Technical Papers
Dec 30, 2022

Qualitative Analysis of the Impact of Contracts on Information Management in AEC Projects

Publication: Journal of Construction Engineering and Management
Volume 149, Issue 3

Abstract

Project information management in architecture, engineering, and construction (AEC) projects can be a challenging endeavor due to the complex nature of projects and the numerous sources and types of information required, including drawings, plans, specifications, and building information modeling (BIM), among others. AEC projects require stakeholders to develop temporary teams, develop work processes, and collaborate across organizational boundaries. Additionally, the numerous technologies used in information management, such as project management software, scheduling software, and BIM, require contractual agreements among project stakeholders to address these technologies’ potential risks while still allowing stakeholder collaboration to benefit project execution and delivery. Contracts are used to define project requirements and can be used to define different aspects of project information management, like required deliverables or stakeholder roles and responsibilities. While recent research has evaluated the relationship between BIM and contracts, there is a gap in understanding the relationship between contracts and information management more holistically. The objectives of this research were to gain insight into how contracts impact information management, identify barriers that exist in contracts related to information management, and to develop potential contract-related strategies to improve information management on AEC projects. Researchers implemented a qualitative analysis approach through semistructured interviews with 38 AEC professionals and the application of a systematic and iterative qualitative coding process. This research found that contracts can be used as a tool to influence the development and execution of project information management strategies. Specifically, contracts can be used to define deliverables, workflows, and software, as well as templates and forms. While interviewees discussed many contract-related challenges, they also proposed potential contract-related strategies to improve project information management. These strategies encompass three main categories: improving contract compliance, contract flexibility, and setting expectations. These findings provide insight into how contracts can impact project information management and provide practitioners with specific contract strategies to improve project information management.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or code generated or used during the study are proprietary or confidential in nature and may only be provided with restrictions.

Acknowledgments

This research was supported by the Construction Industry Institute (CII). Their support is gratefully acknowledged. Any opinions, findings and conclusions, or recommendations expressed in this material are those of the authors and do not necessarily reflect the views of CII. The authors would like to thank Abdullah AlSuhaibani, Bing Han, Guilherme Eliote, and Daniel J. Weeks for their feedback and support throughout the research process.

References

AIA (American Institute of Architects). 1992a. “G702-1992 application and certificate for payment.” Accessed February 17, 2021. https://www.aiacontracts.org/contract-documents/19661-application-and-certificate-for-payment.
AIA (American Institute of Architects). 1992b. “G703-1992 continuation sheet.” Accessed February 17, 2021. https://www.aiacontracts.org/contract-documents/20631-continuation-sheet-.
AIA (American Institute of Architects). 2013a. “C106-2013 digital data licensing agreement.” Accessed July 6, 2022. https://www.aiacontracts.org/contract-documents/18516-digital-data-licensing.
AIA (American Institute of Architects). 2013b. “G201-2013 project digital data protocol.” Accessed July 6, 2022. https://www.aiacontracts.org/contract-documents/19021-project-digital-data-protocol.
AIA (American Institute of Architects). 2013c. “G202-2013 project BIM protocol.” Accessed July 6, 2022. https://www.aiacontracts.org/contract-documents/19016-project-bim-protocol.
Akinyemi, A., M. Sun, and A. J. G. Gray. 2018. “An ontology-based data integration framework for construction information management.” Proc. Inst. Civ. Eng. Manage. Procure. Law 171 (3): 111–125. https://doi.org/10.1680/jmapl.17.00052.
AlMaian, R. Y., K. L. Needy, K. D. Walsh, and T. C. L. da Alves. 2016. “A qualitative data analysis for supplier quality-management practices for engineer-procure-construct projects.” J. Constr. Eng. Manage. 142 (2): 04015061. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001046.
Anumba, C. J., R. R. A. Issa, J. Pan, and I. Mutis. 2008. “Ontology-based information and knowledge management in construction.” Constr. Innov. 8 (3): 218–239. https://doi.org/10.1108/14714170810888976.
Arshad, M. F., M. J. Thaheem, A. R. Nasir, and M. S. A. Malik. 2019. “Contractual risks of building information modeling: Toward a standardized legal framework for design-bid-build projects.” J. Constr. Eng. Manage. 145 (4): 04019010. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001617.
Asare, K. A. B., R. R. A. Issa, R. Liu, and C. Anumba. 2021. “BIM for facilities management: Potential legal issues and opportunities.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 13 (4): 04521034. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000502.
Ashcraft, H. W. 2008. “Building information modeling: A framework for collaboration.” Constr. Law 28 (3).
Assaad, R., I. H. El-adaway, A. H. El Hakea, M. J. Parker, T. I. Henderson, C. R. Salvo, and M. O. Ahmed. 2020. “Contractual perspective for BIM utilization in US construction projects.” J. Constr. Eng. Manage. 146 (12): 04020128. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001927.
Babbie, E. 2017. The basics of social research. 7th ed. Boston: Cengage Learning.
Back, W. E., and K. A. Moreau. 2000. “Cost and schedule impacts of information management on EPC process.” J. Manage. Eng. 16 (2): 59–70. https://doi.org/10.1061/(ASCE)0742-597X(2000)16:2(59).
Back, W. E., and K. A. Moreau. 2001. “Information management strategies for project management.” Project Manage. J. 32 (1): 10–19. https://doi.org/10.1177/875697280103200103.
Bansal, V. K. 2021. “Integrated framework of BIM and GIS applications to support building lifecycle: A move toward nD modeling.” J. Archit. Eng. 27 (4): 05021009. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000490.
Barry, W., F. Leite, and W. J. O’Brien. 2015. “Late deliverable risk catalog: Evaluating the impacts and risks of late deliverables to construction sites.” J. Constr. Eng. Manage. 141 (4): 04014087. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000950.
BCG (Boston Consulting Group). 2016. “The transformative power of building information modeling: Digital in engineering and construction.” Accessed July 27, 2021. https://www.bcg.com/en-ch/publications/2016/engineered-products-infrastructure-digital-transformative-power-building-information-modeling.
Birks, M., Y. Chapman, and K. Francis. 2008. “Memoing in qualitative research: Probing data and processes.” J. Res. Nurs. 13 (1): 68–75. https://doi.org/10.1177/1744987107081254.
Bubshait, A. A., M. K. Siddiqui, and A. M. A. Al-Buali. 2015. “Role of communication and coordination in project success: Case study.” J. Perform. Constr. Facil. 29 (4): 04014107. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000610.
Bwalya, K. J., and Z. F. C. Saul. 2014. “Unleashing the conceptual value of information management for organizational competitiveness: Semantic underpinnings.” In Concepts and advances in information knowledge management, edited by K. J. Bwalya, N. M. Mnjama, and P. M. I. M. Sebina, 111–127. Kidlington, UK: Chandos Publishing.
Campbell, D. T. S. 2019. “Construction information management systems: Conceptual model to improve residential construction project resilience and productivity in New Zealand and Saint Vincent and the Grenadines.” In Proc., Int. Conf. on Sustainable Infrastructure 2019, 205–215. Reston, VA: ASCE https://doi.org/10.1061/9780784482650.021.
Celoza, A., D. P. de Oliveira, and F. Leite. 2021a. “Identification and ranking of legal factors impacting information management in the AEC industry using the Delphi method.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 13 (4): 04521022. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000494.
Celoza, A., F. Leite, and D. P. de Oliveira. 2021b. “Impact of BIM-related contract factors on project performance.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 13 (3): 04521011. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000478.
Cha, H. S., and D. G. Lee. 2018. “Framework based on building information modelling for information management by linking construction documents to design objects.” J. Asian Archit. Build. Eng. 17 (2): 329–336. https://doi.org/10.3130/jaabe.17.329.
Chen, K., and W. Lu. 2019. “Bridging BIM and building (BBB) for information management in construction: The underlying mechanism and implementation.” Eng. Constr. Archit. Manage. 26 (7): 1518–1532. https://doi.org/10.1108/ECAM-05-2018-0206.
Cheung, S. O., and K. H. Y. Pang. 2013. “Anatomy of construction disputes.” J. Constr. Eng. Manage. 139 (1): 15–23. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000532.
Choo, C. W. 2002. Information management for the intelligent organization: The art of scanning the environment. Medford, NJ: Information Today.
CII (Construction Industry Institute). 2003. Project objective setting. RS12-1. Austin, TX: CII.
CII (Construction Industry Institute). 2017. Best practices handbook. SP166-4 CII. Austin, TX: CII.
ConsensusDocs. 2017. “ConsensusDocs 202 change order.” Accessed February 5, 2021. https://www.consensusdocs.org/contract/202-2/.
Corbin, J., and A. Strauss. 2012. Basics of qualitative research: Techniques and procedures for developing grounded theory. 3rd ed. Thousand Oaks, CA: SAGE.
Creswell, J. W., and C. N. Poth. 2018. Qualitative inquiry and research design: Choosing among five traditions. 4th ed. Thousand Oaks, CA: SAGE.
Demian, P., and P. Balatsoukas. 2012. “Information retrieval from civil engineering repositories: Importance of context and granularity.” J. Comput. Civ. Eng. 26 (6): 727–740. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000229.
Flick, U. 2004. “Triangulation in qualitative research.” In A companion to qualitative research, 248–255. Thousand Oaks, CA: SAGE.
Franz, B., R. Leicht, K. Molenaar, and J. Messner. 2017. “Impact of team integration and group cohesion on project delivery performance.” J. Constr. Eng. Manage. 143 (1): 1–12. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001219.
Franz, B., and J. Messner. 2019. “Evaluating the impact of building information modeling on project performance.” J. Comput. Civ. Eng. 33 (3): 04019015. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000832.
Franz, B., and B. A. M. Roberts. 2022. “Thematic analysis of successful and unsuccessful project delivery teams in the building construction industry.” J. Constr. Eng. Manage. 148 (3): 05022001. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002242.
Froese, T. M. 2005. “Information management for construction.” In Proc., 4th Int. Workshop on Construction Information Technology. Dresden, Germany: Institute for Construction Informatics.
Froese, T. M. 2010. “The impact of emerging information technology on project management for construction.” Autom. Constr. 19 (5): 531–538. https://doi.org/10.1016/j.autcon.2009.11.004.
Gallaher, M. P., A. C. O’Connor, J. L. Dettbarn, and L. T. Gilday. 2004. Cost analysis of inadequate interoperability in the US capital facilities industry. Gaithersburg, MD: US Department of Commerce.
Ghosh, A., and A. D. Chasey. 2014. “Motivation for the development of an information management framework for healthcare facility management.” In Proc., Construction Research Congress 2014. Reston, VA: ASCE.
Greenwald, N. W. 2020. “BIM, blockchain, and smart contracts.” Constr. Lawyer 40 (4): 9–16.
Guerra, B. C., and F. Leite. 2020. “Bridging the gap between engineering and construction 3D models in support of advanced work packaging.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (3): 04520029. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000419.
Guerra, B. C., and F. Leite. 2021. “Circular economy in the construction industry: An overview of United States stakeholders’ awareness, major challenges, and enablers.” Resour. Conserv. Recycl. 170 (Apr): 105617. https://doi.org/10.1016/j.resconrec.2021.105617.
Gurgun, A. P., and K. Koc. 2021. “The role of contract incompleteness factors in project disputes: A hybrid fuzzy multi-criteria decision approach.” Eng. Constr. Archit. Manage. https://doi.org/10.1108/ECAM-11-2021-1020.
Hamdi, O., and F. Leite. 2014. “Conflicting side of building information modeling implementation in the construction industry.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 6 (3): 03013004. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000137.
Hamledari, H., and M. Fischer. 2021. “Role of blockchain-enabled smart contracts in automating construction progress payments.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 13 (1): 04520038. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000442.
Haponava, T., and S. Al-Jibouri. 2010. “Influence of process performance during the construction stage on achieving end-project goals.” Construct. Manage. Econ. 28 (8): 853–869. https://doi.org/10.1080/01446193.2010.487535.
Hendrickson, C. 2008. Project management for construction: Fundamental concepts for owners, engineers, architects and builders. Pittsburgh: Prentice Hall.
Hicks, B., S. J. Culley, and C. A. McMahon. 2006. “A study of issues relating to information management across engineering SMEs.” Int. J. Inf. Manage. 26 (4): 267–289. https://doi.org/10.1016/j.ijinfomgt.2006.03.006.
Hsieh, H. F., and S. E. Shannon. 2005. “Three approaches to qualitative content analysis.” Qual. Health Res. 15 (9): 1277–1288. https://doi.org/10.1177/1049732305276687.
Hua, Y., and Y. Wang. 2018. “Construction of information management model of engineering project based on BIM technology.” In Proc., Int. Conf. on Construction and Real Estate Management 2018, 52–59. Reston, VA: ASCE. https://doi.org/10.1061/9780784481721.006.
ISO. 2018a. Industrial automation systems and integration. Integration of life-cycle data for process plants including oil and gas production facilities—Part 13: Integrated asset planning life-cycle. ISO 15926-13:2018. Geneva: ISO.
ISO. 2018b. Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM). Information management using building information modelling. Part 1: Concepts and principles. ISO 19650-1. Geneva: ISO.
ISO. 2018c. Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM). Information management using building information modelling—Part 2: Delivery phase of the assets. ISO 19650-2. Geneva: ISO.
Jahanger, Q. K., J. Louis, D. Trejo, and C. Pestana. 2021. “Potential influencing factors related to digitalization of construction-phase information management by project owners.” J. Manage. Eng. 37 (3): 04021010. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000903.
Joffe, H., and L. Yardley. 2004. “Chapter 4: Content and thematic analysis.” In Research methods for clinical and health psychology. Los Angeles: SAGE.
Jonsen, K., and K. A. Jehn. 2009. “Using triangulation to validate themes in qualitative studies.” Qual. Res. Organ. Manage. Int. J. 4 (2): 123–150. https://doi.org/10.1108/17465640910978391.
Khan, K. I. A., R. Flanagan, and S. L. Lu. 2016. “Managing information complexity using system dynamics on construction projects.” Construct. Manage. Econ. 34 (3): 192–204. https://doi.org/10.1080/01446193.2016.1190026.
Koc, K., and A. P. Gurgun. 2021. “Assessment of readability risks in contracts causing conflicts in construction projects.” J. Constr. Eng. Manage. 147 (6): 04021041. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002050.
Kuzel, A. J. 1999. “Chapter 2: Sampling in qualitative inquiry.” In Qualitative research, edited by B. W. Crabtree Miller, 33–44. Newbury Park, CA: SAGE.
Lee, D. G., J. Y. Park, and S. H. Song. 2018. “BIM-based construction information management framework for site information management.” Adv. Civ. Eng. 2018 (Feb): 1–14. https://doi.org/10.1155/2018/5249548.
Leite, F. L. 2020. BIM for design coordination. Hoboken, NJ: Wiley.
Li, Q., H. Zhang, and L. Zhang. 2018. “Application of building information modeling (BIM) technology in information management of steel structure materials.” In Proc., Int. Conf. on Construction and Real Estate Management 2018, 278–284. Reston, VA: ASCE. https://doi.org/10.1061/9780784481721.033.
Li, Z., and D. He. 2013. “Discuss a method of collaborative construction project information management based on BIM.” In Proc., Int. Conf. on Construction and Real Estate Management 2013, 492–498. Reston, VA: ASCE. https://doi.org/10.1061/9780784413135.047.
Lucas, J., T. Bulbul, and W. Thabet. 2013. “An object-oriented model to support healthcare facility information management.” Autom. Constr. 31 (Jun): 281–291. https://doi.org/10.1016/j.autcon.2012.12.014.
McArthur, J. J. 2015. “A building information management (BIM) framework and supporting case study for existing building operations, maintenance and sustainability.” Procedia Eng. 118 (Aug): 1104–1111. https://doi.org/10.1016/j.proeng.2015.08.450.
Messner, J., C. Anumba, C. Dubler, C. Goodman, C. Kasprzak, R. Kreider, R. Leicht, C. Saluja, and N. Zikic. 2019. BIM project execution planning guide, version 2.2. University Park, PA: Penn State Univ.
Mitropoulos, P., and G. Howell. 2001. “Model for understanding, preventing, and resolving project disputes.” J. Constr. Eng. Manage. 127 (3): 223–231. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:3(223).
Moreau, K. A., and W. E. Back. 2000. “Improving the design process with information management.” Autom. Constr. 10 (1): 127–140. https://doi.org/10.1016/S0926-5805(99)00057-6.
Mortensen, C. B., J. Zachodnik, S. F. Caspersen, and A. Geisler. 2022. “Healthcare professionals’ experiences during the initial stage of the COVID-19 pandemic in the intensive care unit: A qualitative study.” Intensive Crit. Care Nurs. 68 (2022): 103130. https://doi.org/10.1016/j.iccn.2021.103130.
Morteza, A., M. Ilbeigi, and J. Schwed. 2021. “A blockchain information management framework for construction safety.” In Proc., Int. Conf. on Computing in Civil Engineering 2021, 342–349. Reston, VA: ASCE. https://doi.org/10.1061/9780784483893.043.
NBIMS (National Building Information Model Standard) Project Committee. 2007. United States national building information modeling standard—Version 1—Part 1: Overview, principles, and methodologies. Washington, DC: National Institute of Building Sciences.
North American Mechanical, Inc. v. Walsh Construction Company. 2015. “II, LLC, 132 F. Supp. 3d 1064.” Accessed September 18, 2015. https://cite.case.law/f-supp-3d/132/1064/.
Nunhes, T. V., M. Bernardo, and O. J. Oliveira. 2020. “Rethinking the way of doing business: A reframe of management structures for developing corporate sustainability.” Sustainability 12 (3): 1177. https://doi.org/10.3390/su12031177.
Olawumi, T. O., and D. W. M. Chan. 2019. “Building information modelling and project information management framework for construction projects.” J. Civ. Eng. Manage. 25 (1): 53–75. https://doi.org/10.3846/jcem.2019.7841.
Ozturk, G. B. 2020. “Interoperability in building information modeling for AECO/FM industry.” Autom. Constr. 113 (May): 103122. https://doi.org/10.1016/j.autcon.2020.103122.
Pan, X., B. Zhong, D. Sheng, X. Yuan, and Y. Wang. 2022. “Blockchain and deep learning technologies for construction equipment security information management.” Autom. Constr. 136 (Apr): 104186. https://doi.org/10.1016/j.autcon.2022.104186.
Parsanezhad, P. 2015. “A lifecycle approach towards building information management: Technical and procedural implications for the facility management and operations sector.” Master’s thesis, Dept. of Real Estate and Construction Management, Royal Institute of Technology. https://www.diva-portal.org/smash/get/diva2:806658/FULLTEXT01.pdf.
Patacas, J., N. Dawood, and M. Kassem. 2020. “BIM for facilities management: A framework and a common data environment using open standards.” Autom. Constr. 120 (Dec): 103366. https://doi.org/10.1016/j.autcon.2020.103366.
Persson, S., L. Malmgren, and H. Johnsson. 2009. “Information management in industrial housing design and manufacture.” Electron. J. Inf. Technol. Constr. 14 (Jun): 110–122.
Razkenari, M. A., A. E. Fenner, J. Woo, H. Hakim, and C. J. Kibert. 2018. “A systematic review of applied information systems in industrialized construction.” In Proc., Construction Research Congress 2018, 101–110. Reston, VA: ASCE. https://doi.org/10.1061/9780784481295.011.
Sadeghi, M., M. Mehany, and K. Strong. 2018. “Integrating building information models and building operation information exchange systems in a decision support framework for facilities management.” In Proc., Construction Research Congress 2018, 770–779. Reston, VA: ASCE. https://doi.org/10.1061/9780784481295.077.
Safapour, E., S. Kermanshachi, P. Taneja, and A. Pamidimukkala. 2022. “Exploratory analysis of human-, organizational-, and project-based reworks: Challenges and strategies.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 14 (1): 04521045. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000524.
Saldaña, J. 2013. The coding manual for qualitative researchers. Los Angeles: SAGE.
Schoenherr, T., S. Narayanan, and R. Narasimhan. 2015. “Trust formation in outsourcing relationships: A social exchange theoretic perspective.” Int. J. Prod. Econ. 169 (2015): 401–412. https://doi.org/10.1016/j.ijpe.2015.08.026.
Shen, W., B. Choi, S. Lee, and W. Tang. 2018. “Effects of formal practices and teamwork on interface management performance in large-scale construction projects.” In Proc., Construction Research Congress 2018, 356–366. Reston, VA: ASCE. https://doi.org/10.1061/9780784481271.035.
Sheng, D., L. Ding, B. Zhong, P. E. D. Love, H. Luo, and J. Chen. 2020. “Construction quality information management with blockchains.” Autom. Constr. 120 (Dec): 103373. https://doi.org/10.1016/j.autcon.2020.103373.
Sheriff, A., D. Bouchlaghem, A. El-Hamalawi, and S. Yeomans. 2012. “Information management in UK-based architecture and engineering organizations: Drivers, constraining factors, and barriers.” J. Manage. Eng. 28 (2): 170–180. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000085.
Shin, D. B. 2021. “Information management between project phases: The value creation process of recognizing digital waste between construction and operational phases.” Master’s thesis, Dept. of Real Estate and Construction Management, Royal Institute of Technology.
Shrestha, P. P., B. Davis, and G. M. Gad. 2020. “Investigation of legal issues in construction-manager at-risk projects: Case study of airport projects.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (3): 04520022. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000404.
Succar, B., and E. Poirier. 2020. “Lifecycle information transformation and exchange for delivering and managing digital and physical assets.” Autom. Constr. 112 (Apr): 103090. https://doi.org/10.1016/j.autcon.2020.103090.
Suprapto, M., H. L. M. Bakker, H. G. Mooi, and M. J. C. M. Hertogh. 2016. “How do contract types and incentives matter to project performance?” Int. J. Project Manage. 34 (6): 1071–1087. https://doi.org/10.1016/j.ijproman.2015.08.003.
Sweet, J., and M. M. Schneier. 2013. Legal aspects of architecture, engineering and the construction process. Stamford, CT: Cengage Learning.
Valerio, M. A., N. Rodriguez, P. Winkler, J. Lopez, M. Dennison, Y. Liang, and B. J. Turner. 2016. “Comparing two sampling methods to engage hard-to-reach communities in research priority setting.” BMC Med. Res. Methodol. 16 (1): 1–11. https://doi.org/10.1186/s12874-016-0242-z.
Vaughan, J. L., M. L. Leming, M. Liu, and E. Jaselskis. 2013. “Cost-benefit analysis of construction information management system implementation: Case study.” J. Constr. Eng. Manage. 139 (4): 445–455. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000611.
Walsh, K. P., and M. C. Zehner. 2019. “Practical advice for creating and maintaining project records for potential construction disputes.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 11 (3): 03719002. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000312.
Wang, Y., W. Shen, and W. Tang. 2019. “Effects of contractual incentives in construction projects.” In Proc., Int. Conf. on Construction and Real Estate Management 2019, 256–262. Reston, VA: ASCE. https://doi.org/10.1061/9780784482308.030.
Wang, Z., T. Wang, H. Hu, J. Gong, X. Ren, and Q. Xiao. 2020. “Blockchain-based framework for improving supply chain traceability and information sharing in precast construction.” Autom. Constr. 111 (Mar): 103063. https://doi.org/10.1016/j.autcon.2019.103063.
Wu, W., H. Yang, Q. Li, and D. Chew. 2013. “An integrated information management model for proactive prevention of struck-by-falling-object accidents on construction sites.” Autom. Constr. 34 (Sep): 67–74. https://doi.org/10.1016/j.autcon.2012.10.010.
Xu, Y., H. Y. Chong, and M. Chi. 2022a. “Blockchain in the AECO industry: Current status, key topics, and future research agenda.” Autom. Constr. 134 (Feb): 104101. https://doi.org/10.1016/j.autcon.2021.104101.
Xu, Y., H.-Y. Chong, and M. Chi. 2022b. “Impact of contractual flexibility on BIM-enabled PPP project performance during the construction phase.” J. Infrastruct. Syst. 28 (1): 04021057. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000671.
Yalcinkaya, M., and V. Singh. 2019. “VisualCOBie for facilities management: A BIM integrated, visual search and information management platform for COBie extension.” Facilities 37 (7–8): 502–524. https://doi.org/10.1108/F-01-2018-0011.
Yan, L., and L. Zhang. 2020. “Interplay of contractual governance and trust in improving construction project performance: Dynamic perspective.” J. Manage. Eng. 36 (4): 04020029. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000791.
Zaghloul, R., and F. Hartman. 2003. “Construction contracts: The cost of mistrust.” Int. J. Project Manage. 21 (6): 419–424. https://doi.org/10.1016/S0263-7863(02)00082-0.
Zhang, Y., T. Wang, and K. Yuen. 2021. “Construction site information decentralized management using blockchain and smart contracts.” Comput.-Aided Civ. Infrastruct. Eng. 37 (11): 1450–1467. https://doi.org/10.1111/mice.12804.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 149Issue 3March 2023

History

Received: Feb 10, 2022
Accepted: Nov 8, 2022
Published online: Dec 30, 2022
Published in print: Mar 1, 2023
Discussion open until: May 30, 2023

Permissions

Request permissions for this article.

Authors

Affiliations

Assistant Professor, Dept. of Civil, Environmental, and Architectural Engineering, Univ. of Colorado Boulder, 1111 Engineering Dr., UCB 428, Boulder, CO 80309-0428 (corresponding author). ORCID: https://orcid.org/0000-0001-9099-1538. Email: [email protected]
Daniel P. de Oliveira, Ph.D. [email protected]
Associate Director for Funded Studies, Construction Industry Institute, 3925 West Braker Ln. (R4500), Austin, TX 78759. Email: [email protected]
Professor and John A. Focht Centennial Teaching Fellow in Civil Engineering, Construction Engineering and Project Management Program, Dept. of Civil, Architectural and Environmental Engineering, Univ. of Texas at Austin, 301 E. Dean Keeton St. C1752, Austin, TX 78712-1094. ORCID: https://orcid.org/0000-0002-7789-4474. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Perceptions of Built-Environment Professionals on Using ISO 19650 Standards for Information Management, Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 10.1061/JLADAH.LADR-1076, 16, 1, (2024).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share