Abstract

Multiple tower crane layout planning (MTCLP) refers to the selection of the types, quantities, and positions of tower cranes and material storage positions. In a construction project, choosing tower cranes with a larger covering radius and lifting capacity can reduce the transportation time of materials. However, it can also simultaneously raise the rental cost and the risk of crane crashes. Determining an optimal multiple tower crane layout plan to achieve high construction efficiency with low cost is still a challenge. Mathematically, MTCLP is a complex combinatorial problem controlled by a number of variables, such as site configuration, building layout, material storage positions, and workload. To precisely describe irregular shaped sites and buildings, this research partitioned the site into unit cells and proposed a cell-based optimization model. For the optimal crane layout plan, the problem was formulated as a mixed integer linear problem (MILP). The model’s mathematical constraints comprised coverage of the given positions, the crane’s safety distance, sufficient crane capacity, and the utilization ratio. The objectives were to increase the crane coverage ratio while reducing the cost and the working areas overlapped by more than two cranes. Two case studies are presented to demonstrate the effectiveness of the model. The first construction project consisted of seven buildings with irregular shapes. By strictly forbidding the areas to be overlapped by more than three tower cranes, the model successfully obtained the optimal crane layout plan using the Gurobi Optimizer. Compared with the contractor’s layout plan, the optimal plan reduced the rental cost by 10.7% and the area overlapped by more than three tower cranes by 4.56%. In the second project, alternative plans were identified by the Gurobi Optimizer and ε-constraint method to enhance confidence in selecting the ultimate crane layout plan. The optimization procedure involved (1) optimizing the layout plan with minimum crane cost and maximum coverage ratio, (2) identifying all possible layouts as the Pareto fronts when the coverage ratio could not be raised without increasing the crane cost, and (3) minimizing the areas of crane overlap covered by more than three tower cranes. The effectiveness of the proposed model is also proved by comparing the differences in layout plans caused by “regular” and “urgent” lifting demands.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all of the data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.

Acknowledgments

This work was supported by the Science & Technology Fund of Beijing Education Committee (No. KM202110005019), China Construction First Group Construction & Development Co., Ltd. (No. PT-2022-11-01), and CREC Research & Development Support Program (No. 2021-022).

References

Al Hattab, M., E. Zankoul, M. Barakat, and F. Hamzeh. 2017. “Crane overlap and operational flexibility: Balancing utilization, duration, and safety.” Constr. Innovations 18 (1): 43–63. https://doi.org/10.1108/CI-11-2016-0062.
Amiri, R., J. Majrouhi Sardroud, and V. Momenaei Kermani. 2022. “Decision support system for tower crane location and material supply point in construction sites using an integer linear programming model.” Eng. Constr. Archit. Manage. 30 (4): 1444–1462. https://doi.org/10.1108/ECAM-06-2021-0517.
Briskorn, D., and M. Dienstknecht. 2019. “Mixed-integer programming models for tower crane selection and positioning with respect to mutual interference.” Eur. J. Oper. Res. 273 (1): 160–174. https://doi.org/10.1016/j.ejor.2018.07.033.
Briskorn, D., and M. Dienstknecht. 2020. “Covering polygons with discs: The problem of crane selection and location on construction sites.” Omega 97 (Dec): 102114. https://doi.org/10.1016/j.omega.2019.102114.
Gurobi Optimization. 2012. “Gurobi optimizer reference manual, version 5.0.” Accessed April 3, 2021. https://www.gurobi.com/wp-content/plugins/hd_documentations/documentation/9.0/refman.pdf.
Hegazy, T., and E. Elbeltagi. 1999. “EvoSite: Evolution-based model for site layout planning.” J. Comput. Civ. Eng. 13 (3): 198–206. https://doi.org/10.1061/(ASCE)0887-3801(1999)13:3(198).
Huang, C., and C. K. Wong. 2017. “Discretized cell modeling for optimal facility layout plans of unequal and irregular facilities.” J. Constr. Eng. Manage. 143 (1): 04016082. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001206.
Huang, C., C. K. Wong, and C. M. Tam. 2011. “Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming.” Autom. Constr. 20 (5): 571–580. https://doi.org/10.1016/j.autcon.2010.11.023.
Hung, W. H., C. W. Liu, C. J. Liang, and S. C. Kang. 2016. “Strategies to accelerate the computation of erection paths for construction cranes.” Autom. Constr. 62 (Feb): 1–13. https://doi.org/10.1016/j.autcon.2015.10.008.
Hussein, M., and T. Zayed. 2021. “Crane operations and planning in modular integrated construction: Mixed review of literature.” Autom. Constr. 122 (Feb): 103446. https://doi.org/10.1016/j.autcon.2020.103466.
Javier, I., and E. P. Karan. 2012. “Optimizing location of tower cranes on construction sites through GIS and BIM integration.” J. Inf. Technol. Constr. 17 (23): 351–366.
Ji, Y., and F. Leite. 2018. “Automated tower crane planning: Leveraging 4-dimensional BIM and rule-based checking.” Autom. Constr. 93 (Sep): 78–90. https://doi.org/10.1016/j.autcon.2018.05.003.
Lien, L. C., and M. Y. Cheng. 2014. “Particle bee algorithm for tower crane layout with material quantity supply and demand optimization.” Autom. Constr. 45 (Sep): 25–32. https://doi.org/10.1016/j.autcon.2014.05.002.
Marzouk, M., and A. Abubakr. 2016. “Decision support for tower crane selection with building information models and genetic algorithms.” Autom. Constr. 61 (Jan): 1–15. https://doi.org/10.1016/j.autcon.2015.09.008.
Nadoushani, Z. S. M., A. W. A. Hammad, and A. Akbarnezhad. 2017. “Location optimization of tower crane and allocation of material supply points in a construction site considering operating and rental costs.” J. Constr. Eng. Manage. 143 (1): 04016089. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001215.
Peng, B., F. L. Flager, and J. Wu. 2018. “A method to optimize mobile crane and crew interactions to minimize construction cost and time.” Autom. Constr. 95 (Nov): 10–19. https://doi.org/10.1016/j.autcon.2018.07.015.
Riga, K., K. Jahr, C. Thielen, and A. Borrmann. 2020. “Mixed integer programming for dynamic tower crane and storage area optimization on construction sites.” Autom. Constr. 120 (Dec): 103259. https://doi.org/10.1016/j.autcon.2020.103259.
Shapira, A., and M. Simcha. 2009. “Measurement and risk scales of crane-related safety factors on construction sites.” J. Constr. Eng. Manage. 135 (10): 979–989. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000066.
Sohn, H. W., W. K. Hong, D. Lee, C. Y. Lim, X. Wang, and S. Kim. 2014. “Optimum tower crane selection and supporting design management.” Int. J. Adv. Rob. Syst. 11 (8): 133. https://doi.org/10.5772/58438.
Tam, C. M., T. K. L. Tong, and W. K. W. Chan. 2001. “Genetic algorithm for optimizing supply locations around tower crane.” J. Constr. Eng. Manage. 127 (4): 315–321. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:4(315).
Tariq, S., M. Hussein, R. D. Wang, and T. Zayed. 2021. “Trends and developments of on-site crane layout planning 1983-2020: Bibliometric, scientometric and qualitative analyzes.” Constr. Innovation 22 (4): 1011–1035. https://doi.org/10.1108/CI-02-2021-0015.
Wang, J., X. Zhang, W. Shou, X. Wang, B. Xu, M. J. Kim, and P. Wu. 2015. “A BIM-based approach for automated tower crane layout planning.” Autom. Constr. 59 (Nov): 168–178. https://doi.org/10.1016/j.autcon.2015.05.006.
Wu, K., B. G. de Soto, and F. Zhang. 2020. “Spatio-temporal planning for tower cranes in construction projects with simulated annealing.” Autom. Constr. 111 (Mar): 103060. https://doi.org/10.1016/j.autcon.2019.103060.
Yeoh, J. K. W., and D. K. H. Chua. 2017. “Optimizing crane selection and location for multistage construction using a four-dimensional set cover approach.” J. Constr. Eng. Manage. 143 (8): 04017029. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001318.
Younes, A., and M. Marzouk. 2018. “Tower cranes layout planning using agent-based simulation considering activity conflicts.” Autom. Constr. 93 (Sep): 348–360. https://doi.org/10.1016/j.autcon.2018.05.030.
Zhang, P., F. C. Harris, and P. O. Olomolaiye. 1996. “A computer-based model for optimizing the location of a single tower crane.” Build. Res. Inf. 24 (2): 113–123. https://doi.org/10.1080/09613219608727511.
Zhang, P., F. C. Harris, P. O. Olomolaiye, and G. D. Holt. 1999. “Location optimization for a group of tower cranes.” J. Constr. Eng. Manage. 125 (2): 115–122. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:2(115).
Zhang, Z., and W. Pan. 2020. “Lift planning and optimization in construction: A thirty-year review.” Autom. Constr. 118 (Oct): 103271. https://doi.org/10.1016/j.autcon.2020.103271.
Zhang, Z., and W. Pan. 2021a. “Multi-criteria decision analysis for tower crane layout planning in high-rise modular integrated construction.” Autom. Constr. 127 (Jul): 103709. https://doi.org/10.1016/j.autcon.2021.103709.
Zhang, Z., and W. Pan. 2021b. “Virtual reality supported interactive tower crane layout planning for high-rise modular integrated construction.” Autom. Constr. 130 (Oct): 103854. https://doi.org/10.1016/j.autcon.2021.103854.
Zhang, Z., W. Pan, and M. Pan. 2021. “Critical considerations on tower crane layout planning for high-rise modular integrated construction.” Eng. Constr. Archit. Manage. 29 (7): 2615–2634. https://doi.org/10.1108/ECAM-03-2021-0192.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 149Issue 8August 2023

History

Received: Sep 18, 2022
Accepted: Feb 28, 2023
Published online: Jun 6, 2023
Published in print: Aug 1, 2023
Discussion open until: Nov 6, 2023

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Associate Professor, College of Architecture and Civil Engineering, Beijing Univ. of Technology, Chaoyang, Beijing 100124, China. Email: [email protected]
Zi Kang Wang [email protected]
Master’s Candidate, College of Architecture and Civil Engineering, Beijing Univ. of Technology, Chaoyang, Beijing 100124, China. Email: [email protected]
Senior Engineer, China Construction First Group Construction & Development Co., Ltd., Chaoyang, Beijing 100102, China. Email: [email protected]
Associate Director, China Railway Group Limited Cloud Net Information Technology, Haidian, Beijing 100039, China. Email: [email protected]
Director, China Construction Third Engineering Bureau Group Co., Ltd., Daxing, Beijing 102629, China. Email: [email protected]
Associate Director, China Construction Third Engineering Bureau Group Co., Ltd., Daxing, Beijing 102629, China. Email: [email protected]
Senior Engineer, China Construction Third Engineering Bureau Group Co., Ltd., Daxing, Beijing 102629, China. Email: [email protected]
Cai Xia Guo [email protected]
Lecturer, College of Architecture and Civil Engineering, Beijing Univ. of Technology, Chaoyang, Beijing 100124, China (corresponding author). Email: [email protected]
Xue Feng Zhao [email protected]
Associate Professor, College of Architecture and Civil Engineering, Beijing Univ. of Technology, Chaoyang, Beijing 100124, China. Email: [email protected]
Master’s Candidate, College of Architecture and Civil Engineering, Beijing Univ. of Technology, Chaoyang, Beijing 100124, China. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share