Abstract

Project monitoring has become crucial to the success of organizations in an increasingly competitive industrial environment. As such, earned value management (EVM) is an essential part of project cost control. Over the years, the scientific literature has mainly focused on developing mathematical models to improve EVM, whereas very few researchers have examined the implementation of EVM in organizations. Although some standards provide general guidelines for implementing the methodology, they rarely consider the maturity of the organization or the strategy required to implement it. This paper aims to develop an EVM implementation plan method for organizations. The method identifies the activities to be carried out, their sequencing, and the corresponding roles, techniques, and deliverables associated with each activity. The analysis of this phase of the existing situation allows for a consideration of the organization’s maturity level based on a process mapping analysis and its audit of the organization. Relevant recommendations are then identified before defining EVM implementation strategies according to the organization’s needs, constraints, and resources. Interviews with professionals allowed for the verification of the relevance of the recommendations before assigning them to the defined implementation strategies at every stage of implementation. The impact of each strategy on the organization’s processes is mapped and analyzed to determine the expected costs and benefits. The implementation method was tested successfully within a firm.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

No data, models, or code were generated or used during the study.

References

AACE (American Association of Cost Engineering) International. 2017. Earned value management (EVM): Overview and recommended practices consistent with EIA-748-C. 82R-13. Morgantown, WV: AACE.
Anbari, F. 2003. “Earned value project management method and extensions.” Project Manage. J. 34 (4): 12–23. https://doi.org/10.1177/875697280303400403.
Aramali, V., G. E. Gibson, M. El Asmar, and N. Cho. 2021. “Earned value management system state of practice: Identifying critical subprocesses, challenges, and environment factors of a high-performing EVMS.” J. Manage. Eng. 37 (4): 04021031. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000925.
Australian Standard. 2006. Project performance measurement using earned value. Sydney: Standards Australia.
Bgherpour, M. 2011. “An extension to earned value management.” Cost Manage. 25 (3): 41–47.
Blessing, L., and A. Chakrabarti. 2009. DRM, a design research methodology. London: Springer.
Budd, C. I., and C. S. Budd. 2005. A practical guide to earned value project management. Vienna, VA: Management Concepts.
Cable, J. H., J. F. Ordonez, G. Chintalapani, and C. Plaisant. 2004. “Project portfolio earned value management using treemaps.” In Proc., PMI Research Conf.: Innovations. Newtown Square, PA: Project Management Institute.
Christensen, D. S. 1998. “The costs and benefits of the earned value management process.” Acquis. Rev. Q. 18 (2): 373–386.
Christensen, D. S., and S. R. Heise. 1993. “Cost performance index stability.” Natl. Contract Manage. J. 25 (1): 7–15.
Czarnigowska, A., P. Jaskowski, and S. Biruk. 2011. “Project performance reporting and prediction: Extension of earned value management.” Int. J. Bus. Manage. Stud. 3 (1): 11–20.
Fleming, Q., and J. Koppelman. 2005. Earned value project management. 3rd ed. Newtown Square, PA: Project Management Institute.
Fleming, Q., and J. Koppelman. 2006. “Start with ‘simple’ earned value on all your projects.” CrossTalk J. Def. Software Eng. 19 (6): 16–19.
Fullwood, D., and K. Samuels. 2008. Putting earned value management (EVM) in perspective, 80–82. Fort Belvoir, VA: Army Acquisition, Logistics & Technology.
ISO. 2018. Earned value management in project and programme management. Geneva: ISO.
Jarnagan, H. W. 2009. “Lessons learned in using earned value systems (a case study).” In Proc., AACE Transaction. Morgantown, WV: AACE.
Kerby, J. G., and S. M. Counts. 2008. “The benefits of earned value management from a project manager’s perspective.” Accessed January 5, 2020. https://www.nasa.gov/pdf/293270main_63777main_kerby_counts_forum9.pdf.
Kim, E., W. G. Wells, and M. R. Duffey. 2003. “A model for effective implementation of earned value management methodology.” Int. J. Project Manage. 21 (5): 375–382. https://doi.org/10.1016/S0263-7863(02)00049-2.
Kwon, O., S. Kim, J. Paek, and S. Eom. 2008. “Application of earned value in the Korean construction industry.” J. Asian Archit. Build. Eng. 7 (1): 69–76. https://doi.org/10.3130/jaabe.7.69.
Lipke, W., O. Zwikael, K. Henderson, and F. Anbari. 2009. “Prediction of project outcome, the application of statistical methods to earned value management and earned schedule performance indexes.” Int. J. Project Manage. 27 (4): 400–407. https://doi.org/10.1016/j.ijproman.2008.02.009.
Lukas, J. A. 2008. “Earned value analysis—Why it doesn’t work.” In Proc., AACE Int. Transactions, EVM.01. Morgantown, WV: AACE.
Morad, M., and S. El-Sayegh. 2016. “Use of earned value management in the UAE construction industry.” In Proc., 2016 Int. Conf. on Industrial Engineering, Management Science and Application (ICIMSA), 1–5. New York: IEEE.
Moselhi, O. 2011. “The use of earned value in forecasting project durations.” In Proc., 28th Int. Symp. on Automation and Robotic in Construction, 689–693. Seoul: International Association for Automation and Robotic in Construction.
Mosser, J., R. Pellerin, M. Bourgault, C. Danjou, and N. Perrier. 2022. “GRMI4.0: A guide for representing and modeling Industry 4.0 business processes.” Bus. Process Manage. J. 28 (4): 1047–1070. https://doi.org/10.1108/BPMJ-12-2021-0758.
Naderpour, A., and M. Mofid. 2011. “Improving construction management of an educational center by applying earned value technique.” Procedia Eng. 14 (Jun): 1945–1952. https://doi.org/10.1016/j.proeng.2011.07.244.
NDIA (National Defense Industrial Association). 2018. Earned value management systems EIA-748-D intent guide. Arlington, VA: Integrated Program Management Division.
Nkiwane, N. H., W. G. Meyer, and H. Steyn. 2016. “The use of earned value management for initiating directive project control decision.” S. Afr. J. Ind. Eng. 27 (1): 192–203. https://doi.org/10.7166/27-1-1260.
Pajares, J., and A. Lopes-Paredes. 2011. “An extension of the EVM analysis for project monitoring: The cost index and the schedule control index.” Int. J. Project Manage. 29 (5): 615–621. https://doi.org/10.1016/j.ijproman.2010.04.005.
Pellerin, R., and N. Perrier. 2018. “A review of methods, techniques and tools for project planning and control.” Int. J. Prod. Res. 57 (7): 2160–2178. https://doi.org/10.1080/00207543.2018.1524168.
PMI (Project Management Institute). 2011. Practice standard for earned value management. 2nd ed. Newtown Square, PA: PMI.
PMI (Project Management Institute). 2017. A guide to the project management body of knowledge (PMBOK guide). 6th ed. Newtown Square, PA: PMI.
PMI (Project Management Institute). 2019. The standard for earned value management. Newtown Square, PA: PMI.
Russell, S. 2008. “Earned value management uses and misuses.” Air Force J. Logist. 33 (2): 86–92.
Song, L., and H. Shalini. 2009. “A global and cross-industry perspective on earned value management practice and future trends.” In Construction management: Survey summary report. Houston: Univ. of Houston.
Sparrow, H. 2000. “EVM = EVM: Earned value management results in early visibility and management opportunities.” In Proc., Project Management Institute Annual Seminars & Symp. Newtown Square, PA: Project Management Institute.
Stone, C. 2023. “Challenges and opportunities of completing successful projects using earned value management.” Open J. Bus. Manage. 11 (2): 464–493. https://doi.org/10.4236/ojbm.2023.112025.
Storms, K. 2008. “ Earned value management implementation in an agency capital improvement program: A publication of the american association of cost engineers.” Cost Eng. 50 (12): 17–20.
Sunarti, N., Z. Pakir Mastan, and L. Seon Cin. 2018. “The application and challenges of earned value management (EVM) as cost monitoring tool in the construction industry.” Int. J. Eng. Technol. 7 (3.36): 96–100. https://doi.org/10.14419/ijet.v7i3.36.29086.
Valle, J. A., and C. A. P. Soares. 2006. “The use of EVA–earned value analysis in the cost management of construction projects.” In Proc., PMI Global Congress 2006—EMEA. Newtown Square, PA: Project Management Institute.
Van De Velde, R. 2007. “Time is up: Assessing schedule performance with earned value.” PM World Today 9 (10): 1–10.
Vargas, R. V. 2003. “Earned value analysis in the control of projects: Success or failure?” AACE Int. Transact. 21 (4): 211–214.
Warburton, R. 2011. “A time-dependent earned value model for software projects.” Int. J. Project Manage. 29 (8): 1082–1090. https://doi.org/10.1016/j.ijproman.2011.02.008.
Webb, A. 2003. Using earned value, a project manager’s guide. Burlington, VT: Gower.
Zellner, G. 2011. “A structured evaluation of business process improvement approaches.” Bus. Process Manage. J. 17 (2): 203–237. https://doi.org/10.1108/14637151111122329.
Zhan, Z., C. Wang, J. B. H. Yap, S. Samsudin, and H. Abdul-Rahman. 2019. “Earned value analysis, implementation barriers, and maturity level in oil & gas production.” S. Afr. J. Ind. Eng. 30 (4): 44–59. https://doi.org/10.7166/30-4-2030.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 150Issue 12December 2024

History

Received: Jan 15, 2024
Accepted: Jun 24, 2024
Published online: Sep 23, 2024
Published in print: Dec 1, 2024
Discussion open until: Feb 23, 2025

Permissions

Request permissions for this article.

Authors

Affiliations

Quentin Panquet [email protected]
Dept. of Mathematics and Industrial Engineering, Polytechnique Montréal, C.P. 6079, Succursale Centre-ville, Montréal, QC, Canada H3C 3A7. Email: [email protected]
Mario Bourgault, Ph.D. [email protected]
Full Professor, Dept. of Mathematics and Industrial Engineering, Polytechnique Montréal, C.P. 6079, Succursale Centre-ville, Montréal, QC, Canada H3C 3A7. Email: [email protected]
Full Professor, Dept. of Mathematics and Industrial Engineering, Polytechnique Montréal, C.P. 6079, Succursale Centre-ville, Montréal, QC, Canada H3C 3A7. ORCID: https://orcid.org/0000-0001-7486-3579. Email: [email protected]
Associate Professor, Dept. of Mathematics and Industrial Engineering, Polytechnique Montréal, C.P. 6079, Succursale Centre-ville, Montréal, QC, Canada H3C 3A7. ORCID: https://orcid.org/0000-0002-9575-0087. Email: [email protected]
Research Professional, Dept. of Mathematics and Industrial Engineering, Polytechnique Montréal, C.P. 6079, Succursale Centre-ville, Montréal, QC, Canada H3C 3A7 (corresponding author). ORCID: https://orcid.org/0000-0002-5472-9548. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share