Dynamic Assessment of the Transfer Risks in China’s Public–Private Partnership Water Projects: A System Dynamics Approach

Publication: Journal of Infrastructure Systems
Volume 29, Issue 4

Abstract

Public–private partnerships (PPPs) are the primary means of delivering water projects in developing countries. In China, most water PPP projects remain in the construction and operation stages, with few having passed to the transfer stage. The lack of experience in managing transfer risks is itself an impediment to the further development of China’s PPPs. Thus, this study attempts to address two research concerns: (1) identifying transfer risks and risk factors, and (2) dynamically evaluating those transfer risks. Literature review, expert interviews, and process modeling via Integrated Computer-Aided Manufacturing Definition Method 0 (IDEF0) were utilized to identify and assess transfer risks with risk factors. The time-varying nature of transfer risks was evaluated using a system dynamics method. Eleven transfer risks and their value accumulation curves were identified. Value growth of legal and residual value risks remains steady over time. The risk values of contract, political, overhaul, information, and employee risks pose severe initial threats, but reduce on project transfer. However, credit, data transfer, after-transfer operational, and succession operator risks tend to escalate over time. The proposed model allows for a dynamic evaluation of transfer risks, and in so doing, improves the efficiency of PPP project transfer risk management.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data, models, or codes that support the findings of this study are available from the corresponding author upon reasonable request.

Acknowledgments

The authors wish to thank the National Natural Science Foundation of China for its financial support (Grant No. 71971147).

References

Almeile, A. M., M. Chipulu, U. Ojiako, R. Vahidi, and A. Marshall. 2022. “Project-focussed literature on public-private partnership (PPP) in developing countries: A critical review.” Prod. Plann. Control 1–28. https://doi.org/10.1080/09537287.2022.2123408.
Ameyaw, E. E., and A. P. C. Chan. 2013. “Identifying public-private partnership (PPP) risks in managing water supply projects in Ghana.” J. Facil. Manage. 11 (2): 152–182. https://doi.org/10.1108/14725961311314651.
Ameyaw, E. E., and A. P. C. Chan. 2015. “Evaluating key risk factors for PPP water projects in Ghana: A Delphi study.” J. Facil. Manage. 13 (2): 133. https://doi.org/10.1108/JFM-10-2013-0051.
Ang, C. L., M. Luo, and R. K. L. Gay. 1994. “Automatic generation of IDEF0 models.” J. Intell. Manuf. 5 (Apr): 79–92. https://doi.org/10.1007/BF00572401.
Bao, F., C. Chen, A. P. C. Chan, I. Martek, and A. Shrestha. 2019. “Dynamic framework transfer model for public–private partnerships: Lessons from a China water sector case study.” Eng. Constr. Archit. Manage. 26 (7): 1218–1239. https://doi.org/10.1108/ECAM-01-2018-0028.
Bao, F., I. Martek, C. Chen, A. P. C. Chan, and Y. Yu. 2018. “Lifecycle performance measurement of public-private partnerships: A case study in China’s water sector.” Int. J. Strategic Property Manage. 22 (6): 516–531. https://doi.org/10.3846/ijspm.2018.6048.
Bao, F., I. Martek, C. Chen, Q. Wu, and A. P. C. Chan. 2022. “Critical risks inherent to the transfer phase of public–private partnership water projects in China.” J. Manage. Eng. 38 (3): 04022006. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001024.
Carpintero, S., and O. Helby Petersen. 2016. “Public–private partnerships (PPPs) in local services: Risk-sharing and private delivery of water services in Spain.” Local Gov. Stud. 42 (6): 958–979. https://doi.org/10.1080/03003930.2016.1204297.
Chan, A. P. C., P. T. I. Lam, Y. Wen, E. E. Ameyaw, S. Wang, and Y. Ke. 2015. “Cross-sectional analysis of critical risk factors for PPP water projects in China.” J. Infrastruct. Syst. 21 (1): 04014031. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000214.
Chan, W. T., C. Chen, J. I. Messner, and D. K. Chua. 2005. “Interface management for China’s build–operate–transfer projects.” J. Constr. Eng. Manage. 131 (6): 645–655. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:6(645).
Chen, C. 2009. “Can the pilot BOT project provide a template for future projects? A case study of the Chengdu No. 6 Water Plant B Project.” Int. J. Project Manage. 27 (6): 573–583. https://doi.org/10.1016/j.ijproman.2008.10.006.
Cheng, Z., Y. Ke, J. Lin, Z. Yang, and J. Cai. 2016. “Spatio-temporal dynamics of public private partnership projects in China.” Int. J. Project Manage. 34 (7): 1242–1251. https://doi.org/10.1016/j.ijproman.2016.05.006.
Cheung, E., and A. P. C. Chan. 2011. “Risk factors of public-private partnership projects in China: Comparison between the water, power, and transportation sectors.” J. Urban Plann. Dev. 137 (4): 409–415. https://doi.org/10.1061/(ASCE)UP.1943-5444.0000086.
Chou, J.-S., and D. Pramudawardhani. 2015. “Cross-country comparisons of key drivers, critical success factors and risk allocation for public-private partnership projects.” Int. J. Project Manage. 33 (5): 1136–1150. https://doi.org/10.1016/j.ijproman.2014.12.003.
Eberlein, R. L., and D. W. Peterson. 1992. “Understanding models with Vensim.” Eur. J. Oper. Res. 59 (1): 216–219. https://doi.org/10.1016/0377-2217(92)90018-5.
Grimsey, D., and M. K. Lewis. 2002. “Evaluating the risks of public private partnerships for infrastructure projects.” Int. J. Project Manage. 20 (2): 107–118. https://doi.org/10.1016/S0263-7863(00)00040-5.
Iyer, K. C., and M. Sagheer. 2010. “Hierarchical structuring of PPP risks using interpretative structural modeling.” J. Constr. Eng. Manage. 136 (2): 151–159. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000127.
Jiang, W., Q. Yang, J. Jiang, I. Martek, and F. Gao. 2022. “Operational risk management of public–private partnership infrastructure projects: A bibliometric literature review.” Buildings 12 (11): 1905. https://doi.org/10.3390/buildings12111905.
Jokar, E., B. Aminnejad, and A. Lork. 2021. “Assessing and prioritizing risks in public-private partnership (PPP) projects using the integration of fuzzy multi-criteria decision-making methods.” Oper. Res. Perspect. 8 (Jan): 100190. https://doi.org/10.1016/j.orp.2021.100190.
Ke, Y., S. Wang, and A. P. C. Chan. 2012. “Risk management practice in China’s public-private partnership projects.” J. Civ. Eng. Manage. 18 (5): 675–684. https://doi.org/10.3846/13923730.2012.723380.
Ke, Y., S. Wang, A. P. C. Chan, and P. T. Lam. 2010. “Preferred risk allocation in China’s public–private partnership (PPP) projects.” Int. J. Project Manage. 28 (5): 482–492. https://doi.org/10.1016/j.ijproman.2009.08.007.
Keers, B. B. M., and P. C. van Fenema. 2018. “Managing risks in public-private partnership formation projects.” Int. J. Project Manage. 36 (6): 861–875. https://doi.org/10.1016/j.ijproman.2018.05.001.
Li, H., M. Liang, C. Zhang, and Y. Cao. 2022. “Risk evaluation of water environmental treatment PPP projects based on the intuitionistic fuzzy MULTIMOORA improved FMEA method.” Systems 10 (5): 163. https://doi.org/10.3390/systems10050163.
Li, J., and P. X. W. Zou. 2011. “Fuzzy AHP-based risk assessment methodology for PPP projects.” J. Constr. Eng. Manage. 137 (12): 1205–1209. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000362.
Liu, J., Z. Hua, Y. Pang, and X. Wang. 2021. “Risk sharing for PPP project in construction waste recycling industry in China.” Environ. Sci. Pollut. Res. 29 (9): 12614–12628. https://doi.org/10.1007/s11356-021-15816-z.
Loosemore, M., and E. Cheung. 2015. “Implementing systems thinking to manage risk in public private partnership projects.” Int. J. Project Manage. 33 (6): 1325–1334. https://doi.org/10.1016/j.ijproman.2015.02.005.
Lu, S. 2014. “Water infrastructure in China: The importance of full project life-cycle cost analysis in addressing water challenges.” Int. J. Water Resour. Dev. 30 (1): 47–59. https://doi.org/10.1080/07900627.2013.847760.
Merriam, S. B., and E. J. Tisdell. 2015. Qualitative research: A guide to design and implementation. New York: Wiley.
Mhatre, T. N., J. Thakkar, and J. Maiti. 2017. “Modelling critical risk factors for Indian construction project using interpretive ranking process (IRP) and system dynamics (SD).” Int. J. Qual. Reliab. Manage. 34 (9): 1451–1473. https://doi.org/10.1108/IJQRM-09-2015-0140.
Ministry of Finance. 2014. “Notice on printing and distributing the guidelines (trial) for public-private partnerships.” Accessed November 29, 2014. http://www.gov.cn/gongbao/content/2015/content_2835273.htm.
Nasirzadeh, F., M. Khanzadi, and M. Rezaie. 2014. “Dynamic modeling of the quantitative risk allocation in construction projects.” Int. J. Project Manage. 32 (3): 442–451. https://doi.org/10.1016/j.ijproman.2013.06.002.
Papajohn, D., M. El Asmar, K. R. Molenaar, and D. Alleman. 2020. “Comparing contract administration functions for alternative and traditional delivery of highway projects.” J. Manage. Eng. 36 (1): 04019038. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000727.
Qian, N., S. House, A. M. Wu, and X. Wu. 2020. “Public–private partnerships in the water sector in China: A comparative analysis.” Int. J. Water Resour. Dev. 36 (4): 631–650. https://doi.org/10.1080/07900627.2019.1685951.
Rasheed, N., W. Shahzad, M. Khalfan, and J. O. B. Rotimi. 2022. “Risk identification, assessment, and allocation in PPP projects: A systematic review.” Buildings 12 (8): 1109. https://doi.org/10.3390/buildings12081109.
Rebeiz, K. S. 2012. “Public–private partnership risk factors in emerging countries: BOOT illustrative case study.” J. Manage. Eng. 28 (4): 421–428. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000079.
Rouse, M. 2014. “The worldwide urban water and wastewater infrastructure challenge.” Int. J. Water Resour. Dev. 30 (1): 20–27. https://doi.org/10.1080/07900627.2014.882203.
Rybnicek, R., J. Plakolm, and L. Baumgartner. 2020. “Risks in public–private partnerships: A systematic literature review of risk factors, their impact and risk mitigation strategies.” Public Perform. Manage. Rev. 43 (5): 1174–1208. https://doi.org/10.1080/15309576.2020.1741406.
Sanvido, V. E., and D. J. Medeiros. 1990. “Applying computer-integrated manufacturing concepts to construction.” J. Constr. Eng. Manage. 116 (2): 365–379. https://doi.org/10.1061/(ASCE)0733-9364(1990)116:2(365).
Sanvido, V. E., and K. J. Norton. 1994. “Integrated design-process model.” J. Manage. Eng. 10 (5): 55–62. https://doi.org/10.1061/(ASCE)9742-597X(1994)10:5(55).
Sarvari, H., A. Valipour, N. Yahya, N. M. Noor, M. Beer, and N. Banaitiene. 2019. “Approaches to risk identification in public–private partnership projects: Malaysian private partners’ overview.” Administrative Sci. 9 (1): 17. https://doi.org/10.3390/admsci9010017.
Shrestha, A., T.-K. Chan, A. A. Aibinu, C. Chen, and I. Martek. 2017. “Risks in PPP water projects in China: Perspective of local governments.” J. Constr. Eng. Manage. 143 (7): 05017006. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001313.
Shrestha, A., T.-K. Chan, A. A. Aibinu, C. Chen, and I. Martek. 2018. “Risk allocation inefficiencies in Chinese PPP water projects.” J. Constr. Eng. Manage. 144 (4): 04018013. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001457.
Tallaki, M., and E. Bracci. 2021. “Risk allocation, transfer and management in public–private partnership and private finance initiatives: A systematic literature review.” Int. J. Public Sect. Manage. 34 (7): 709–731. https://doi.org/10.1108/IJPSM-06-2020-0161.
Wang, L., A. Shrestha, W. Zhang, and G. Wang. 2020. “Government guarantee decisions in PPP wastewater treatment expansion projects.” Water 12 (12): 3352. https://doi.org/10.3390/w12123352.
Wang, W., X. Deng, Y. Wang, L. Peng, and Z. Yu. 2022. “Impacts of infrastructure construction on ecosystem services in new-type urbanization area of North China Plain.” Resour. Conserv. Recycl. 185 (Oct): 106376. https://doi.org/10.1016/j.resconrec.2022.106376.
Wang, Y., T. Wan, and C. Tortajada. 2018. “Water demand framework and water development: The case of China.” Water 10 (12): 1860. https://doi.org/10.3390/w10121860.
World Bank. 2017. “The private participation in infrastructure (PPI) project database.” Accessed August 18, 2023. https://ppi.worldbank.org/en/ppidata.
Xu, J., and Z. Xu. 2022. “China sewage treatment engineering issues assessment.” J. Cleaner Prod. 377 (Dec): 134391. https://doi.org/10.1016/j.jclepro.2022.134391.
Xu, Y., Y. Yang, A. P. C. Chan, J. F. Yeung, and H. Cheng. 2011. “Identification and allocation of risks associated with PPP water projects in China.” Int. J. Strategic Property Manage. 15 (3): 275–294. https://doi.org/10.3846/1648715X.2011.617867.
Xu, Y., J. F. Y. Yeung, A. P. C. Chan, D. W. M. Chan, S. Q. Wang, and Y. Ke. 2010. “Developing a risk assessment model for PPP projects in China—A fuzzy synthetic evaluation approach.” Autom. Constr. 19 (7): 929–943. https://doi.org/10.1016/j.autcon.2010.06.006.
Ye, S., and R. L. Tiong. 2003. “The effect of concession period design on completion risk management of BOT projects.” Construct. Manage. Econ. 21 (5): 471–482. https://doi.org/10.1080/0144619032000073488.
Yu, Y., A. Darko, A. P. C. Chan, C. Chen, and F. Bao. 2018. “Evaluation and ranking of risk factors in transnational public–private partnerships projects: Case study based on the intuitionistic fuzzy analytic hierarchy process.” J. Infrastruct. Syst. 24 (4): 04018028. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000448.
Yuan, J., A. P. C. Chan, W. Xiong, M. J. Skibniewski, and Q. Li. 2015. “Perception of residual value risk in public private partnership projects: Critical review.” J. Manage. Eng. 31 (3): 04014041. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000256.
Zhang, Y., C.-H. Tsai, and P.-C. Liao. 2020. “Rethinking risk propagation mechanism in public–private partnership projects: Network perspective.” J. Infrastruct. Syst. 26 (2): 04020011. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000538.
Zou, W., M. Kumaraswamy, J. Chung, and J. Wong. 2014. “Identifying the critical success factors for relationship management in PPP projects.” Int. J. Project Manage. 32 (2): 265–274. https://doi.org/10.1016/j.ijproman.2013.05.004.

Information & Authors

Information

Published In

Go to Journal of Infrastructure Systems
Journal of Infrastructure Systems
Volume 29Issue 4December 2023

History

Received: Feb 2, 2023
Accepted: Aug 18, 2023
Published online: Oct 11, 2023
Published in print: Dec 1, 2023
Discussion open until: Mar 11, 2024

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Ph.D. Candidate, Business School, Sichuan Univ., Chengdu 610065, China; Ph.D. Candidate, Dept. of Architecture and Civil Engineering, City Univ. of Hong Kong, Hong Kong 999077, China. ORCID: https://orcid.org/0000-0003-4737-1944. Email: [email protected]
Xiaoli Wang [email protected]
Master’s Student, Business School, Sichuan Univ., Chengdu 610065, China. Email: [email protected]
Master’s Student, Business School, Sichuan Univ., Chengdu 610065, China. Email: [email protected]
Chuan Chen, Ph.D. [email protected]
Professor, Business School, Sichuan Univ., Chengdu 610065, China (corresponding author). Email: [email protected]
Igor Martek, Ph.D. [email protected]
Senior Lecturer, School of Architecture and Built Environment, Deakin Univ., VIC 3217, Australia. Email: [email protected]
Xiaowei Luo, Ph.D. [email protected]
Associate Professor, Dept. of Architecture and Civil Engineering, City Univ. of Hong Kong, Hong Kong 999077, China. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share