Research Article
Sep 1982
Guidelines for Producing Better Specifications
Publication: Journal of the Construction Division
Volume 108, Issue 3
Abstract
Careful preparation, procedures, and methods to produce better specifications will minimize errors and reduce costs of delays and claims for extras. Specifications should be reviewed at preliminary, intermediate, and prefinal submittal stages by all disciplines of the design team. Specifications should be coordinated with the drawings to delete conflicts. The specifications should be checked for constructibility by reviewing existing conditions, restrictions as to access, utility availability, work areas, disposal areas, sequencing of work, time of completion, availability of materials, submittal requirements, quality assurance, and quality control. Many clauses should be discussed with the owner such as changed conditions, escalation, liquidated damages, retained percentages, mobilization, and insurance requirements. An important aspect is to have feedback from the field on how the specifications held up under actual conditions. Owners give an implied warranty to the contractor that the specifications are constructible, otherwise the contractor deserves additional compensation with time extensions to make them constructible.
Get full access to this article
View all available purchase options and get full access to this article.
Information & Authors
Information
Published In
Journal of the Construction Division
Volume 108 • Issue 3 • September 1982
Pages: 438 - 444
Copyright
© 1982 American Society of Civil Engineers.
History
Published in print: Sep 1982
Published online: Feb 11, 2021
Permissions
Request permissions for this article.
Authors
Affiliations
Eli T. Abdallah, M.ASCE
Mgr.,Specifications Dept., Parsons, Brinckerhoff, Quade & Douglas, Inc., One Penn Plaza, New York, N.Y. 10119
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.
Cited by
View Options
Get Access
Access content
Please select your options to get access
Log in/Register
Log in via your institution (Shibboleth)
ASCE Members:
Please log in to see member pricing
Purchase
Save for later Item saved, go to cart Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
Get Access
Access content
Please select your options to get access
Log in/Register
Log in via your institution (Shibboleth)
ASCE Members:
Please log in to see member pricing
Purchase
Save for later Item saved, go to cart Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.