Gap Analysis in Cost Estimation, Risk Analysis, and Contingency Computation of Transportation Infrastructure Projects: A Guide to Resource and Policy–Based Strategy Establishment
Publication: Practice Periodical on Structural Design and Construction
Volume 25, Issue 1
Abstract
Practitioners and researchers involved in DOT projects frequently face challenges associated with cost overruns that lead to disagreements between stakeholders and decrease the accuracy of construction cost estimates. To address this issue, this research project identified scoping, cost estimation, and risk assessment practices that are implemented nationwide in the early phases of highway and bridge construction projects. A DOT case study was selected for investigating and assessing the current practices, and interviews were conducted with some of the case study DOT districts’ employees. The results were compared with the practices identified in research documents and effective practices, and a gap analysis was performed. Recommendations were developed, and pilot studies of three projects from the case study districts were conducted to examine the effectiveness of the recommendations. The recommendations were structured in five main areas: cost estimating, documentation, risk assessment and contingency calculations, executive policies, and general issues. The results revealed that most of the recommendations had a considerable impact on the case study DOT’s procedures of scoping, cost estimates, and risk assessments. The findings of this research project will help DOTs mitigate cost overruns by accurately defining the project scope, estimating the costs, and assessing the risks of their projects.
Get full access to this article
View all available purchase options and get full access to this article.
References
Abdou, S. M., K. Yong, and M. Othman. 2016. “Project complexity influence on project management performance.” In Proc., MATEC Web of Conf. 66. Les Ulis, France: EDP Sciences.
Ahmadi, M., K. Behzadian, A. Ardeshir, and Z. Kapelan. 2017. “Comprehensive risk management using fuzzy FMEA and MCDA techniques in highway construction projects.” J. Civ. Eng. Manage. 23 (2): 300–310. https://doi.org/10.3846/13923730.2015.1068847.
Al-Hazim, N. 2015. “Delay and cost overrun in road construction projects in Jordan.” Int. J. Eng. Technol. 4 (2): 288–293. https://doi.org/10.14419/ijet.v4i2.4409.
Al-Hazim, N., Z. A. Salem, and H. Ahmad. 2017. “Delay and cost overrun in infrastructure projects in Jordan.” Procedia Eng. 182: 18–24. https://doi.org/10.1016/j.proeng.2017.03.105.
Anderson, S., K. R. Molenaar, and C. Schexnayder. 2007. Guidance for cost estimation and management for highway projects during planning, programming and preconstruction. Washington, DC: Transportation Research Board.
Ashley, D. B., J. Diekmann, and K. Molenaar. 2006. Guide to risk assessment and allocation for highway construction management. Washington, DC: Federal Highway Administration.
Baccarini, D. 1996. “The concept of project complexity—A review.” Int. J. Project Manage. 14 (4): 201–204. https://doi.org/10.1016/0263-7863(95)00093-3.
Barraza, G. 2011. “Probabilistic estimation and allocation of project time contingency.” J. Constr. Eng. Manage. 137 (4): 259–265. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000280.
CII (Construction Industry Institute). 1989. Management of project risks and uncertainties: Publication 6-8. Austin, TX: Univ. of Texas at Austin.
Corning, P. A. 1998. “‘The synergism hypothesis’: On the concept of synergy and its role in the evolution of complex systems.” J. Soc. Evol. Syst. 21 (2): 133–172. https://doi.org/10.1016/S1061-7361(00)80003-X.
Creedy, G., M. Skitmore, and J. Wong. 2010. “Evaluation of risk factors leading to cost overrun in delivery of highway construction projects.” J. Constr. Eng. Manage. 136 (5): 528–537. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000160.
Farnsworth, C. B., R. Warr, J. E. Weidman, and D. M. Hutchings. 2016. “Effects of CM/GC project delivery on managing process risk in transportation construction.” J. Constr. Eng. Manage. 142 (3): 04015091. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001091.
Forcada, N., C. Serrat, S. Rodriguez, and R. Bortolini. 2017. “Communication key performance indicators for selecting construction project bidders.” J. Manage. Eng. 33 (6): 04017033. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000552.
Habibi, M., S. Kermanshachi, and E. Safapour. 2018. “Engineering, procurement and construction cost and schedule performance leading indicators: State-of-the-art review.” In Proc., Construction Research Congress. Reston, VA: ASCE.
He, Q. H., L. Luo, Y. Hu, and A. P. C. Chan. 2015. “Measuring the complexity of mega construction projects in China—A fuzzy analytic network process analysis.” Int. J. Project Manage. 33 (3): 549–563. https://doi.org/10.1016/j.ijproman.2014.07.009.
Kermanshachi, S., C. Beaty, and S. D. Anderson. 2016. “Improving early phase cost estimation and risk assessment: A department of transportation case study.” In Proc., 95th Annual Meeting on Transportation Research Board. Washington, DC: Transportation Research Board.
Kermanshachi, S., and E. Safapour. 2019. “Identification and quantification of project complexity from perspective of primary stakeholders in US construction projects.” J. Civ. Eng. Manage. 25 (4): 380–398. https://doi.org/10.3846/jcem.2019.8633.
Kermanshachi, S., E. Safapour, S. Anderson, P. Goodrum, T. R. B. Taylor, and H. Sadatsafavi. 2019. “Development of multi-level scoping process framework for transportation infrastructure projects using IDEF modeling technique.” In Proc., 98th Annual Conf. Washington, DC: Transportation Research Board.
Larsen, J. K., G. Q. Shen, S. M. Lindhard, and T. D. Brunoe. 2016. “Factors affecting schedule delay, cost overrun, and quality level in public construction projects.” J. Manage. Eng. 32 (1): 04015032. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000391.
Love, P. E. D., D. D. Ahiaga-Dagbui, and Z. Irani. 2016. “Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation.” Trans. Res. Part A Policy Pract. 92 (Oct): 184–194. https://doi.org/10.1016/j.tra.2016.08.007.
Manata, B., V. Miller, S. Mollaoglu, and A. J. Garcia. 2018. “Measuring key communication behaviors in integrated project delivery teams.” J. Manage. Eng. 34 (4): 06018001. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000622.
MnDOT (Minnesota Department of Transportation). 2008. Cost estimation and cost management. Technical Reference Manual. Saint Paul, MN: MnDOT.
Molenaar, K. R. 2005. “Programmatic cost risk analysis for highway megaprojects.” J. Constr. Eng. Manage. 131 (3): 343–353. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:3(343).
Molenaar, K. R., S. Anderson, and C. Schexnayder. 2009. Guidebook on risk analysis tools and management practices to control transportation project cost. Washington, DC: Transportation Research Board.
Odeck, J., M. Welde, and G. H. Volden. 2015. “The impact of external quality assurance of costs estimates on cost overruns: Empirical evidence from the Norwegian road sector.” Eur. J. Transp. Infrastruct. Res. 15 (3): 286–303. https://doi.org/10.18757/ejtir.2015.15.3.3079.
Perera, S., C. S. Hayles, and S. Kerlin. 2011. “An analysis of value management in practice: The case of Northern Ireland’s construction industry.” J. Financial Manage. Prop. Constr. 16 (2): 94–110. https://doi.org/10.1108/13664381111153097.
Petroutsatou, K., S. Georgopoulos, S. Lambropoulos, and J. P. Pantouvakis. 2012. “Early cost estimating of road tunnel construction using neural networks.” J. Constr. Eng. Manage. 138 (6): 679–687. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000479.
Puddicombe, M. 2012. “Novelty and technical complexity: Critical constructs in capital projects.” J. Constr. Eng. Manage. 138 (5): 613–620. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000459.
Qureshi, S. M., and C. W. Kang. 2015. “Analyzing the organizational factors of project complexity using structural equation modeling.” Int. J. Project Manage. 33 (1): 165–176. https://doi.org/10.1016/j.ijproman.2014.04.006.
Rosenfeld, Y. 2014. “Root-cause analysis of construction-cost overruns.” J. Constr. Eng. Manage. 140 (1): 04013039. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000789.
Safapour, E., S. Kermanshachi, M. Habibi, and J. Shane. 2018a. “Resource-based exploratory analysis of project complexity impact on phase-based cost performance behavior.” In Proc., Construction Research Congress. Reston, VA: ASCE.
Safapour, E., S. Kermanshachi, and I. J. Ramaji. 2018b. “Entity-based investigation of project complexity impact on size and frequency of construction phase change orders.” In Proc., Construction Research Congress. Reston, VA: ASCE.
Shafiei-Monfared, S., and K. Jenab. 2012. “A novel approach for complexity measure analysis in design projects.” J. Eng. Des. 23 (3): 185–194. https://doi.org/10.1080/09544828.2011.554389.
Tran, D. Q., and K. R. Molenaar. 2014. “Exploring critical delivery selection risk factors for transportation design and construction projects.” Eng. Constr. Archit. Manage. 21 (6): 631–647. https://doi.org/10.1108/ECAM-11-2013-0103.
Venkataraman, R. R., and J. K. Pinto. 2008. Cost and value management in projects. Hoboken, NJ: Wiley.
Welde, M., and J. Odeck. 2017. “Cost escalation in the front-end of projects–empirical evidence from Norwegian road projects.” Transp. Rev. 37 (5): 612–630. https://doi.org/10.1080/01441647.2016.1278285.
WSDOT (Washington State DOT). 2009. Cost estimating manual for WSDOT projects. Olympia, WA: Washington State Dept. of Transportation.
Information & Authors
Information
Published In
Copyright
©2019 American Society of Civil Engineers.
History
Received: Feb 26, 2019
Accepted: Aug 6, 2019
Published online: Sep 28, 2019
Published in print: Feb 1, 2020
Discussion open until: Feb 28, 2020
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.