.2010.12.048.
Hassanein, A. A. G., and W. El Nemr. 2008. “Claims management in the Egyptian industrial construction sector: A contractor’s perspective.” Eng. Constr. Archit. Manage. 15 (3): 246–259. https://doi.org/10.1108/09699980810867406.
Haykin, S. 2007. Neural networks: A comprehensive foundation. 3rd ed. Upper Saddle River, NJ: Prentice-Hall.
Hussin, J. M., I. A. Rahman, and A. H. Memon. 2013. “The way forward in sustainable construction: Issues and challenges.” Int. J. Adv. Appl. Sci. 2 (1): 15–24. https://doi.org/10.11591/IJAAS.V2I1.1321.
Ibrahim, M. W., A. Hanna, and D. Kievet. 2020. “Quantitative comparison of project performance between project delivery systems.” J. Manage. Eng. 36 (6): 04020082. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000837.
Jang, J. S., and C. T. Sun. 1995. “Neuro-fuzzy modeling and control.” Proc. IEEE 83 (3): 378–406. https://doi.org/10.1109/5.364486.
Jang, J.-S. R. 1993. “ANFIS: Adaptive-network-based fuzzy inference system.” IEEE Trans. Syst. Man Cybern. 23 (3): 665–685. https://doi.org/10.1109/21.256541.
Jatarona, N. A., A. M. Yusof, S. Ismail, and C. C. Saar. 2016. “Public construction projects performance in Malaysia.” J. Southeast Asian Res. 2016 (1): 1–7. https://doi.org/10.5171/2016.940838.
Jin, X.-H. 2011. “Model for efficient risk allocation in privately financed public infrastructure projects using neuro-fuzzy techniques.” J. Constr. Eng. Manage. 137 (11): 1003–1014. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000365.
Kar, S., S. Das, and P. K. Ghosh. 2014. “Applications of neuro fuzzy systems: A brief review and future outline.” Appl. Soft Comput. 15 (Feb): 243–259. https://doi.org/10.1016/j.asoc.2013.10.014.
Kibert, C. J. 2008. Sustainable construction: Green building design and delivery. 2nd ed. Hoboken, NJ: Wiley.
Kim, P. H., M. Buffart, and G. Croidieu. 2016. “TMI: Signaling credible claims in crowd funding campaign narratives.” Group Organ. Manage. 41 (6): 717–750. https://doi.org/10.1177/1059601116651181.
Korkmaz, S., D. Riley, and M. Horman. 2010. “Piloting evaluation metrics for sustainable high-performance building project delivery.” J. Constr. Eng. Manage. 136 (8): 877–885. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000195.
Kumar, B. S., and S. K. Gubta. 2014. “Sustainable construction management.” Int. J. Appl. Eng. Res. 9 (22): 15573–15584. https://doi.org/10.1016/j.jclepro.2020.120350.
Labuschagne, C., and A. C. Brent. 2005. “Sustainable project life cycle management: The need to integrate life cycles in the manufacturing sector.” Int. J. Project Manage. 23 (2): 159–168. https://doi.org/10.1016/j.ijproman.2004.06.003.
Lennertz, B. 2003. “The charrette as an agent for change.” In New urbanism: Comprehensive report & best practices guide. 3rd ed., 12–28. New York: New Urban.
Li, Y., H. Sun, D. Li, J. Song, and R. Ding. 2022. “Effects of digital technology adoption on sustainability performance in construction projects: The mediating role of stakeholder collaboration.” J. Manage. Eng. 38 (3): 04022016. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001040.
Li, Y. Y., P.-H. Chen, D. A. S. Chew, C. C. Teo, and R. G. Ding. 2011. “Critical project management factors of AEC firms for delivering green building projects in Singapore.” J. Constr. Eng. Manage. 137 (12): 1153–1163. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000370.
Liu, H., M. J. Skibniewski, and M. Wang. 2016. “Identification and hierarchical structure of critical successfactors for innovation in construction projects: Chinese perspective.” J. Civ. Eng. Manage. 22 (3): 401e416: https://doi.org/10.3846/13923730.2014.975739.
Lopez, R., and P. E. D. Love. 2012. “Design error costs in construction projects.” J. Constr. Eng. Manage. 138 (5): 585–593. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000454.
Manoliadis, O., I. Tsolas, and A. Nakou. 2006. “Sustainable construction and drivers of change in Greece: A Delphi study.” Constr. Manage. Econ. 24 (2): 113e120. https://doi.org/10.1080/01446190500204804.
Marjaba, G. E., and S. E. Chidiac. 2016. “Sustainability and resiliency metrics for buildings–Critical review.” Build. Environ. 101 (May): 116–125. https://doi.org/10.1016/j.buildenv.2016.03.002.
Martens, M. L., and M. M. Carvalho. 2017. “Key factors of sustainability in project management context: A survey exploring the project managers’ perspective.” Int. J. Project Manage. 35 (Aug): 1084–1102. https://doi.org/10.1016/j.ijproman.2016.04.004.
Matthiessen, L. F., P. Morris, and D. Georges. 2004. Costing green: A comprehensive cost database and budgeting methodology by Lisa Fay Matthiessen and Peter Morris. San Francisco: Davis Landon Adamson.
Mehany, M. S. H. M., M. S. Bashettiyavar, G. Esmaeili, and G. Gad. 2018. “Claims and project performance between traditional and alternative project delivery methods.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 10 (3): 04518017. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000266.
Mehany, M. S. H. M., G. M. Gad, and B. Esmaeili. 2017. “Dispute prevention and resolution methods used on public highway projects employing different project delivery methods.” In Proc., Transportation Research Board 96th Annual Meeting. Washington, DC: Transportation Research Board.
Miller, R., D. Strombom, M. Iammarino, and B. Black. 2009. The commercial real estate revolution: Nine transforming keys to lowering costs, cutting waste, and driving change in a broken industry. Hoboken, NJ: Wiley.
Moura, H. M. P., J. M. C. Teixeira, and B. Pires. 2007. “Dealing with cost and time in the Portuguese construction industry.” In Proc., CIB World Building Congress, 1252–1265. Kanata, ON, Canada: International Council for Research and Innovation in Building and Construction.
Muiruri, G., and C. Mulinge. 2014. “Health and safety management on construction project sites in Kenya: A case study of construction projects in Nairobi County.” In Proc., FIG Congress, 16–21. Copenhagen, Denmark: International Federation of Surveyors.
Naji, K. K., M. Gunduz, and A. F. Naser. 2022. “An adaptive neurofuzzy inference system for the assessment of change order management performance in construction.” J. Manage. Eng. 38 (2): 04021098. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001017.
Nauck, N. 2000. “Data analysis with neuro-fuzzy methods.” Habilitation thesis, Dept. of Computer Science, Univ. of Magdeburg.
Nelms, C. E., A. D. Russell, and B. J. Lence. 2007. “Assessing the performance of sustainable technologies: A framework and its application.” Build. Res. Inf. 35 (3): 237e251. https://doi.org/10.1080/09613210601058139.
Oke, A., C. Aigbavboa, and T. Khangale. 2018. “Effect of skills shortage on sustainable construction: In Advances in human factors sustainable urban planning and infrastructure.” In Proc., AHFE 2017 Int. Conf. on Human Factors, Sustainable Urban Planning and Infrastructure, 303–309. Berlin: Springer.
Olatunji, O. A. 2006. “A comparative analysis of tender sums and final costs of public construction and supply projects in Nigeria.” J. Financial. Manage. Prop. Constr. 13 (1): 60–79.
Olawumi, T. O., and D. W. M. Chan. 2018. “Identifying and prioritizing the benefits of integrating BIM and sustainability practices in construction projects: A Delphi survey of international experts.” Sustainable Cities Soc. 40 (Jun): 16–27. https://doi.org/10.1016/j.scs.2018.03.033.
Opuku, A., and C. Fortune. 2011. “Organizational learning and sustainability in the construction industry.” Built Human Environ. Rev. 4 (1): 98–107.
Pallant, J. 2011. SPSS survival manual: A step by step guide to data analysis using SPSS. Sydney, NSW, Australia: Allen & Unwin.
Pennsylvania State University. 2004. “Field guide for sustainable construction: Produced for pentagon renovation and construction program office partnership for achieving construction excellence.” Accessed June 1, 2007. http://renovation.pentagon.mil/Field%20Guide%20for%20Sustainable%20Con.pdf.
Pham, A. D., N. T. Ngo, T. T. H. Truong, N. T. Huynh, and N. S. Truong. 2020. “Predicting energy consumption in multiple buildings using machine learning for improving energy efficiency and sustainability.” J. Cleaner Prod. 260 (Jul): 121082. https://doi.org/10.1016/j.jclepro.2020.121082.
Pitt, M., M. Tucker, M. Riley, and J. Longden. 2009. “Towards sustainable construction: Promotion and best practices.” Constr. Innovation 9 (2): 201e224. https://doi.org/10.1108/14714170910950830.
Rajab, S., and V. Sharma. 2018. “A review on the applications of neuro-fuzzy systems in business.” Artif. Intell. Rev. 49 (4): 481–510. https://doi.org/10.1007/s10462-016-9536-0.
Raouf, A. M., and S. G. Al-Ghamdi. 2019. “Effectiveness of project delivery systems in executing green buildings.” J. Constr. Eng. Manage. 145 (10): 03119005. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001688.
Raouf, M. E. A., N. E. Maysour, R. K. Farag, and A. M. Abdul-Raheim. 2019. “Wastewater treatment methodologies, review article.” Int. J. Environ. Agri. Sci. 3 (1): 18.
Rashidi, A., F. Jazebi, and I. Brilakis. 2011. “Neurofuzzy genetic system for selection of construction project managers.” J. Constr. Eng. Manage. 137 (1): 17–29. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000200.
Rauzana, A. 2016. “Analysis of causes of delay and time performance in construction projects.” IOSR J. Mech. Civ. Eng. 13 (5): 116–121. https://doi.org/10.9790/1684-130503116121.
Razkenari, M., A. Fenner, A. Shojaei, H. Hakim, and C. Kibert. 2020. “Perceptions of offsite construction in the United States: An investigation of current practices.” J. Build. Eng. 29 (Aug): 101138. https://doi.org/10.1016/j.jobe.2019.101138.
Reed, W. G., and E. B. Gordon. 2000. “Integrated design and building process: What research and methodologies are needed?” Build. Res. Inf. 28 (5–6): 325–337. https://doi.org/10.1080/096132100418483.
Ren, Z., C. J. Anumba, and O. O. Ugwu. 2003. “Multiagent system for construction claims negotiation.” J. Comput. Civ. Eng. 17 (3): 180–188. https://doi.org/10.1061/(ASCE)0887-3801(2003)17:3(180).
Robichaud, L. B., and V. S. Anantatmula. 2011. “Greening project management practices for sustainable construction.” J. Manage. Eng. 27 (1): 48–57. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000030.
Royston, P. 1992. “Approximating the Shapiro-Wilk W-test for non-normality.” Stat. Comput. 2 (3): 117–119. https://doi.org/10.1007/BF01891203.
Rwelamila, P. D., A. A. Talukhaba, and A. B. Ngowi. 2000. “Project procurement systems in the attainment of sustainable construction.” Sustainable Dev. 8 (1): 39e50. https://doi.org/10.1002/(SICI)1099-1719(200002)8:1%3C39::AID-SD127%3E3.0.CO;2-Z.
Saad, M. H., M. A. Nazzal, and B. M. Darras. 2019. “A general framework for sustainability assessment of manufacturing processes.” Ecol. Indic. 97 (Feb): 211e224. https://doi.org/10.1016/j.ecolind.2018.09.062.
Santos, R., A. A. Costa, J. D. Silvestre, and L. Pyl. 2019. “Informetric analysis and review of literature on the role of BIM in sustainable construction.” Autom. Constr. 103 (Jul): 221–234. https://doi.org/10.1016/j.autcon.2019.02.022.
Sappe, R. 2007. “Project management solutions for building owners and developers.” Buildings 101 (4): 22.
Semple, C., F. T. Hartman, and G. Jergeas. 1994. “Construction claims and disputes: Causes and cost/time overruns.” J. Constr. Eng. Manage. 120 (4): 785–795. https://doi.org/10.1061/(ASCE)0733-9364(1994)120:4(785).
Seo, W., and Y. Kang. 2020. “Performance indicators for the claim management of general contractors.” J. Manage. Eng. 36 (6): 785–795. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000835.
Seo, W., Y. H. Kwak, and Y. Kang. 2021. “Relationship between consistency and performance in the claim management process for construction projects.” J. Manage. Eng. 37 (6): 04021068. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000973.
Seresht, N. G., and A. R. Fayek. 2020. “Neuro-fuzzy system dynamics technique for modeling construction systems.” Appl. Soft Comput. 93 (Aug): 106400. https://doi.org/10.1016/j.asoc.2020.106400.
Shaikh, H. H., N. Y. Zainun, and S. H. Khahro. 2020. “Claims in construction projects: A comprehensive literature review.” IOP Conf. Ser.: Earth Environ. Sci. 498 (2): 012095. https://doi.org/10.1088/1755-1315/498/1/012095.
Shen, L. Y., and W. Y. V. Tam. 2002. “Implementation of environmental management in the Hong Kong construction industry.” Int. J. Project Manage. 20 (7): 535e543. https://doi.org/10.1016/S0263-7863(01)00054-0.
Shen, L.-Y., V. W. Tam, L. Tam, and Y.-B. Ji. 2010. “Project feasibility study: The key to successful implementation of sustainable and socially responsible construction management practice.” J. Cleaner Prod. 18 (3): 254–259.
Shihabudheen, K. V., and G. N. Pillai. 2017. “Regularized extreme learning adaptive neuro-fuzzy algorithm for regression and classification.” Knowledge -Based Syst. 127 (Jul): 100–113. https://doi.org/10.1016/j.knosys.2017.04.007.
Shurrab, J., M. Hussain, and M. Khan. 2018. “Green and sustainable practices in the construction industry: A confirmatory factor analysis approach.” Eng. Constr. Archit. Manage. 26 (6): 1063–1086. https://doi.org/10.1108/ECAM-02-2018-0056.
Spangenberg, J. H., and O. Bonniot. 1998. Sustainability indicators: A compass on the road towards sustainability. Wuppertal, Germany: Wuppertal Institute for Climate, Environment and Energy.
Stanitsas, M., K. Konstantinos, and V. Leopoulos. 2021. “Integrating sustainability indicators into project management: The case of construction industry.” J. Cleaner Prod. 279 (Jun): 123774. https://doi.org/10.1016/j.jclepro.2020.123774.
Statkic, S., B. Jovanovic, A. Micic, N. Arsic, and S. Jović. 2020. “Adaptive neuro fuzzy selection of the most important factors for photovoltaic pumping system performance prediction.” J. Build. Eng. 30 (Jul): 101242. https://doi.org/10.1016/j.jobe.2020.101242.
Tabassi, A. A., K. M. Roufechaei, M. Ramli, A. H. A. Bakar, R. Ismail, and A. H. K. Pakir. 2016. “Leadership competences of sustainable construction project managers.” J. Cleaner Prod. 124 (Aug): 339–349.
Takagi, T., and M. Sugeno. 1985. “Fuzzy identification of systems and its application to modeling and control.” IEEE Trans. Syst. Man Cybern 15 (Jan): 116–132. https://doi.org/10.1109/TSMC.1985.6313399.
Tan, Y., L. Shen, and H. Yao. 2011. “Sustainable construction practice and contractors’ competitiveness: A preliminary study.” Habitat Int. 35 (2): 225–230. https://doi.org/10.1016/j.habitatint.2010.09.008.
Tommelein, I. D. 2015. “Journey toward lean construction: Pursuing a paradigm shift in the AEC industry.” J. Constr. Eng. Manage. 141 (6): 04015005. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000926.
Tulacz, G. J. 2010. “The top 100 construction management-At-risk and design-build firms.” Eng. News-Rec. 264 (17): 26–27.
Tulacz, G. J. 2011. “The top 100 project delivery firms design-builders and domestic cm-at-risk firms face continued revenue declines in 2010.” Eng. News-Rec. 6 (3): 59–65.
Tulacz, G. J. 2017. “The top 100 project delivery firms.” Eng. News-Rec. 278 (17): 51–54.
Ujene, A., and U. Edike. 2016. “Nature and influence of contractual claims on the performance of construction projects: Evaluation for sustainable property development in Nigeria.” Jordan J. Civ. Eng. 10 (1): 40–55.
Ukaga, O. 2014. “Gilbert Silvius, Ron Schipper, Julia Planko, Jasper Van Den brink and Adri Kohler: Sustainability in project management.” In Environment, development and sustainability: A multidisciplinary approach to the theory and practice of sustainable development, 455–457. Berlin: Springer. https://doi.org/10.1007/s10668-013-9511-8.
Utama, Y. J., A. Ambariyanto, M. Zainuri, D. Darsono, B. Setyono, and S. P. Putro. 2018. “Sustainable development goals as the basis of university management towards global competitiveness.” IOP Conf. Series: J. Phys.: Conf. Ser. 1025 (1): 012094. https://doi.org/10.1088/1742-6596/1025/1/012094.
Waldron, B. D. 2006. Scope for improvement. A survey of the pressure points in Australian construction and infrastructure projects. Sydney, Australia: Australian Constructors Association.
Wanberg, J., C. Harper, M. R. Hallowell, and S. Rajendran. 2013. “Relationship between construction safety and quality performance.” J. Constr. Eng. Manage. 139 (10): 04013003.
Wong, T. T. 2015. “Performance evaluation of classification algorithms by k-fold and leave-one-out cross validation.” Pattern Recogn. 48 (9): 2839–2846. https://doi.org/10.1016/j.patcog.2015.03.009.
Xing, Y., R. M. W. Horner, M. A. El-Haram, and J. Bebbington. 2009. “A framework model for assessingsustainability impacts of urban development.” Account. Forum 33 (3): 209–224. https://doi.org/10.1016/j.accfor.2008.09.003.
Yates, J. K. 2014. “Design and construction for sustainable industrial construction.” J. Constr. Eng. Manage. 140 (4): B4014005. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000673.
Yevu, S. K., A. T. W. Yu, E. Adinyira, A. Darko, and M. F. Antwi-Afari. 2022. “Optimizing the application of strategies promoting electronic procurement systems towards sustainable construction in the building lifecycle: A neurofuzzy model approach.” J. Cleaner Prod. 336 (Feb): 130343. https://doi.org/10.1016/j.jclepro.2021.130343.
Zaneldin, E. K. 2006. “Construction claims in United Arab Emirates: Types, causes, and frequency.” Int. J. Project Manage. 24 (5): 453–459. https://doi.org/10.1016/j.ijproman.2006.02.006.

Information & Authors

Information

Published In

Go to Journal of Management in Engineering
Journal of Management in Engineering
Volume 40Issue 1January 2024

History

Received: Mar 1, 2023
Accepted: Aug 30, 2023
Published online: Nov 8, 2023
Published in print: Jan 1, 2024
Discussion open until: Apr 8, 2024

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Rita Awwad, A.M.ASCE [email protected]
Associate Professor, Dept. of Civil Engineering, Lebanese American Univ., 211 E. 46th St., New York, NY 10017 (corresponding author). Email: [email protected]
Graduate Student, Dept. of Civil Engineering, Lebanese American Univ., 211 E. 46th St., New York, NY 10017. ORCID: https://orcid.org/0009-0002-3886-6187. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share