Supply Chain Consequences of Government Subsidies for Promoting Prefabricated Construction and Emissions Abatement
Publication: Journal of Management in Engineering
Volume 39, Issue 5
Abstract
This paper investigates the effects of two types of government subsidies: the unit cost (UC) subsidy and the floor-area ratio (FAR) subsidy on emissions abatement of a prefabricated construction supply chain (PCSC), comprising a project contractor (PC) and a prefab manufacturer (PM). In our model, the PC subsidized by the government decides a prefabricated ratio (i.e., the ratio of the prefabs to the sum of the prefabs and on-site produced components) and purchases prefabs from the PM for assembly construction, which enables fewer emissions than on-site construction. We find that when assembly construction is less cost-efficient than on-site construction, only the UC subsidy can promote the adoption of prefabricated construction; otherwise, both subsidies are capable of doing so, with the FAR subsidy always inducing a higher prefabricated ratio than the UC subsidy. Furthermore, the UC subsidy holds a direct-pass-through effect, which raises the prefab price, whereas the FAR subsidy stabilizes the prefab price and can induce a win-win situation for the government and the PCSC members under certain circumstances. Regarding emissions abatement, the UC subsidy helps to reduce total emissions and emission intensity, while the FAR subsidy may unexpectedly exacerbate the total emissions but always outperforms the UC subsidy in reducing emission intensity. Finally, we conduct a case study to verify the validity of the proposed model. Our study adds to the body of knowledge by providing quantitative policy optimization for emissions abatement of PCSC.
Get full access to this article
View all available purchase options and get full access to this article.
Data Availability Statement
Some or all data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request. The related material is available at https://figshare.com/s/de2346976e4303e7b0af.
Acknowledgments
This work was supported by the National Natural Science Foundation of China under Grant No. 72031008.
References
Assaad, R. H., I. H. El-adaway, M. Hastak, and K. L. Needy. 2022. “The COVID-19 pandemic: A catalyst and accelerator for offsite construction technologies.” J. Manage. Eng. 38 (6): 04022062. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001091.
Aye, L., T. Ngo, R. H. Crawford, R. Gammampila, and P. Mendis. 2012. “Life cycle greenhouse gas emissions and energy analysis of prefabricated reusable building modules.” Energy Build. 47 (Apr): 159–168. https://doi.org/10.1016/j.enbuild.2011.11.049.
Bertram, N., S. Fuchs, J. Mischk, R. Palter, G. Strube, and J. Woetzel. 2019. “Modular construction: From projects to products.” Accessed June 24, 2022. https://www.mckinsey.com/business-functions/operations/our-insights/modular-construction-from-projects-to-products.
Bian, J., G. Zhang, and G. Zhou. 2020. “Manufacturer vs. consumer subsidy with green technology investment and environmental concern.” Eur. J. Oper. Res. 287 (3): 832–843. https://doi.org/10.1016/j.ejor.2020.05.014.
Bian, J., and X. Zhao. 2020. “Tax or subsidy? An analysis of environmental policies in supply chains with retail competition.” Eur. J. Oper. Res. 283 (3): 901–914. https://doi.org/10.1016/j.ejor.2019.11.052.
CABEE (China Association of Building Energy Efficiency). 2021. “China building energy consumption research report.” Accessed March 28, 2022. https://www.cabee.org/site/content/24020.html.
CNEEEX (Shanghai Environment and Energy Exchange). 2023. “National carbon emission allowance (CEA) listed agreement trading price.” Accessed January 21, 2023. https://www.cneeex.com/qpzs/quotshown.html.
Cohen, M. C., R. Lobel, and G. Perakis. 2016. “The impact of demand uncertainty on consumer subsidies for green technology adoption.” Manage. Sci. 62 (5): 1235–1258. https://doi.org/10.1287/mnsc.2015.2173.
Dou, Y., X. Xue, H. X. Li, X. Luo, and Z. Li. 2022. “Development strategy optimization for off-site construction projects: Synergy of the government and developers.” J. Manage. Eng. 38 (3): 04022013. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001023.
Huang, Z., and H. Fan. 2022. “A novel quantitative model for determining subsidy levels to accelerate the replacement of in-use construction equipment for emissions reduction.” J. Manage. Eng. 38 (2): 04021100. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001007.
Kim, H., H. Choi, T. Hong, C. Ji, and J. Lee. 2022. “Evolutionary game analysis of green loans program to achieve the national carbon emissions reduction target in South Korea.” J. Manage. Eng. 38 (3): 04022018. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001041.
Lee, Y., J. I. Kim, A. Khanzode, and M. Fischer. 2021. “Empirical study of identifying logistical problems in prefabricated interior wall panel construction.” J. Manage. Eng. 37 (3): 05021002. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000907.
Li, X., G. Q. Shen, P. Wu, H. Fan, H. Wu, and Y. Teng. 2018. “RBL-PHP: Simulation of lean construction and information technologies for prefabrication housing production.” J. Manage. Eng. 34 (2): 04017053. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000577.
Li, Y., Y. Tong, F. Ye, and J. Song. 2020. “The choice of the government green subsidy scheme: Innovation subsidy vs. product subsidy.” Int. J. Prod. Res. 58 (16): 4932–4946. https://doi.org/10.1080/00207543.2020.1730466.
Li, Z. D., G. Q. Shen, and X. L. Xue. 2014. “Critical review of the research on the management of prefabricated construction.” Habitat Int. 43 (Jul): 240–249. https://doi.org/10.1016/j.habitatint.2014.04.001.
Luo, L., X. Jin, G. Q. Shen, Y. Wang, X. Liang, X. Li, and C. Z. Li. 2020. “Supply chain management for prefabricated building projects in Hong Kong.” J. Manage. Eng. 36 (2): 05020001. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000739.
Luo, L., G. Q. Shen, G. Xu, Y. Liu, and Y. Wang. 2019. “Stakeholder-associated supply chain risks and their interactions in a prefabricated building project in Hong Kong.” J. Manage. Eng. 35 (2): 05018015. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000675.
Murali, K., M. K. Lim, and N. C. Petruzzi. 2019. “The effects of ecolabels and environmental regulation on green product development.” Manuf. Serv. Oper. Manage. 21 (3): 519–535. https://doi.org/10.1287/msom.2017.0703.
Nabi, M. A., and I. H. El-adaway. 2020. “Modular construction: Determining decision-making factors and future research needs.” J. Manage. Eng. 36 (6): 04020085. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000859.
Nabi, M. A., and I. H. El-adaway. 2021. “Understanding the key risks affecting cost and schedule performance of modular construction projects.” J. Manage. Eng. 37 (4): 04021023. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000917.
Nadim, W., and J. S. Goulding. 2010. “Offsite production in the UK: The way forward? A UK construction industry perspective.” Constr. Innovation 10 (2): 181–202. https://doi.org/10.1108/14714171011037183.
Pan, W., and R. Sidwell. 2011. “Demystifying the cost barriers to offsite construction in the UK.” Construct. Manage. Econ. 29 (11): 1081–1099. https://doi.org/10.1080/01446193.2011.637938.
Shanghai Housing and Urban-Rural Development Management Committee. 2021. “Shanghai prefabricated building “14th five-year plan.” Accessed June 28, 2022. https://zjw.sh.gov.cn/ghjh/20211109/f5ed3fe865b447b7b064fc695cae1351.html.
Sohrabi, M. K., and H. Azgomi. 2020. “A survey on the combined use of optimization methods and game theory.” Arch. Comput. Methods Eng. 27 (1): 59–80. https://doi.org/10.1007/s11831-018-9300-5.
Tan, T., G. Mills, J. Hu, and E. Papadonikolaki. 2021. “Integrated approaches to design for manufacture and assembly: A case study of Huoshenshan hospital to combat COVID-19 in Wuhan, China.” J. Manage. Eng. 37 (6): 05021007. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000972.
TEDA (Tianjin Economic-Technological Development Area Administrative Commission). 2021. “Notice on the declaration of special support projects for green development in the economic development zone in 2021.” Accessed June 28, 2022. https://www.teda.gov.cn/contents/3961/129176.html.
Wang, S. Z., and R. Sinha. 2021. “Life cycle assessment of different prefabricated rates for building construction.” Buildings 11 (11): 552. https://doi.org/10.3390/buildings11110552.
Wu, L., W. Lu, R. Zhao, J. Xu, X. Li, and F. Xue. 2022. “Using blockchain to improve information sharing accuracy in the onsite assembly of modular construction.” J. Manage. Eng. 38 (3): 04022014. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001029.
Xu, G., M. Li, C.-H. Chen, and Y. Wei. 2018. “Cloud asset-enabled integrated IoT platform for lean prefabricated construction.” Autom. Constr. 93 (Sep): 123–134. https://doi.org/10.1016/j.autcon.2018.05.012.
Yang, Y., M. Pan, W. Pan, and Z. Zhang. 2021. “Sources of uncertainties in offsite logistics of modular construction for high-rise building projects.” J. Manage. Eng. 37 (3): 04021011. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000905.
Zhai, Y., T. M. Choi, S. J. Shao, S. X. Xu, and G. Q. Huang. 2020. “Spatial-temporal hedging coordination in prefabricated housing production.” Int. J. Prod. Econ. 229 (Nov): 107792. https://doi.org/10.1016/j.ijpe.2020.107792.
Zhai, Y., Y. Fu, G. Xu, and G. Huang. 2019a. “Multi-period hedging and coordination in a prefabricated construction supply chain.” Int. J. Prod. Res. 57 (7): 1949–1971. https://doi.org/10.1080/00207543.2018.1512765.
Zhai, Y., G. Y. Xu, and G. Q. Huang. 2019b. “Buffer space hedging enabled production time variation coordination in prefabricated construction.” Comput. Ind. Eng. 137 (Nov): 106082. https://doi.org/10.1016/j.cie.2019.106082.
Zhai, Y., R. Y. Zhong, and G. Q. Huang. 2018. “Buffer space hedging and coordination in prefabricated construction supply chain management.” Int. J. Prod. Econ. 200 (Jun): 192–206. https://doi.org/10.1016/j.ijpe.2018.03.014.
Zhai, Y., R. Y. Zhong, Z. Li, and G. Huang. 2017. “Production lead-time hedging and coordination in prefabricated construction supply chain management.” Int. J. Prod. Res. 55 (14): 3984–4002. https://doi.org/10.1080/00207543.2016.1231432.
Zhou, W., and W. Huang. 2016. “Contract designs for energy-saving product development in a monopoly.” Eur. J. Oper. Res. 250 (3): 902–913. https://doi.org/10.1016/j.ejor.2015.10.024.
Information & Authors
Information
Published In
Copyright
© 2023 American Society of Civil Engineers.
History
Received: Sep 21, 2022
Accepted: Apr 13, 2023
Published online: Jun 24, 2023
Published in print: Sep 1, 2023
Discussion open until: Nov 24, 2023
ASCE Technical Topics:
- Air pollution
- Business management
- Case studies
- Construction costs
- Construction engineering
- Construction industry
- Construction management
- Contracts and subcontracts
- Emissions
- Engineering fundamentals
- Environmental engineering
- Freight transportation
- Government
- Infrastructure
- Logistics
- Methodology (by type)
- Offsite construction
- Organizations
- Pollution
- Practice and Profession
- Pricing
- Project management
- Research methods (by type)
- Supply chain management
- Transportation engineering
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.