Stakeholder Dynamics: Rethinking Roles and Responsibilities in User-Pay Transport PPP Projects

Publication: Journal of Construction Engineering and Management
Volume 150, Issue 8

Abstract

Public–private partnership (PPP) stakeholders have gained traction for their potential to create long-term value. Extant literature emphasizes the importance of suitable stakeholder management strategies, yet the analysis of such strategies has traditionally been conducted from the viewpoint of the responsible parties (i.e., the PPP consortium and the contracting agency) because these are the stakeholders in charge of developing the project and delivering its much-expected benefits. While extant literature often focuses on the interests of either responsible stakeholders or impacted stakeholders, this study addresses the critical but underexplored dynamics involving the wide arrangement of responsible, impacted, and interested stakeholders encompassing diverse groups, such as local communities, interest groups, advisors, local governments, users, and debt providers, who interact and shape project outcomes. Drawing lessons from a multiple-case study involving two mature toll road markets composed of 49 projects, this research reveals the main stakeholders’ issues at three different levels: institutional, organizational, and project. To address these challenges, a relational governance model is proposed where each identified stakeholder should play a specific role in key decisions made in specific project phases. This study provides insights into stakeholder dynamics in user-pay transport PPPs, offering solutions for enhanced engagement and project outcomes. This research offers relevant theoretical contributions to rethinking the roles of impacted and interested stakeholders in PPPs, and these insights have practical implications for improving stakeholder engagement, risk management, and project outcomes in user-pay transportation PPPs.

Formats available

You can view the full content in the following formats:

Data Availability Statement

Some or all data, models, or codes that support the findings of this study are available from the corresponding author upon reasonable request.

Acknowledgments

The authors would like to thank the Vice Presidency of Research and Creation’s Publication Fund at Universidad de los Andes for its financial support.

References

Amadi, C., P. Carrillo, and M. Tuuli. 2018. “Stakeholder management in PPP projects: External stakeholders’ perspective.” Built Environ. Project Asset Manage. 8 (4): 403–414. https://doi.org/10.1108/BEPAM-02-2018-0048.
Amadi, C., P. Carrillo, and M. Tuuli. 2020. “PPP projects: Improvements in stakeholder management.” Eng. Constr. Archit. Manage. 27 (2): 544–560. https://doi.org/10.1108/ECAM-07-2018-0289.
Benítez-Ávila, C., A. Hartmann, G. Dewulf, and J. Henseler. 2018. “Interplay of relational and contractual governance in public-private partnerships: The mediating role of relational norms, trust and partners ’ contribution.” Int. J. Project Manage. 36 (3): 429–443. https://doi.org/10.1016/j.ijproman.2017.12.005.
Berrone, P., J. E. Ricart, A. I. Duch, V. Bernardo, J. Salvador, J. P. Peña, and M. R. Planas. 2019. “EASIER: An evaluation model for public-private partnerships contributing to the sustainable development goals.” Sustainable 11 (8): 2339. https://doi.org/10.3390/su11082339.
Biygautane, M., C. Neesham, and K. O. Al-Yahya. 2019. “Institutional entrepreneurship and infrastructure public-private partnership (PPP): Unpacking the role of social actors in implementing PPP projects.” Int. J. Project Manage. 37 (1): 192–219. https://doi.org/10.1016/j.ijproman.2018.12.005.
Biziorek, S., A. De Marco, and G. Castelblanco. 2023. “Public-private partnership national programs through the portfolio perspective: A system dynamics model of the UK PFI/PF2 programs.” In Proc., 39th Annual ARCOM Conf., 1–12. Leeds, UK: Association of Researchers in Construction Management.
Biziorek, S., A. De Marco, J. Guevara, and G. Castelblanco. 2024. “Enhancing the public investment in public-private partnerships using system dynamics modeling.” In Proc., 2023 Winter Simulation Conf. New York: IEEE.
Boyer, E. J. 2019. “How does public participation affect perceptions of public–private partnerships? A citizens’ view on push, pull, and network approaches in PPPs.” Public Manage. Rev. 21 (10): 1464–1485. https://doi.org/10.1080/14719037.2018.1559343.
Caldwell, N. D., J. K. Roehrich, and G. George. 2017. “Social value creation and relational coordination in public-private collaborations.” J. Manage. Stud. 54 (6): 906–928. https://doi.org/10.1111/joms.12268.
Carpintero, S., J. M. Vassallo, and A. Sánchez Soliño. 2013. “Dealing with traffic risk in Latin American toll roads.” J. Manage. Eng. 31 (2): 1–10. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000266.
Castelblanco, G., E. M. Fenoaltea, A. De Marco, P. Demagistris, S. Petruzzi, and D. Zeppegno. 2024. “Combining stakeholder and risk management: Multilayer network analysis for complex megaprojects.” J. Constr. Eng. Manage. 150 (2): 1–12. https://doi.org/10.1061/JCEMD4.COENG-13807.
Castelblanco, G., and J. Guevara. 2022. “Building bridges: Unraveling the missing links between public-private partnerships and sustainable development.” Project Leadersh. Soc. 3 (100059): 1–10. https://doi.org/https://doi.org/10.1016/j.plas.2022.100059.
Castelblanco, G., J. Guevara, and P. Mendez-Gonzalez. 2021. “Sustainability in PPPs: A network analysis.” In Interdisciplinary civil and construction engineering projects, 1–6. Fargo, ND: ISEC Press.
Castelblanco, G., J. Guevara, and P. Mendez-Gonzalez. 2022a. “In the name of the pandemic: A case study of contractual modifications in PPP solicited and unsolicited proposals in COVID-19 times.” In Proc., Construction Research Congress 2022, 50–58. Reston, VA: ASCE.
Castelblanco, G., J. Guevara, H. Mesa, and D. Flores. 2020. “Risk allocation in unsolicited and solicited road public-private partnerships: Sustainability and management implications.” Sustainable 12 (11): 1–28. https://doi.org/10.3390/su12114478.
Castelblanco, G., J. Guevara, H. Mesa, and A. Hartmann. 2022b. “Social legitimacy challenges in toll road PPP programs: Analysis of the Colombian and Chilean cases.” J. Manage. Eng. 38 (3): 1–15. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001010.
Castelblanco, G., J. Guevara, D. Rojas, J. Correa, and K. Verhoest. 2023. “Environmental impact assessment effectiveness in public–private partnerships: Study on the Colombian road program.” J. Manage. Eng. 39 (2): 19. https://doi.org/10.1061/JMENEA.MEENG-5015.
CCE (Colombia Compra Eficiente). 2023. “Search recruitment process.” SECOP. Accessed June 30, 2023. https://community.secop.gov.co/Public/Tendering/ContractNoticeManagement/Index?currentLanguage=es-CO&Page=login&Country=CO&SkinName=CCE.
Charney, J., P. Marshall, and E. Christodoulidis. 2021. “‘It is not 30 Pesos, It is 30 years’: Reflections on the Chilean crisis: Introduction.” Social and Legal Stud. 30 (4). https://doi.org/10.1177/0964663920986432.
Chung, D., D. A. Hensher, and J. M. Rose. 2010. “Toward the betterment of risk allocation: Investigating risk perceptions of Australian stakeholder groups to public e private-partnership tollroad projects.” Res. Transp. Econ. 30 (1): 43–58. https://doi.org/10.1016/j.retrec.2010.10.007.
Chung, K. S. K., P. Eskerod, A. L. Jepsen, and J. Zhang. 2023. “Response strategies for community stakeholder engagement on social media: A case study of a large infrastructure project.” Int. J. Project Manage. 41 (5): 102495. https://doi.org/10.1016/j.ijproman.2023.102495.
Clark, R. M., and S. Hakim. 2019. Public private partnerships: Construction, protection, and rehabilitation of critical infrastructure. Berlin: Springer.
Close, R., and M. Loosemore. 2014. “Breaking down the site hoardings: Attitudes and approaches to community consultation during construction.” Construct. Manage. Econ. 32 (7–8): 816–828. https://doi.org/10.1080/01446193.2013.879195.
Cruz-Castro, L., G. Castelblanco, and P. Antonenko. 2024. “A pilot study on LLM-based system for technical writing review in urban construction and technology.” In Proc., 60th Association Construction Annual Int. Conf. Loveland, CO: Association of Schools of Construction.
De Clerck, D., and E. Demeulemeester. 2016. “Creating a more competitive PPP procurement market: Game theoretical analysis.” J. Manage. Eng. 32 (6): 04016015. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000440.
Derakhshan, R., M. Mancini, and J. R. Turner. 2019a. “Community’s evaluation of organizational legitimacy: Formation and reconsideration.” Int. J. Project Manage. 37 (1): 73–86. https://doi.org/10.1016/j.ijproman.2018.10.004.
Derakhshan, R., R. Turner, and M. Mancini. 2019b. “Project governance and stakeholders: A literature review.” Int. J. Project Manage. 37 (1): 98–116. https://doi.org/10.1016/j.ijproman.2018.10.007.
Dewulf, G., and M. J. Garvin. 2020. “Responsive governance in PPP projects to manage uncertainty.” Construct. Manage. Econ. 38 (4): 383–397. https://doi.org/10.1080/01446193.2019.1618478.
Di Maddaloni, F., and K. Davis. 2018. “Project manager’s perception of the local communities’ stakeholder in megaprojects. An empirical investigation in the UK.” Int. J. Project Manage. 36 (3): 542–565. https://doi.org/10.1016/j.ijproman.2017.11.003.
Di Maddaloni, F., and L. Sabini. 2022. “Very important, yet very neglected: Where do local communities stand when examining social sustainability in major construction projects?” Int. J. Project Manage. 40 (7): 778–797. https://doi.org/10.1016/j.ijproman.2022.08.007.
Dolla, T., and B. Laishram. 2020. “Governance issues in PPP procurement options analysis of social infrastructure: Case of Indian waste management sector.” J. Infrastruct. Syst. 26 (4): 1–21. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000578.
El Asmar, M., A. S. Hanna, and W.-Y. Loh. 2013. “Quantifying performance for the integrated project delivery system as compared to established delivery systems.” J. Constr. Eng. Manage. 139 (11): 1–14. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000744.
El Kawam, K., T. Narbaev, A. De Marco, and G. Castelblanco. 2024. “Decoding Eastern European national public-private partnership infrastructure programs.” In Eurasian studies in business and economics. Istanbul, Turkey: Eurasian Studies in Business and Economics.
Engel, E., R. D. Fischer, and A. Galetovic. 2020. When and how to use public-private partnerships in infrastructure: Lessons from the international experience. Cambridge, MA: National Bureau of Economic Research.
Erk, E. Y., C. Budayan, K. Koc, and O. B. Tokdemir. 2023. “Value creation in PPP projects undertaken in the Turkish healthcare industry.” J. Constr. Eng. Manage. 149 (11): 1–15. https://doi.org/10.1061/jcemd4.coeng-13473.
Fedorova, E., K. Aaltonen, and E. Pongr. 2020. “Social sustainability dilemma: Escape or communicate? Managing social risks upstream of the bionergy supply chain.” Resources 9 (1): 1–17. https://doi.org/10.3390/resources9010007.
Flyvbjerg, B., M. K. S. Holm, and S. L. Buhl. 2007. “Inaccuracy in traffic forecasts.” Transp. Rev. 26 (1): 1–24. https://doi.org/10.1080/01441640500124779.
Francisco de Oliveira, G., and R. Rabechini. 2019. “Stakeholder management influence on trust in a project: A quantitative study.” Int. J. Project Manage. 37 (1): 131–144. https://doi.org/10.1016/j.ijproman.2018.11.001.
Ghadimi, B. 2017. “Impact of project delivery method on stakeholder issues and involvement practices in megaprojects: Evidence from fixed crossing case studies.” Ph.D. thesis, Doctor of Philosophy in Civil Engineering, Dept. of Faculty of Civil Engineering, Virginia Polytechnic Institute and State Univ.
Gifford, J. L., L. A. Bolaños, N. Daito, and C. B. Casady. 2023. “What triggers public-private partnership (PPP) renegotiations in the United States?” Public Manage. Rev. 2023 (Apr): 1–27. https://doi.org/10.1080/14719037.2023.2200404.
Gil, N. A. 2023. “Cracking the megaproject puzzle: A stakeholder perspective?” Int. J. Project Manage. 41 (3): 102455. https://doi.org/10.1016/j.ijproman.2023.102455.
Guevara, J., M. J. Garvin, and N. Ghaffarzadegan. 2020. “The forest and the trees: A systems map of governance interdependencies in the shaping phase of road public-private partnerships.” J. Manage. Eng. 36 (1). https://doi.org/10.1061/(ASCE)ME.1943-5479.0000726.
Guevara, J., L. Herrera, and J. Salazar. 2022. “Interorganizational sponsor networks in road and social infrastructure PPP equity markets.” J. Constr. Eng. Manage. 148 (4): 1–20. https://doi.org/10.1061/(asce)co.1943-7862.0002255.
Guevara, J., D. Rojas, R. Khallaf, and G. Castelblanco. 2024. “Navigating PPP renegotiations in the wake of COVID-19: Insights from a toll road program.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 16 (1): 1–13. https://doi.org/10.1061/JLADAH.LADR-1082.
Heikkila, T., and K. R. Isett. 2007. “Citizen involvement and performance management in special-purpose governments.” Public Adm. Rev. 67 (2): 238–248. https://doi.org/10.1111/j.1540-6210.2007.00710.x.
Herian, M. N., J. A. Hamm, A. J. Tomkins, and L. M. Pytlik Zillig. 2012. “Public participation, procedural fairness, and evaluations of local governance: The moderating role of uncertainty.” J. Public Adm. Res. Theory 22 (4): 815–840. https://doi.org/10.1093/jopart/mur064.
Innes, J. E., and D. E. Booher. 2004. “Reframing public participation: Strategies for the 21st century.” Plan. Theory Pract. 5 (4): 419–436. https://doi.org/10.1080/1464935042000293170.
Jolley, G. J. 2007. “Public involvement tools in environmental decision-making: A primer for practitioners.” J. Ext. 45 (2): 26. https://doi.org/10.1111/j.1540-6210.2007.00710.x.
Kågström, M. 2016. “Between ‘best’ and ‘good enough’: How consultants guide quality in environmental assessment.” Environ. Impact Assess. Rev. 60 (Sep): 169–175. https://doi.org/10.1016/j.eiar.2016.05.003.
Khallaf, R., J. Guevara, P. Mendez-Gonzalez, and G. Castelblanco. 2024. “A system dynamics model for a national PPP program: The Egyptian project portfolio.” In Proc., Construction Research Congress 2024. Reston, VA: ASCE.
Khan, M., M. Nawaz, S. Rashid, and S. Saif. 2018. “Challenges to EIA consultants whilst dealing with stakeholders in Punjab, Pakistan.” Environ. Impact Assess. Rev. 73 (Sep): 201–209. https://doi.org/10.1016/j.eiar.2018.09.001.
Kier, C., K. Aaltonen, J. Whyte, and M. Huemann. 2023. “How projects co-create value with stakeholders: The role of ideology and inquiry in spanning the temporary-permanent boundary.” Int. J. Project Manage. 41 (5): 102482. https://doi.org/10.1016/j.ijproman.2023.102482.
Kivilä, J., M. Martinsuo, and L. Vuorinen. 2017. “Sustainable project management through project control in infrastructure projects.” Int. J. Project Manage. 35 (6): 1167–1183. https://doi.org/10.1016/j.ijproman.2017.02.009.
Kivleniece, I., and B. V. Quelin. 2012. “Creating and capturing value in public-private ties: A private actor’s perspective.” Acad. Manage. Rev. 37 (2): 272–299. https://doi.org/10.5465/amr.2011.0004.
Kroh, J., and C. Schultz. 2023. “In favor or against: The influence of skeptical stakeholders in urban innovation projects for green transformation.” Int. J. Project Manage. 41 (7): 102515. https://doi.org/10.1016/j.ijproman.2023.102515.
Kumar, A., V. Srivastava, and M. I. Tabash. 2021. “Infrastructure project finance: A systematic literature review and directions for future research.” Qual. Res. Financ. Mark. 13 (3): 295–327. https://doi.org/10.1108/QRFM-07-2020-0130.
Levitt, R. E., M. J. Garvin, W. R. Scott, G. Dewulf, A. Monk, and A. South. 2014. “Toward an integrated lifecycle governance framework for delivering civil infrastructure projects through public-private partnerships (P3s).” In Proc., Engineering Project Organization Conf. Louisville, CO: Engineering Project Organization Society.
Levitt, R. E., W. Henisz, and D. Settel. 2009. “Defining and mitigating the governance challenges of infrastructure project development and delivery.” In Proc., Conf. on Leadership and Management of Construction. Reston, VA: ASCE.
Li, W., J. Yuan, G. Zhang, S. Wei, B. Zhang, and M. J. Skibniewski. 2023. “Agent-based simulation modeling for the evaluation and dynamic adjustment of project benefits in urban rail transit PPPs.” J. Manage. Eng. 39 (2): 1–24. https://doi.org/10.1061/jmenea.meeng-4682.
Liu, L. X., S. Clegg, and J. Pollack. 2022. “Topic: Power relations in the finance of infrastructure public-private partnership projects.” Int. J. Project Manage. 40 (7): 725–740. https://doi.org/10.1016/j.ijproman.2022.08.002.
Ma, H., Z. Liu, S. Zeng, H. Lin, and V. W. Y. Tam. 2020. “Does megaproject social responsibility improve the sustainability of the construction industry?” Eng. Constr. Archit. Manage. 27 (4): 975–996. https://doi.org/10.1108/ECAM-07-2019-0363.
Marcellino, M., G. Castelblanco, and A. De Marco. 2023. “Contract renegotiation in PPPs: Evidence from Italy.” AIP Conf. Proc. 2928 (1): 10. https://doi.org/10.1063/5.0170424.
Martinsuo, M. 2020. “The management of values in project business: Adjusting beliefs to transform project practices and outcomes.” Project Manage. J. 51 (4): 389–399. https://doi.org/10.1177/8756972820927890.
Martinsuo, M. M., L. Vuorinen, and C. Killen. 2019. “Lifecycle-oriented framing of value at the front end of infrastructure projects.” Int. J. Manage. Project Bus. 12 (3): 617–643. https://doi.org/10.1108/IJMPB-09-2018-0172.
Montalbán-Domingo, L., T. García-Segura, M. Amalia Sanz, and E. Pellicer. 2018. “Social sustainability in delivery and procurement of public construction contracts.” J. Manage. Eng. 35 (2): 1–11. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000674.
MOP (Ministry of Public Works). 2023. “Concesiones.” Dirección General de Concesiones.” Accessed June 30, 2023. https://concesiones.mop.gob.cl/proyectos/Paginas/default.aspx.
Mostafa, M. A., and N. M. El-Gohary. 2014. “Semantic system for stakeholder-conscious infrastructure project planning and design.” J. Constr. Eng. Manage. 141 (2): 1–14. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000868.
Musenero, L., B. Baroudi, and I. Gunawan. 2023. “Critical issues affecting dispute resolution practice in infrastructure public–private partnerships.” J. Constr. Eng. Manage. 149 (3): 1–12. https://doi.org/10.1061/JCEMD4.COENG-12902.
Nederhand, J., and E. H. Klijn. 2019. “Stakeholder involvement in public–private partnerships: Its influence on the innovative character of projects and on project performance.” Adm. Soc. 51 (8): 1200–1226. https://doi.org/10.1177/0095399716684887.
Nguyen, D. A., M. J. Garvin, and E. E. Gonzalez. 2018. “Risk allocation in U.S. public-private partnership highway project contracts.” J. Constr. Eng. Manage. 144 (5): 04018017. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001465.
Nikulina, A., L. Volker, and M. Bosch-Rekveldt. 2022. “The interplay of formal integrative mechanisms and relational norms in project collaboration.” Int. J. Project Manage. 40 (7): 798–812. https://doi.org/10.1016/j.ijproman.2022.08.006.
Ninan, J., A. Mahalingam, and S. Clegg. 2019. “External stakeholder management strategies and resources in megaprojects: An organizational power perspective.” Project Manage. J. 50 (6): 625–640. https://doi.org/10.1177/8756972819847045.
Ortiz-Mendez, L., A. De Marco, and G. Castelblanco. 2023. “Building information modeling for risk management: A literature review.” In Proc., Int. Conf. on Business and Technology, edited by B. Alareeni, A. Hamdan, R. Khamis, and R. E. Khoury. Berlin: Springer.
Osei-Kyei, R., and A. P. C. Chan. 2017. “Empirical comparison of critical success factors for public-private partnerships in developing and developed countries: A case of Ghana and Hong Kong.” Eng. Constr. Archit. Manage. 24 (6): 1222–1245. https://doi.org/10.1108/ECAM-06-2016-0144.
Ottaviani, F. M., A. De Marco, C. Rafele, and G. Castelblanco. 2024. “Risk perception-based project contingency management framework.” Systems 12 (3): 93. https://doi.org/10.3390/systems12030093.
Reed, M. S. 2008. “Stakeholder participation for environmental management: A literature review.” Biol. Conserv. 141 (10): 2417–2431. https://doi.org/10.1016/j.biocon.2008.07.014.
Reeves, E. 2013. “The not so good, the bad and the ugly: Over twelve years of PPP in Ireland.” Local Gov. Stud. 39 (3): 375–395. https://doi.org/10.1080/03003930.2013.781023.
Rojas, D., J. Guevara, R. Khallaf, J. Salazar, A. De Marco, and G. Castelblanco. 2023. “NLP and SNA for understanding renegotiations of toll road PPPs amid the COVID-19 pandemic.” In Proc., Int. Structure Engineering Construction. Fargo, ND: ISEC Press.
Rojas, R., G. Bennison, V. Gálvez, E. Claro, and G. Castelblanco. 2020. “Advancing collaborative water governance: Unravelling stakeholders ’ relationships and influences in contentious river basins.” Water 12 (3316): 1–25. https://doi.org/10.3390/w12123316.
Rufín, C., and M. Rivera-santos. 2012. “Between commonweal and competition: Understanding the governance of public–private partnerships.” J. Manage. 38 (5): 1634–1654. https://doi.org/10.1177/0149206310373948.
Salazar, J., J. Guevara, and G. Castelblanco. 2024. “Network structures and project complexity in environmental impact assessment outcomes: A Colombian case study.” In Proc., Construction Research Congress 2024. Reston, VA: ASCE.
Shen, W., W. Tang, Y. Wang, C. F. Duffield, F. K. P. Hui, and L. Zhang. 2021. “Managing interfaces in large-scale projects: The roles of formal governance and partnering.” J. Constr. Eng. Manage. 147 (7): 1–12. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002101.
South, A., K. Eriksson, and R. Levitt. 2018. “How infrastructure public–private partnership projects change over project development phases.” Project Manage. J. 49 (4): 62–80. https://doi.org/10.1177/8756972818781712.
Tariq, S., and X. Zhang. 2021. “Socioeconomic, macroeconomic, and sociopolitical issues in water PPP failures.” J. Manage. Eng. 37 (5): 04021047. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000947.
Villalba-Romero, F., and C. Liyanage. 2016a. “Evaluating success in PPP road projects in Europe: A comparison of performance measurement approaches.” Transp. Res. Procedia 14 (Jun): 372–381. https://doi.org/10.1016/j.trpro.2016.05.089.
Villalba-Romero, F., and C. Liyanage. 2016b. “Implications of the use of different payment models: The context of PPP Road Projects in the UK.” Int. J. Manage. Project Bus. 9 (1): 11–32. https://doi.org/10.1108/IJMPB-09-2015-0095.
Winata, L. E., and Y. M. Gultom. 2023. “The effects of governance on performance: The case of public–private partnership (PPP) toll roads in Indonesia.” Int. J. Constr. Manage. 2023 (Jun): 1–9. https://doi.org/10.1080/15623599.2023.2219937.
Witz, P., V. Stingl, M. Wied, and J. Oehmen. 2021. “Asymmetric legitimacy perception across megaproject stakeholders: The case of the Fehmarnbelt fixed link.” Int. J. Project Manage. 39 (4): 377–393. https://doi.org/10.1016/j.ijproman.2021.01.006.
Yang, X., L. Wang, F. Zhu, and R. Müller. 2022. “Prior and governed stakeholder relationships: The key to resilience of inter-organizational projects.” Int. J. Project Manage. 40 (1): 64–75. https://doi.org/10.1016/j.ijproman.2021.10.001.
Yin, R. K. 2003. Case study research: Design and methods. Thousand Oaks, CA: SAGE.
Yin, R. K. 2018. Case study research and applications. Thousand Oaks, CA: SAGE.
Zhang, D., P. Guo, and J. Zhao. 2022. “The motives system for developing project-based inter-organizational cooperation.” Int. J. Project Manage. 40 (3): 167–180. https://doi.org/10.1016/j.ijproman.2021.11.010.
Zhang, S., and R. Leiringer. 2023. “Closing capability gaps for procuring infrastructure public-private partnerships: A case study in China.” Int. J. Project Manage. 41 (6): 102497. https://doi.org/10.1016/j.ijproman.2023.102497.
Zhang, Z., D. Wan, M. Jia, and L. Gu. 2009. “Prior ties, shared values and cooperation in public–private partnerships.” Manage. Organ. Rev. 5 (3): 353–374. https://doi.org/10.1111/j.1740-8784.2009.00154.x.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 150Issue 8August 2024

History

Received: Sep 1, 2023
Accepted: Feb 12, 2024
Published online: May 31, 2024
Published in print: Aug 1, 2024
Discussion open until: Oct 31, 2024

ASCE Technical Topics:

Authors

Affiliations

Assistant Professor, M.E. Rinker, Sr. School of Construction Management, Univ. of Florida, Gainesville, FL 32611. ORCID: https://orcid.org/0000-0001-6820-6644. Email: [email protected]
Associate Professor, Dept. of Civil and Environmental Engineering, Universidad de los Andes, Bogota 111711, Colombia (corresponding author). ORCID: https://orcid.org/0000-0002-3485-9169. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share