Examining the Effect of Material Management Practices on Material Availability and Waste Reduction in Construction Projects

Publication: Journal of Construction Engineering and Management
Volume 149, Issue 8

Abstract

Ensuring material availability and reducing material waste are two crucial aspects of material management to improve construction project performance and sustainability. Past studies have illustrated several material management practices without revealing their effect on material availability and waste reduction. This study fills these research gaps and aims to explore important material management practices by examining their impact on material availability and waste reduction in construction projects. This study identified 23 material management practices from a literature review and collected 107 responses from a questionnaire survey. An underlying structure of the practices was established, and factors were extracted from the exploratory factor analysis. A structural equation model was then developed to explore their influence on material availability and waste reduction. The results revealed six critical factors and associated practices that significantly and positively affect material availability and waste reduction: System for procurement and storage was found to have the highest impact, followed by on-site material control, procurement quality, procurement costing, central procurement database, and material planning systems. By revealing the underlying structure of the practices and establishing their positive influence on material availability and waste reduction, the present study adds value to existing knowledge. Construction practitioners can focus on implementing these crucial practices to ensure material availability and reduce material waste, which will enhance the project’s success and sustainability.

Practical Applications

Construction projects often suffer from nonavailability of materials and waste of materials at construction sites. It is vital to know the important material management practices that can reduce these problems. Hypotheses are developed in this study to explore the effect of material management practices on material availability and waste reduction. This study identified six critical material management factors (systems for procurement and storage, on-site material control, procurement quality, procurement costing, central procurement database, and material planning) that can be managed to improve material management in construction. Implementing these factors and associated practices will enhance material availability and reduce material waste in construction projects which will ultimately support completing the projects within the scheduled time and budgeted cost and promote sustainable construction.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all of the data and models that support the findings of this study are available from the corresponding author upon reasonable request.

References

Adedeji, A., R. Ojelabi, P. Tunji-Olayeni, I. Omuh, and A. Akinola. 2018. “Data architecture of building materials using web-based technologies for sustainable material management.” Int. J. Mech. Eng. Technol. 9 (6): 1155–1165.
Ali, H. A. E. M., I. A. Al-Sulaihi, and K. S. Al-Gahtani. 2013. “Indicators for measuring performance of building construction companies in Kingdom of Saudi Arabia.” J. King Saud Univ. Eng. Sci. 25 (2): 125–134. https://doi.org/10.1016/j.jksues.2012.03.002.
Babakus, E., and W. G. Mangold. 1992. “Adapting the SERVQUAL scale to hospital services: An empirical investigation.” Health Serv. Res. 26 (6): 767–786.
Brammer, S., and H. Walker. 2011. “Sustainable procurement in the public sector: An international comparative study.” Int. J. Oper. Prod. Manage. 31 (4): 452–476. https://doi.org/10.1108/01443571111119551.
Briscoe, G. H., A. R. J. Dainty, S. J. Millett, and R. H. Neale. 2004. “Client-led strategies for construction supply chain improvement.” Construct. Manage. Econ. 22 (2): 193–201. https://doi.org/10.1080/0144619042000201394.
Caldas, C. H., J. Y. Kim, C. T. Haas, P. M. Goodrum, and D. Zhang. 2015a. “Method to assess the level of implementation of productivity practices on industrial projects.” J. Constr. Eng. Manage. 141 (1): 04014061. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000919.
Caldas, C. H., C. L. Menches, P. M. Reyes, L. Navarro, and D. M. Vargas. 2015b. “Materials management practices in the construction industry.” Pract. Period. Struct. Des. Constr. 20 (3): 04014039. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000238.
Chae, B. K. 2009. “Developing key performance indicators for supply chain: An industry perspective.” Supply Chain Manage. 14 (6): 422–428. https://doi.org/10.1108/13598540910995192.
Chen, Q., B. Garcia de Soto, and B. Adey. 2020. “Transshipment approach to coordinate materials for a contractor’s project portfolio.” Int. J. Construct. Manage. 22 (16): 3065–3076. https://doi.org/10.1080/15623599.2020.1840011.
Chen, Y. Q., Y. B. Zhang, J. Y. Liu, and P. Mo. 2012. “Interrelationships among critical success factors of construction projects based on the structural equation model.” J. Manage. Eng. 28 (3): 243–251. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000104.
Doloi, H., K. C. Iyer, and A. Sawhney. 2011. “Structural equation model for assessing impacts of contractor’s performance on project success.” Int. J. Project Manage. 29 (6): 687–695. https://doi.org/10.1016/j.ijproman.2010.05.007.
Doloi, H., A. Sawhney, K. C. Iyer, and S. Rentala. 2012. “Analysing factors affecting delays in Indian construction projects.” Int. J. Project Manage. 30 (4): 479–489. https://doi.org/10.1016/j.ijproman.2011.10.004.
Field, A. 2009. Discovering statistics using SPSS. 3rd ed. London: SAGE.
Formoso, C. T., L. Soibelman, C. De Cesare, and E. L. Isatto. 2002. “Material waste in building industry: Main causes and prevention.” J. Constr. Eng. Manage. 128 (4): 316–325. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:4(316).
Gurmu, A. T. 2019. “Tools for measuring construction materials management practices and predicting labor productivity in multistory building projects.” J. Constr. Eng. Manage. 145 (2): 04018139. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001611.
Gurmu, A. T. 2020. “Construction materials management practices enhancing labour productivity in multi-storey building projects.” Int. J. Constr. Manage. 20 (1): 77–86. https://doi.org/10.1080/15623599.2018.1462447.
Hair, J. F., W. C. Black, B. J. Babin, R. E. Anderson, and R. L. Tatham. 2014. Multivariate data analysis. Upper Saddle River, NJ: Pearson.
Hair, J. F., J. J. Risher, M. Sarstedt, and C. M. Ringle. 2019. “When to use and how to report the results of PLS-SEM.” Eur. Bus. Rev. 31 (1): 2–24.
Iacobucci, D. 2010. “Structural equations modeling: Fit indices, sample size, and advanced topics.” J. Consum. Psychol. 20 (1): 90–98. https://doi.org/10.1016/j.jcps.2009.09.003.
Iyer, K. C., and K. N. Jha. 2005. “Factors affecting cost performance: Evidence from Indian construction projects.” Int. J. Project Manage. 23 (4): 283–295. https://doi.org/10.1016/j.ijproman.2004.10.003.
Jannoo, Z., B. W. Yap, N. Auchoybur, and M. A. Lazim. 2014. “The effect of nonnormality on CB-SEM and PLS-SEM path estimates.” Int. J. Math. Comput. Sci. 8 (2): 285–291. https://doi.org/10.5281/zenodo.1090631.
Jha, K. N. 2015. Construction project management: Theory and practices. 2nd ed., 427–453. Chennai, Tamil Nadu, India: Pearson.
Jusoh, Z. M., and N. Kasim. 2017. “A review on implication of material management to project performance.” MATEC Web Conf. 87 (2): 01012. https://doi.org/10.1051/matecconf/20178701012.
Kamari, M., and Y. Ham. 2021. “Vision-based volumetric measurements via deep learning-based point cloud segmentation for material management in jobsites.” Autom. Constr. 121 (Jan): 103430. https://doi.org/10.1016/j.autcon.2020.103430.
Kar, S., and K. N. Jha. 2020a. “Examining the effect of material management issues on the schedule and cost performance of construction projects based on a structural equation model: Survey of Indian experiences.” J. Constr. Eng. Manage. 146 (9): 05020011. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001906.
Kar, S., and K. N. Jha. 2020b. “Exploring the current material management practices and their influences on material availability in construction projects of developing countries.” In Proc., Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts, 963–972. Reston, VA: ASCE.
Kar, S., and K. N. Jha. 2021. “Investigation into lead time of construction materials and influencing factors.” J. Constr. Eng. Manage. 147 (3): 04020177. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001998.
Kasim, N. B., C. J. Anumba, and A. R. J. Dainty. 2005. “Improving materials management practices on fast-track construction projects.” In Vol. 2 of Proc., 21st Annual ARCOM Conf., 793–802. London: Association of Researchers in Construction Management.
Kasim, N. B., R. B. Kusumaningtias, and N. B. Sarpin. 2019. “Enhancing material tracking practices of material management in construction project.” Int. J. Sustainable Constr. Eng. Technol. 10 (2): 61–73. https://doi.org/10.30880/ijscet.2019.10.02.006.
Kish, L. 1995. Survey sampling. New York: Wiley.
Kulkarni, V., R. Sharma, and M. Hote. 2017. “Factors affecting material management on construction site.” Int. Res. J. Eng. Technol. 4 (1): 474–478.
Moon, S., S. Xu, L. Hou, C. Wu, X. Wang, and V. W. Tam. 2018. “RFID-aided tracking system to improve work efficiency of scaffold supplier: Stock management in Australasian supply chain.” J. Constr. Eng. Manage. 144 (2): 04017115. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001432.
Mustapa, F. D., M. Mustapa, M. S. Misnan, and S. H. Mahmud. 2012. “ICT adoption in materials management among construction firms in construction industry.” In Proc., 2012 IEEE Colloquium on Humanities, Science and Engineering, 342–346. New York: IEEE.
Naji, K. K., M. Gunduz, and M. F. Hamaidi. 2022. “Major factors affecting construction waste management in infrastructure projects using structural equation model.” J. Constr. Eng. Manage. 148 (10): 04022101. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002358.
Nasir, H. 2013. “Best productivity practices implementation index (BPPII) for infrastructure projects.” Ph.D. thesis, Dept. of Civil and Environmental Engineering, Univ. of Waterloo.
Navon, R., and O. Berkovich. 2006. “An automated model for materials management and control.” Construct. Manage. Econ. 24 (6): 635–646. https://doi.org/10.1080/01446190500435671.
Niu, Y., W. Lu, D. Liu, K. Chen, C. Anumba, and G. G. Huang. 2017. “An SCO-enabled logistics and supply chain-management system in construction.” J. Constr. Eng. Manage. 143 (3): 04016103. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001232.
Polat, G., and D. Arditi. 2005. “The JIT materials management system in developing countries.” Construct. Manage. Econ. 23 (7): 697–712. https://doi.org/10.1080/01446190500041388.
Rigdon, E. E., M. Sarstedt, and C. M. Ringle. 2017. “On comparing results from CB-SEM and PLS-SEM: Five perspectives and five recommendations.” Marketing 39 (3): 4–16.
Saad, M., M. Jones, and P. James. 2002. “A review of the progress towards the adoption of supply chain management (SCM) relationships in construction.” Eur. J. Purchasing Supply Manage. 8 (3): 173–183. https://doi.org/10.1016/S0969-7012(02)00007-2.
Saka, A. B., F. O. Olaore, and T. O. Olawumi. 2019. “Post-contract material management and waste minimization: An analysis of the roles of quantity surveyors.” J. Eng. Des. Technol. 17 (4): 793–807. https://doi.org/10.1108/JEDT-10-2018-0193.
Tabish, S. Z. S., and K. N. Jha. 2012. “Success traits for a construction project.” J. Constr. Eng. Manage. 138 (10): 1131–1138. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000538.
Tenenhaus, M. 2008. “Component-based structural equation modeling.” Total Qual. Manage. 19 (7–8): 871–886. https://doi.org/10.1080/14783360802159543.
Tripathi, K. K., and K. N. Jha. 2018. “Determining success factors for a construction organization: A structural equation modeling approach.” J. Manage. Eng. 34 (1): 04017050. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000569.
Tripathi, K. K., and K. N. Jha. 2019. “An empirical study on factors leading to the success of construction organizations in India.” Int. J. Construct. Manage. 19 (3): 222–239. https://doi.org/10.1080/15623599.2017.1423162.
Viswanathan, S. K., K. K. Tripathi, and K. N. Jha. 2020. “Influence of risk mitigation measures on international construction project success criteria—A survey of Indian experiences.” Construct. Manage. Econ. 38 (3): 207–222. https://doi.org/10.1080/01446193.2019.1577987.
Wang, M., M. S. Altaf, M. Al-Hussein, and Y. Ma. 2020. “Framework for an IoT-based shop floor material management system for panelized homebuilding.” Int. J. Construct. Manage. 20 (2): 130–145. https://doi.org/10.1080/15623599.2018.1484554.
Wong, P. S. P., and S. O. Cheung. 2005. “Structural equation model of trust and partnering success.” J. Manage. Eng. 21 (2): 70–80. https://doi.org/10.1061/(ASCE)0742-597X(2005)21:2(70).
Xiong, B., M. Skitmore, and B. Xia. 2015a. “A critical review of structural equation modeling applications in construction research.” Autom. Constr. 49 (Jan): 59–70. https://doi.org/10.1016/j.autcon.2014.09.006.
Xiong, Y., H. Li, M. L. Kornhaber, H. K. Suen, B. Pursel, and D. D. Goins. 2015b. “Examining the relations among student motivation, engagement, and retention in a MOOC: A structural equation modeling approach.” Global Educ. Rev. 2 (3): 23–33.
Yong, A. G., and S. Pearce. 2013. “A beginner’s guide to factor analysis: Focusing on exploratory factor analysis.” Tutorials Quant. Methods Psychol. 9 (2): 79–94. https://doi.org/10.20982/tqmp.09.2.p079.
Zahoor, H., A. P. Chan, W. P. Utama, R. Gao, and S. A. Memon. 2017. “Determinants of safety climate for building projects: SEM-based cross-validation study.” J. Constr. Eng. Manage. 143 (6): 05017005. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001298.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 149Issue 8August 2023

History

Received: Jan 28, 2023
Accepted: Apr 3, 2023
Published online: May 31, 2023
Published in print: Aug 1, 2023
Discussion open until: Oct 31, 2023

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Assistant Professor, Dept. of Civil Engineering, Indian Institute of Technology Guwahati, Guwahati, Assam 781039, India (corresponding author). ORCID: https://orcid.org/0000-0002-9618-227X. Email: [email protected]
Kumar Neeraj Jha, Ph.D. [email protected]
Professor, Dept. of Civil Engineering, Indian Institute of Technology Delhi, Delhi 110016, India. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share