Abstract

Managing design changes effectively can reduce cost overruns and schedule delays in construction projects. However, existing design change management in construction projects lacks integration with schedules, comprehensive design change information, and interoperability with other applications. This study aims to address the aforementioned limitations by presenting an integrated four-dimensional (4D) design change management model (DCMM). We developed this model by integrating design changes with 4D building information modeling (BIM) models, extracting informative data from model geometry and design files to provide essential information for design change impact analysis and management, interfacing with a data warehouse for efficient data management, and utilizing interoperable data schemas for cross-platform compatibility. The integrated 4D DCMM successfully validated its abilities through two case studies, despite certain limitations such as only focusing on tracking main structural building elements. Our study introduces significant contributions to the field of design change management in construction projects by (1) allowing design changes tracking along construction progress, thus enhancing project controls and facilitating effective communication among project teams, (2) providing comprehensive information for design change management and assessing structural integrity risks resulting from design changes, thereby improving inspection practices in construction projects, and (3) enabling universal interoperability of design change management files across various BIM applications, enhancing construction data asset management.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.

References

Abdulfattah, B. S., H. A. Abdelsalam, M. Abdelsalam, M. Bolpagni, N. Thurairajah, L. F. Perez, and T. E. Butt. 2023. “Predicting implications of design changes in BIM-based construction projects through machine learning.” Autom. Constr. 155 (Nov): 105057. https://doi.org/10.1016/j.autcon.2023.105057.
Afzal, M., and M. T. Shafiq. 2021. “Evaluating 4D-BIM and VR for effective safety communication and training: A case study of multilingual construction job-site crew.” Buildings 11 (8): 319. https://doi.org/10.3390/buildings11080319.
Aslam, M., E. E. Baffoe-Twum, and F. Saleem. 2019. “Design changes in construction projects causes and impact on the cost.” Civ. Eng. J. 5 (7): 1647–1655. https://doi.org/10.28991/cej-2019-03091360.
Autodesk. 2022a. “Navisworks: 3D model review, coordination, and clash detection.” Accessed August 22, 2022. https://www.autodesk.com/products/navisworks/overview?term=1-YEAR&tab=subscription.
Autodesk. 2022b. “Autodesk BIM Collaborate Pro: Teams, workflows, and insights, all in one place.” Accessed August 22, 2022. https://www.autodesk.com/products/bim-collaborate/overview?term=1-YEAR&tab=subscription&plc=BIMCOLL.
Bechtel, SCE&G (South Carolina Electric & Gas), and SCPSA (South Carolina Public Service Authority). 2016. “VC summer nuclear generating station units 2 & 3: Project assessment report.” Accessed August 22, 2022. https://dms.psc.sc.gov/Attachments/Matter/72a1472c-5304-4f8c-aaa8-a5103cea03cc.
Bentley. 2022. “SYNCHRO 4D: Construction project management software.” Accessed August 22, 2022. https://virtuosity.bentley.com/product/synchro-4d/.
BIMvision. 2022. “BIMvision.” Accessed August 22, 2022. https://bimvision.eu/.
BuildingSMART. 2018. “Industry foundation classes (IFC).” Accessed August 22, 2022. https://www.buildingsmart.org/standards/bsi-standards/industry-foundation-classes/.
BuildingSMART. 2022. “IFC GUID.” Accessed August 22, 2022. https://technical.buildingsmart.org/resources/ifcimplementationguidance/ifc-guid.
Burati, J. L., Jr., J. J. Farrington, and W. B. Ledbetter. 1992. “Causes of quality deviations in design and construction.” J. Constr. Eng. Manage. 118 (1): 34–49. https://doi.org/10.1061/(ASCE)0733-9364(1992)118:1(34).
Chiu, M.-L. 2002. “An organizational view of design communication in design collaboration.” Des. Stud. 23 (2): 187–210. https://doi.org/10.1016/S0142-694X(01)00019-9.
Cox, I., J. Morris, J. Rogerson, and G. Jared. 1999. “A quantitative study of post contract award design changes in construction.” Construct. Manage. Econ. 17 (4): 427–439. https://doi.org/10.1080/014461999371358.
Den Otter, A., and S. Emmitt. 2007. “Exploring effectiveness of team communication: Balancing synchronous and asynchronous communication in design teams.” Eng. Constr. Archit. Manage. 14 (5): 408–419. https://doi.org/10.1108/09699980710780728.
Du, J., H. Jing, D. Castro-Lacouture, and V. Sugumaran. 2019. “Multi-agent simulation for managing design changes in prefabricated construction projects.” Eng. Constr. Archit. Manage. 27 (1): 270–295. https://doi.org/10.1108/ECAM-11-2018-0524.
Han, K. K., and M. Golparvar-Fard. 2015. “Appearance-based material classification for monitoring of operation-level construction progress using 4D BIM and site photologs.” Autom. Constr. 53 (Mar): 44–57. https://doi.org/10.1016/j.autcon.2015.02.007.
Hevner, A. R., S. T. March, J. Park, and S. Ram. 2004. “Design science in information systems research.” MIS Q. 28 (1): 75–105. https://doi.org/10.2307/25148625.
IfcOpenShell. 2020. “IfcConvert: An application for converting ifc geometry into several file formats.” Accessed August 22, 2022. https://ifcopenshell.sourceforge.net/ifcconvert.html.
IfcOpenShell. 2021. “IfcDiff—Compare IFCs.” Accessed August 22, 2022. https://github.com/IfcOpenShell/IfcOpenShell/blob/v0.7.0/src/ifcdiff/ifcdiff.py.
INL (Idaho National Laboratory). 2021. “Deep-Lynx.” Accessed August 22, 2022. https://github.com/idaholab/Deep-Lynx.
Jaly-Zada, A., and W. Tizani. 2016. “Design change management based on versioning the IFC models.” In Proc., 16th Int. Conf. on Computing in Civil and Building Engineering, 520–526. Montréal, Canada: International Society for Computing in Civil and Building Engineering.
Jin, Y., J. Seo, J. G. Lee, S. Ahn, and S. Han. 2020. “Bim-based spatial augmented reality (SAR) for architectural design collaboration: A proof of concept.” Appl. Sci. 10 (17): 5915. https://doi.org/10.3390/app10175915.
Karimidorabati, S., C. T. Haas, and J. Gray. 2016. “Evaluation of automation levels for construction change management.” Eng. Constr. Archit. Manage. 23 (5): 554–570. https://doi.org/10.1108/ECAM-01-2015-0013.
Kim, C., H. Son, and C. Kim. 2013. “Automated construction progress measurement using a 4D building information model and 3D data.” Autom. Constr. 31 (Nov): 75–82. https://doi.org/10.1016/j.autcon.2012.11.041.
Kjartansdóttir, I. B., S. Mordue, P. Nowak, D. Philp, and J. T. Snæbjörnsson. 2017. Building information modelling-BIM. Warszawa, Poland: Warsaw Univ. of Technology Warsaw.
Likhitruangsilp, V., T. N. Handayani, and N. Yabuki. 2018. “A BIM-enabled change detection system for assessing impacts of construction change orders.” In Proc., 17th Int. Conf. on Computing in Civil and Building Engineering. Montréal, Canada: International Society for Computing in Civil and Building Engineering.
Lin, J.-R., and Y.-C. Zhou. 2020. “Semantic classification and hash code accelerated detection of design changes in BIM models.” Autom. Constr. 115 (Mar): 103212. https://doi.org/10.1016/j.autcon.2020.103212.
Lu, Q., L. Chen, S. Li, and M. Pitt. 2020. “Semi-automatic geometric digital twinning for existing buildings based on images and CAD drawings.” Autom. Constr. 115 (Jul): 103183. https://doi.org/10.1016/j.autcon.2020.103183.
Manavazhi, M. R., and Z. Xunzhi. 2001. “Productivity oriented analysis of design revisions.” Construct. Manage. Econ. 19 (4): 379–391. https://doi.org/10.1080/01446190010017141.
Mirshokraei, M., C. I. De Gaetani, and F. Migliaccio. 2019. “A web-based BIM–AR quality management system for structural elements.” Appl. Sci. 9 (19): 3984. https://doi.org/10.3390/app9193984.
Mokhtar, A., C. Bedard, and P. Fazio. 1998. “Information model for managing design changes in a collaborative environment.” J. Comput. Civ. Eng. 12 (2): 82–92. https://doi.org/10.1061/(ASCE)0887-3801(1998)12:2(82).
Moon, H., N. Dawood, and L. Kang. 2014. “Development of workspace conflict visualization system using 4D object of work schedule.” Adv. Eng. Inf. 28 (1): 50–65. https://doi.org/10.1016/j.aei.2013.12.001.
Moretti, N., X. Xie, J. Merino, J. Brazauskas, and A. K. Parlikad. 2020. “An OpenBIM approach to IoT integration with incomplete as-built data.” Appl. Sci. 10 (22): 8287. https://doi.org/10.3390/app10228287.
Murray, J. D., and W. vanRyper. 1996. Encyclopedia of graphics file formats: The complete reference on CD-ROM with links to internet resources. 2nd ed. Sebastopol, CA: O’Reilly & Associates.
OECD and NEA (Organisation for Economic Co-operation and Development and Nuclear Energy Agency). 2020. Unlocking reductions in the construction costs of nuclear: A practical guide for stakeholders. Paris: OECD Publishing. https://doi.org/10.1787/33ba86e1-en.
Olawale, Y. A., and M. Sun. 2010. “Cost and time control of construction projects: Inhibiting factors and mitigating measures in practice.” Construct. Manage. Econ. 28 (5): 509–526. https://doi.org/10.1080/01446191003674519.
Oliveros-Romero, J. 2017. “The application of design science approach to AEC.” In Proc., 13th Int. Conf. Organization, Technology, and Management in Construction, 357–369. Zagreb, Croatia: Organization, Technology, and Management in Construction.
Panya, D. S., T. Kim, and S. Choo. 2023. “An interactive design change methodology using a BIM-based virtual reality and augmented reality.” J. Build. Eng. 68 (Mar): 106030. https://doi.org/10.1016/j.jobe.2023.106030.
Said, H. M., and J. Reginato. 2018. “Impact of design changes on virtual design and construction performance for electrical contractors.” J. Constr. Eng. Manage. 144 (1): 04017097. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001417.
Shi, X., Y.-S. Liu, G. Gao, M. Gu, and H. Li. 2018. “IfcDiff: A content-based automatic comparison approach for IFC files.” Autom. Constr. 86 (Feb): 53–68. https://doi.org/10.1016/j.autcon.2017.10.013.
Shoar, S., and N. Chileshe. 2021. “Exploring the causes of design changes in building construction projects: An interpretive structural modeling approach.” Sustainability 13 (17): 9578. https://doi.org/10.3390/su13179578.
Suleiman, I. J., and V. G. Luvara. 2016. “Factors influencing change of design of building projects during construction stage in Dar-es-Salaam Tanzania.” Int. J. Constr. Eng. Manage. 5 (4): 93–101.
Sun, M., A. Fleming, S. Senaratne, I. Motawa, and M. L. Yeoh. 2006. “A change management toolkit for construction projects.” Archit. Eng. Des. Manage. 2 (4): 261–271. https://doi.org/10.1080/17452007.2006.9684621.
Trimble. 2022. “Tekla structures.” Accessed August 22, 2022. https://support.tekla.com/tekla-structures.
Valeh Moayeri, O. M., and Z. Zhu. 2017. “Design change management using BIM-based visualization model.” In Proc., ICSC15: The Canadian Society for Civil Engineering 5th Int./11th Construction Specialty Conf., 1274–1282. Vancouver, BC, Canada: Univ. of British Columbia.
Visicon. 2022. “VISICON.” Accessed August 22, 2022. https://visicon.com/.
Wu, C.-H., T.-Y. Hsieh, and W.-L. Cheng. 2005. “Statistical analysis of causes for design change in highway construction on Taiwan.” Int. J. Project Manage. 23 (7): 554–563. https://doi.org/10.1016/j.ijproman.2004.07.010.
Wu, J., H. L. Sadraddin, R. Ren, J. Zhang, and X. Shao. 2021. “Invariant signatures of architecture, engineering, and construction objects to support bim interoperability between architectural design and structural analysis.” J. Constr. Eng. Manage. 147 (1): 04020148. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001943.
Yang, B., M. Dong, C. Wang, B. Liu, Z. Wang, and B. Zhang. 2021. “IFC-based 4D construction management information model of prefabricated buildings and its application in graph database.” Appl. Sci. 11 (16): 7270. https://doi.org/10.3390/app11167270.
Yap, J. B. H., H. Abdul-Rahman, and W. Chen. 2017. “Collaborative model: Managing design changes with reusable project experiences through project learning and effective communication.” Int. J. Project Manage. 35 (7): 1253–1271. https://doi.org/10.1016/j.ijproman.2017.04.010.
Yap, J. B. H., H. Abdul-Rahman, C. Wang, and M. Skitmore. 2018. “Exploring the underlying factors inducing design changes during building production.” Prod. Plann. Control 29 (7): 586–601. https://doi.org/10.1080/09537287.2018.1448127.
Yap, J. B. H., and M. Skitmore. 2018. “Investigating design changes in Malaysian building projects.” Archit. Eng. Des. Manage. 14 (3): 218–238. https://doi.org/10.1080/17452007.2017.1384714.
Yap, J. B. H., M. Skitmore, J. Gray, and K. Shavarebi. 2019. “Systemic view to understanding design change causation and exploitation of communications and knowledge.” Project Manage. J. 50 (3): 288–305. https://doi.org/10.1177/8756972819829641.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 150Issue 5May 2024

History

Received: Jul 17, 2023
Accepted: Nov 22, 2023
Published online: Feb 16, 2024
Published in print: May 1, 2024
Discussion open until: Jul 16, 2024

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Ph.D. Student, Dept. of Civil, Construction, and Environmental Engineering, North Carolina State Univ., Raleigh, NC 27695. ORCID: https://orcid.org/0000-0002-8189-0230. Email: [email protected]
Postdoctoral Research Scholar, Center for Nuclear Energy Facilities and Structures, North Carolina State Univ., Raleigh, NC 27695 (corresponding author). ORCID: https://orcid.org/0000-0001-9820-8894. Email: [email protected]
Jatin Nimawat [email protected]
Graduate Student, Dept. of Civil, Construction, and Environmental Engineering, North Carolina State Univ., Raleigh, NC 27695. Email: [email protected]
Associate Professor, Dept. of Civil, Construction, and Environmental Engineering, North Carolina State Univ., Raleigh, NC 27695. ORCID: https://orcid.org/0000-0002-2995-8381. Email: [email protected]
Abhinav Gupta [email protected]
Professor, Dept. of Civil, Construction, and Environmental Engineering, North Carolina State Univ., Raleigh, NC 27695. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share