Research Article
Oct 1968
Critical Path Resource Scheduling Algorithm
Publication: Journal of the Construction Division
Volume 94, Issue 2
Abstract
Most early applications of the critical path method did not consider the resources required to complete each project activity. Recently, increased attention has been given to this problem, and several methods have been suggested for scheduling activities which compete for resources which are available in stated maximum amounts. An algorithm is presented for scheduling project activities in such a way that the activities are performed in proper sequence, the total resource availabilities are not exceeded, and the project duration is kept to a minimum. The method assumes that activity durations can vary depending upon the amounts of resources assigned to them. A numerical example, using a small, hypothetical project network, is given. Further computational experience with a network of several hundred activities is reported. A possible extension of the approach, to provide for evaluating the cost of any premium time labor used to reduce project duration, is suggested. It is concluded that approaches of the type given herein are valid and worthy of further investigation.
Get full access to this article
View all available purchase options and get full access to this article.
Information & Authors
Information
Published In
Journal of the Construction Division
Volume 94 • Issue 2 • October 1968
Pages: 161 - 180
Copyright
© 1968 American Society of Civil Engineers.
History
Published in print: Oct 1968
Published online: Feb 11, 2021
Permissions
Request permissions for this article.
Authors
Affiliations
F. Lawrence Bennett, AM.ASCE
Planning and Scheduling Engr., United Engrs. and Constructors Inc., Philadelphia
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.
Cited by
View Options
Get Access
Access content
Please select your options to get access
Log in/Register
Log in via your institution (Shibboleth)
ASCE Members:
Please log in to see member pricing
Purchase
Save for later Item saved, go to cart Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
Get Access
Access content
Please select your options to get access
Log in/Register
Log in via your institution (Shibboleth)
ASCE Members:
Please log in to see member pricing
Purchase
Save for later Item saved, go to cart Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.