Technical Papers
Sep 24, 2024

Precast versus In Situ Concrete: Developing an Initial Feasibility Study for Early Decision-Making in the Australian Construction Industry

Publication: Journal of Architectural Engineering
Volume 30, Issue 4

Abstract

Prefabrication is recognized as a key driver for enhancing efficiency in construction projects, encompassing goals related to schedule, cost, quality, and sustainability. Despite the global surge in interest and growth of the modular construction industry, Australia lags behind in the adoption of prefabrication methods. The decision-making process in the construction sector is characterized by subjectivity, dependence on experience and intuition, and a lack of documented decision-support approaches. Additionally, early project decisions are frequently made without a comprehensive understanding of available options and without the direct involvement of relevant parties. This research, following an exhaustive literature review and pilot study, employs a survey distributed among Australian construction experts to gather their perspectives on the decision-making process and preferences concerning traditional and contemporary concrete construction systems. Statistical methods are employed to analyze the collected data, including ranking methods, factor analysis, and ANOVA. The results of the study highlight that schedule control emerges as the most significant factor influencing the choice between in situ and precast concrete in construction projects, emphasizing the importance of adhering to project timelines. Moreover, Australian construction professionals demonstrate a notable preference for precast concrete in diverse building types, a trend supported by factor analysis results indicating a shift toward prioritizing environmental considerations over cost. The comprehensive objectives include highlighting key stakeholders in the decision-making process, identifying preferred precast building types, prioritizing concrete construction systems, and examining potential outcome variations across the public and private sectors, project contractual parties, and Australian states as perceived by construction industry professionals. This study aims to provide valuable insights, specifically targeting the Australian construction industry, with the ultimate goal of improving the informed and structured decision-making process. It seeks to offer decision makers a preliminary feasibility analysis for adopting an optimal level of modularization in construction projects, incorporating expert knowledge accumulated during the early design stage.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or codes generated or used during the study are available in a repository online in accordance with funder data retention policies.

References

Abdul Nabi, M., and I. H. El-adaway. 2020. “Modular construction: Determining decision-making factors and future research needs.” J. Manage. Eng. 36 (6): 04020085. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000859.
Ahmad, S., R. Soetanto, and C. Goodier. 2019. “Lean approach in precast concrete component production.” Built Environ. Project Asset Manage. 9 (3): 457–470. https://doi.org/10.1108/BEPAM-02-2018-0051.
Allen, I. E., and C. A. Seaman. 2007. “Likert scales and data analyses.” Qual. Prog. 40 (7): 64–65.
Arashpour, M., Y. Bai, G. Aranda-Mena, A. Bab-Hadiashar, R. Hosseini, and P. Kalutara. 2017. “Optimizing decisions in advanced manufacturing of prefabricated products: Theorizing supply chain configurations in off-site construction.” Autom. Constr. 84: 146–153. https://doi.org/10.1016/j.autcon.2017.08.032.
Assaf, M., M. Hussein, S. Abdelkhalek, and T. Zayed. 2023. “A multi-criteria decision-making model for selecting the best project delivery systems for offsite construction projects.” Buildings (Basel) 13 (2): 571. https://doi.org/10.3390/buildings13020571.
Australian_Government. 2022. “Discover trends in the Australian Jobs Market.” Occupation and Industry Profiles. Accessed October 19, 2022. https://labourmarketinsights.gov.au/.
Azhar, S., M. Y. Lukkad, and I. Ahmad. 2013. “An investigation of critical factors and constraints for selecting modular construction over conventional stick-built technique.” Int. J. Construct. Educ. Res. 9 (3): 203–225. https://doi.org/10.1080/15578771.2012.723115.
Balasbaneh, A. T., and W. Sher. 2021. “Life cycle sustainability assessment analysis of different concrete construction techniques for residential building in Malaysia.” Int. J. Life Cycle Assess. 26 (7): 1301–1318. https://doi.org/10.1007/s11367-021-01938-6.
Bartoszyński, R., and M. Niewiadomska-Bugaj. 2008. Probability and statistical inference. 2nd ed. Hoboken, NJ: Wiley.
Blismas, N., and R. Wakefield. 2009. “Drivers, constraints and the future of offsite manufacture in Australia.” Constr. Innovation 9 (1): 72–83. https://doi.org/10.1108/14714170910931552.
Brissi, S. G., L. Debs, and E. Elwakil. 2021. “A review on the factors affecting the use of offsite construction in multifamily housing in the United States.” Buildings (Basel) 11 (1): 1–23. https://doi.org/10.3390/buildings11010005.
Chauhan, K., A. Peltokorpi, R. Lavikka, and O. Seppänen. 2019. “Deciding between prefabrication and on-site construction: A choosing-by-advantage approach.” In Proc., Annual Conf. Int. Group for Lean Construction, 749–758. San Diego: International Group for Lean Construction (IGLC).
Chen, Y., G. E. Okudan, and D. R. Riley. 2010. “Sustainable performance criteria for construction method selection in concrete buildings.” Autom. Constr. 19 (2): 235–244. https://doi.org/10.1016/j.autcon.2009.10.004.
Choi, J. O., X. B. Chen, and T. W. Kim. 2019. “Opportunities and challenges of modular methods in dense urban environment.” Int. J. Construct. Manage. 19 (2): 93–105. https://doi.org/10.1080/15623599.2017.1382093.
Choi, J. O., J. T. O’Connor, and T. W. Kim. 2016. “Recipes for cost and schedule successes in industrial modular projects: Qualitative comparative analysis.” J. Constr. Eng. Manage. 142 (10): 04016055. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001171.
Cleland, N. M., S. H. Rizkalla, and M. E. Patton. 2020. “On “brittle failures in precast parking structures”.” Concr. Int. 42 (10): 53–62.
Dehdasht, G., M. Salim Ferwati, R. M. Zin, and N. Z. Abidin. 2020. “A hybrid approach using entropy and TOPSIS to select key drivers for a successful and sustainable lean construction implementation.” PLoS One 15 (2): e0228746. https://doi.org/10.1371/journal.pone.0228746.
Demirkesen, S., and B. Ozorhon. 2017. “Impact of integration management on construction project management performance.” Int. J. Project Manage. 35 (8): 1639–1654. https://doi.org/10.1016/j.ijproman.2017.09.008.
Du, Q., T. Bao, Y. Li, Y. Huang, and L. Shao. 2019. “Impact of prefabrication technology on the cradle-to-site CO2 emissions of residential buildings.” Clean Technol. Environ. Policy 21 (7): 1499–1514. https://doi.org/10.1007/s10098-019-01723-y.
Florez, L., D. Castro, and J. Irizarry. 2013. “Measuring sustainability perceptions of construction materials.” Constr. Innovation 13 (2): 217. https://doi.org/10.1108/14714171311322174.
George, D., and P. Mallery. 2016. IBM SPSS statistics 23 step by step: A simple guide and reference. 14th ed. New York: Routledge.
Goodier, C., and A. Gibb. 2007. “Future opportunities for offsite in the UK.” Construct. Manage. Econ. 25 (6): 585–595. https://doi.org/10.1080/01446190601071821.
Goodier, C., A. Gibb, M. Mancini, C. Turck, O. Gjepali, and E. Daniels. 2019. “Modularisation and offsite in engineering construction: An early decision-support tool.” Proc. Inst. Civ. Eng. Civ. Eng. 172 (6): 3–14. https://doi.org/10.1680/jcien.19.00015.
Heravi, G., and S. Faeghi. 2014. “Group decision making for stochastic optimization of time, cost, and quality in construction projects.” J. Comput. Civil Eng. 28 (2): 275–283. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000264.
Hong, J., G. Q. Shen, Z. Li, B. Zhang, and W. Zhang. 2018. “Barriers to promoting prefabricated construction in China: A cost–benefit analysis.” J. Cleaner Prod. 172: 649–660. https://doi.org/10.1016/j.jclepro.2017.10.171.
Hosseini, M. R., I. Martek, E. K. Zavadskas, A. A. Aibinu, M. Arashpour, and N. Chileshe. 2018. “Critical evaluation of off-site construction research: A scientometric analysis.” Autom. Constr. 87: 235–247. https://doi.org/10.1016/j.autcon.2017.12.002.
Hou, L., Y. Tan, W. Luo, S. Xu, C. Mao, and S. Moon. 2022. “Towards a more extensive application of off-site construction: A technological review.” Int. J. Construct. Manage. 22 (11): 2154–2165. https://doi.org/10.1080/15623599.2020.1768463.
Hussein, E., G. Kassim, and A. Philip. 2014. “Factors and drivers effecting the decision of using off-site manufacturing (OSM) systems in house building industry.” J. Eng. Project Prod. Manage. 4 (1): 51–58. https://doi.org/10.32738/JEPPM.201401.0006.
Jaillon, L., and C. S. Poon. 2009. “The evolution of prefabricated residential building systems in Hong Kong: A review of the public and the private sector.” Autom. Constr. 18 (3): 239–248. https://doi.org/10.1016/j.autcon.2008.09.002.
Jato-Espino, D., E. Castillo-Lopez, J. Rodriguez-Hernandez, and J. C. Canteras-Jordana. 2014. “A review of application of multi-criteria decision making methods in construction.” Autom. Constr. 45: 151–162. https://doi.org/10.1016/j.autcon.2014.05.013.
Jiang, B., H. Li, L. Dong, Y. Wang, and Y. Tao. 2019. “Cradle-to-site carbon emissions assessment of prefabricated rebar cages for high-rise buildings in China.” Sustainability (Switzerland) 11 (1): Article 42. https://doi.org/10.3390/su11010042.
Jiang, L., Z. Li, L. Long, and Y. Gao. 2018. “Constraints on the promotion of prefabricated construction in China.” Sustainability 10 (7): 2516. https://doi.org/10.3390/su10072516.
Jin, R., S. Gao, A. Cheshmehzangi, and E. Aboagye-Nimo. 2018. “A holistic review of off-site construction literature published between 2008 and 2018.” J. Cleaner Prod. 202: 1202–1219. https://doi.org/10.1016/j.jclepro.2018.08.195.
Jin, R., J. Hong, and J. Zuo. 2020. “Environmental performance of off-site constructed facilities: A critical review.” Energy Build. 207: 109567. https://doi.org/10.1016/j.enbuild.2019.109567.
Kamali, M., and K. Hewage. 2016. “Life cycle performance of modular buildings: A critical review.” Renewable Sustainable Energy Rev. 62: 1171–1183. https://doi.org/10.1016/j.rser.2016.05.031.
Kamali, M., and K. Hewage. 2017. “Development of performance criteria for sustainability evaluation of modular versus conventional construction methods.” J. Cleaner Prod. 142: 3592–3606. https://doi.org/10.1016/j.jclepro.2016.10.108.
Kamali, M., K. Hewage, and R. Sadiq. 2019. “Conventional versus modular construction methods: A comparative cradle-to-gate LCA for residential buildings.” Energy Build. 204: 109479. https://doi.org/10.1016/j.enbuild.2019.109479.
Khalili, A., and D. K. Chua. 2014. “Integrated prefabrication configuration and component grouping for resource optimization of precast production.” J. Constr. Eng. Manage. 140 (2): 4013052. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000798.
Knyziak, P. 2016. “The quality and reliability in the structural design, production, execution and maintenance of the precast residential buildings in Poland in the past and Now.” Key Eng. Mater. 691: 420–431. https://doi.org/10.4028/www.scientific.net/KEM.691.420.
Leech, N. L., K. C. Barrett, and G. A. Morgan. 2015. IBM SPSS for intermediate statistics: Use and interpretation. 5th ed. New York: Routledge.
Li, L., H. Luan, X. Yin, Y. Dou, M. Yuan, and Z. Li. 2022. “Understanding sustainability in off-site construction management: State of the art and future directions.” J. Constr. Eng. Manage. 148 (11): 03122008. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002396.
Lin, G., and Q. Shen. 2007. “Measuring the performance of value management studies in construction: Critical review.” J. Manage. Eng. 23 (1): 2–9. https://doi.org/10.1061/(ASCE)0742-597X(2007)23:1(2).
Loizou, L., K. Barati, X. Shen, and B. Li. 2021. “Quantifying advantages of modular construction: Waste generation.” Buildings (Basel) 11 (12): 622. https://doi.org/10.3390/buildings11120622.
Lu, W., K. Chen, F. Xue, and W. Pan. 2018. “Searching for an optimal level of prefabrication in construction: An analytical framework.” J. Cleaner Prod. 201: 236–245. https://doi.org/10.1016/j.jclepro.2018.07.319.
Mao, C., G. Liu, L. Shen, X. Wang, and J. Wang. 2018. “Structural equation modeling to analyze the critical driving factors and paths for off-site construction in China.” KSCE J. Civ. Eng. 22 (8): 2678–2690. https://doi.org/10.1007/s12205-017-1705-4.
Mao, C., Q. Shen, W. Pan, and K. Ye. 2015. “Major barriers to Off-site construction: The developer’s perspective in China.” J. Manage. Eng. 31 (3): 4014043. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000246.
Mao, C., Q. Shen, L. Shen, and L. Tang. 2013. “Comparative study of greenhouse gas emissions between off-site prefabrication and conventional construction methods: Two case studies of residential projects.” Energy Build. 66: 165–176. https://doi.org/10.1016/j.enbuild.2013.07.033.
Marcher, C., A. Giusti, and D. T. Matt. 2020. “Decision support in building construction: A systematic review of methods and application areas.” Buildings (Basel) 10 (10): 1. https://doi.org/10.3390/buildings10100170.
Mesaros, P., and T. Mandicak. 2015. “Factors affecting the use of modern methods and materials in construction.” IOP Conf. Ser.: Mater. Sci. Eng. 71 (1): 12053. https://doi.org/10.1088/1757-899X/71/1/012053.
Michael Swistun, M. D. 2018. “Offsite construction: Why it's important for the survival of your firm.” Building Design & Construction.
Modular Construction Market Research Report - Market Forecast Till 2030. 2022. “Market research future.” Accessed November 11, 2020. https://www.marketresearchfuture.com/reports/modular-construction-market-1682.
Navaratnam, S., A. Satheeskumar, G. Zhang, K. Nguyen, S. Venkatesan, and K. Poologanathan. 2022. “The challenges confronting the growth of sustainable prefabricated building construction in Australia: Construction industry views.” J. Build. Eng. 48: 103935. https://doi.org/10.1016/j.jobe.2021.103935.
Nibhanupudi, P., and G. B. Rahul. 2020. “Comparative study on use of precast framed structure and precast load bearing wall structure.” Mater. Today:. Proc. 33: 537–542. https://doi.org/10.1016/j.matpr.2020.05.219.
Pan, W., A. G. F. Gibb, and A. R. J. Dainty. 2007. “Perspectives of UK housebuilders on the use of offsite modern methods of construction.” Construct. Manage. Econ. 25 (2): 183–194. https://doi.org/10.1080/01446190600827058.
Polat, G. 2008. “Factors affecting the use of precast concrete systems in the United States.” J. Constr. Eng. Manage. 134 (3): 169–178. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:3(169).
Rafieizonooz, M., M. R. Salim, K. Khankhaje, M. Warid Hussin, A. Zarebidaki, and Salmiati. 2015. “Determining the causes of delay by using factor analysis in Tehran’s construction projects.” Appl. Mech. Mater. 735: 109–116. https://doi.org/10.4028/www.scientific.net/AMM.735.109.
Rahman, S., H. Odeyinka, S. Perera, and Y. Bi. 2012. “Product-cost modelling approach for the development of a decision support system for optimal roofing material selection.” Expert Syst. Appl. 39 (8): 6857–6871. https://doi.org/10.1016/j.eswa.2012.01.010.
Seweryn, M., K. A. Ostrowski, and Ł Sadowski. 2022. “Large panel system technology in the second half of the twentieth century—Literature review, recycling possibilities and research gaps.” Buildings (Basel) 12 (11): 1822. https://doi.org/10.3390/buildings12111822.
Shahpari, M., F. M. Saradj, M. S. Pishvaee, and S. Piri. 2020. “Assessing the productivity of prefabricated and in-situ construction systems using hybrid multi-criteria decision making method.” J. Build. Eng. 27: 100979. https://doi.org/10.1016/j.jobe.2019.100979.
Sharafi, P., M. Rashidi, B. Samali, H. Ronagh, and M. Mortazavi. 2018. “Identification of factors and decision analysis of the level of modularization in building construction.” J. Archit. Eng. 24 (2): 04018010. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000313.
Sheikh, A. H. A., M. Ikram, R. M. Ahmad, H. Qadeer, and M. Nawaz. 2019. “Evaluation of key factors influencing process quality during construction projects in Pakistan.” Grey Syst. 9 (3): 321–335. https://doi.org/10.1108/GS-01-2019-0002.
Shen, K.-Y., E. K. Zavadskas, and G.-H. Tzeng. 2018. “Updated discussions on ‘hybrid multiple criteria decision-making methods: A review of applications for sustainability issues.’” Ekonomska Istraživanja 31 (1): 1437–1452. https://doi.org/10.1080/1331677X.2018.1483836.
Smith, R. E., and J. D. Quale. 2017. Offsite architecture constructing the future. London, UK: Routledge.
Steinhardt, D. A., and K. Manley. 2016. “Adoption of prefabricated housing—The role of country context.” Sustainable Cities Soc. 22: 126–135. https://doi.org/10.1016/j.scs.2016.02.008.
Sutrisna, M., V. Ramnauth, and A. Zaman. 2022. “Towards adopting off-site construction in housing sectors as a potential source of competitive advantage for builders.” Archit. Eng. Des. Manage. 18 (3): 165–183. https://doi.org/10.1080/17452007.2020.1807306.
Tam, V. W. Y., C. M. Tam, S. X. Zeng, and W. C. Y. Ng. 2007. “Towards adoption of prefabrication in construction.” Build. Environ. 42 (10): 3642–3654. https://doi.org/10.1016/j.buildenv.2006.10.003.
Tan, Q., H. Zhu, S. Yang, X. Yang, and L. Ou. 2024. “Precast assembled road paving technology: Progress and prospects.” Materials 17 (10): 2245. https://doi.org/10.3390/ma17102245.
Tomek, R. 2017. “Advantages of precast concrete in highway infrastructure construction.” Procedia Eng. 196: 176–180. https://doi.org/10.1016/j.proeng.2017.07.188.
van Kesteren, I. E. H. 2008. “Product designers’ information needs in materials selection.” Mater. Des. 29 (1): 133–145. https://doi.org/10.1016/j.matdes.2006.11.008.
Wang, Z., W. Pan, and Z. Zhang. 2020. “High-rise modular buildings with innovative precast concrete shear walls as a lateral force resisting system.” Structures 26: 39–53. https://doi.org/10.1016/j.istruc.2020.04.006.
Watts, A. 2019. Modern construction handbook. 5th ed. Berlin, Germany: Birkhäuser Verlag GmbH. https://doi.org/10.1515/9783035617085.
Wuni, I. Y., and G. Q. Shen. 2022. “Towards a decision support for modular integrated construction: An integrative review of the primary decision-making actors.” Int. J. Construct. Manage. 22 (5): 929–948. https://doi.org/10.1080/15623599.2019.1668633.
Xie, H., M. M. Chowdhury, R. R. A. Issa, and W. Shi. 2018. “Simulation of dynamic energy consumption in modular construction manufacturing processes.” J. Archit. Eng. 24 (1): 04017034. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000289.
Xu, Z., T. Zayed, and Y. Niu. 2020. “Comparative analysis of modular construction practices in mainland China, Hong Kong and Singapore.” J. Cleaner Prod. 245: 118861. https://doi.org/10.1016/j.jclepro.2019.118861.
Xue, H., S. Zhang, Y. Su, and Z. Wu. 2017. “Factors affecting the capital cost of prefabrication—A case study of China.” Sustainability (Basel, Switzerland) 9 (9): 1512. https://doi.org/10.3390/su9091512.
Xue, H., S. Zhang, Y. Su, Z. Wu, and R. J. Yang. 2018. “Effect of stakeholder collaborative management on off-site construction cost performance.” J. Cleaner Prod. 184: 490–502. https://doi.org/10.1016/j.jclepro.2018.02.258.
Yu, Q. Z., L. Y. Ding, C. Zhou, and H. B. Luo. 2014. “Analysis of factors influencing safety management for metro construction in China.” Accid. Anal. Prev. 68: 131–138. https://doi.org/10.1016/j.aap.2013.07.016.
Zhai, X., R. Reed, and A. Mills. 2014. “Factors impeding the offsite production of housing construction in China: An investigation of current practice.” Construct. Manage. Econ. 32 (1–2): 40–52. https://doi.org/10.1080/01446193.2013.787491.
Zhao, W., Y. Jiang, Y. Liu, and J. Shu. 2022. “Automated recognition and measurement based on three-dimensional point clouds to connect precast concrete components.” Autom. Constr. 133: 104000. https://doi.org/10.1016/j.autcon.2021.104000.
Zhu, X., X. Meng, and M. Zhang. 2021. “Application of multiple criteria decision making methods in construction: A systematic literature review.” J. Civ. Eng. Manage. 27 (6): 372–403. https://doi.org/10.3846/jcem.2021.15260.

Information & Authors

Information

Published In

Go to Journal of Architectural Engineering
Journal of Architectural Engineering
Volume 30Issue 4December 2024

History

Received: May 7, 2023
Accepted: Jul 8, 2024
Published online: Sep 24, 2024
Published in print: Dec 1, 2024
Discussion open until: Feb 24, 2025

Permissions

Request permissions for this article.

Authors

Affiliations

Ph.D. Student, School of Architecture and Built Environment, Queensland Univ. of Technology, Gardens Point Campus, 2 George St., Brisbane, QLD 4000, Australia (corresponding author). ORCID: https://orcid.org/0009-0008-7679-2207. Email: [email protected]
Sara Omrani [email protected]
Senior Lecturer, Virtual Design and Construction, Queensland Univ. of Technology, Gardens Point Campus, 2 George St., Brisbane, QLD 4000, Australia. Email: [email protected]
Robin Drogemuller [email protected]
Professor, Virtual Design and Construction, Queensland Univ. of Technology, Gardens Point Campus, 2 George St., Brisbane, QLD 4000, Australia. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share