Technical Papers
Nov 11, 2016

Quantifying the Impact of Cost-Based Incentives on the Performance of Building Projects in the United States

Publication: Practice Periodical on Structural Design and Construction
Volume 22, Issue 2

Abstract

Construction projects often suffer from cost overruns and time delays. Incentive/disincentive (I/D) provisions are contracting strategies that encourage stakeholders to complete a project with optimal cost and time. During the last decade, incentive mechanisms have gained momentum in numerous industries and are becoming increasingly adopted in building projects. While few studies have investigated the effect of incentives on the construction industry, mostly using qualitative research approaches, the current study adopted a quantitative approach to measure the performance impacts of cost-based incentives in the U.S. building construction industry. First, the paper summarizes the previous research on the topic, including the benefits and types of incentives. Second, a survey conducted to collect data from more than 30 U.S. building projects is discussed. Third, the statistical methods used to analyze the collected data and test the significance of observed differences in performance between the two data sets, projects with incentives and projects without incentives, are presented. The results show that cost-based incentives can reduce cost and schedule overruns by 5.3 and 8.4%, respectively. This paper contributes to the growing body of knowledge on incentives; it provides empirical findings about the impact of incentives on the cost and schedule overruns of building projects in the United States.

Get full access to this article

View all available purchase options and get full access to this article.

References

Abdul-Rahman, H., Takim, R., and Min, W. S. (2009). “Financial-related causes contributing to project delays.” J. Retail Leisure Property, 8(3), 225–238.
Al-Harbi, K. M. (1998). “Sharing fractions in cost-plus-incentive-fee contracts.” Int. J. Project Manage., 16(2), 73–80.
Arditi, D., Khisty, J., and Yasamis, F. (1997). “Incentive/disincentive provisions in highway contracts.” J. Constr. Eng. Manage., 302–307.
Black, G., Holley, D., Solan, D., and Bergloff, M. (2014). “Fiscal and economic impacts of state incentives for wind energy development in the western United States.” Renewable Sustainable Energy Rev., 34, 136–144.
Bower, D., Ashby, G., Gerald, K., and Smyk, W. (2002). “Incentive mechanisms for project success.” J. Manage. Eng., 37–43.
Broome, J., and Perry, J. (2002). “How practitioners set share fractions in target cost contracts.” Int. J. Project Manage., 20(1), 59–66.
Bubshait, A. A. (2003). “Incentive/disincentive contracts and its effects on industrial projects.” Int. J. Project Manage., 21(1), 63–70.
Bureau of Economic Analysis. (2016). “Estimated compensation and construction GDP.” 〈http://www.bea.gov/industry/gdpbyind_data.htm〉.
Bureau of Labor Statistics. (2016). “Estimation of current labor force in construction industry.” 〈http://www.bls.gov/iag/tgs/iag23.htm〉.
Chan, D. W., Lam, P. T., and Chan, A. P. (2010). “Achieving better performance through target cost contracts: The tale of an underground railway station modification project.” Facilities, 28(5/6), 261–277.
Chokor, A., El Darazi, G., El Nakib, I., Faour, B., and Khattar, R. (2014). “Towards a risk assessment process: The case of contractors in greater Beirut area.” Proc., 13th Faculty of Engineering and Architecture Student and Alumni Conf. at the American Univ. of Beirut, Beirut, Lebanon.
CII (Construction Industry Institute). (1995). “Use of incentives.” Implementation Status Rep., Austin, TX.
El Asmar, M., Hanna, A. S., and Loh, W. (2013). “Quantifying performance for the integrated project delivery system as compared to established delivery systems.” J. Constr. Eng. Manage., 04013012.
El Asmar, M., Hanna, A. S., and Loh, W. (2016). “Evaluating integrated project delivery (IPD) using the project quarterback rating.” J. Constr. Eng. Manage., 04015046.
Geller, E. S. (1999). “Behavior-based safety: Confusion, controversy, and clarification.” Occup. Health Saf., 68(1), 40–49.
Grubbs, F. E. (1969). “Procedures for detecting outlying observations in samples.” Technometrics, 11(1), 1–21.
Hasan, A., and Jha, K. N. (2016). “Acceptance of the incentive/disincentive contracting strategy in developing construction markets: Empirical study from India.” J. Constr. Eng. Manage., 04015064
HM (Her Majesty’s Treasury, Central Unit on Procurement). (1991). “Incentivisation.” Guidance No. 58, Her Majesty’s Stationary Office, London.
Holdaway, K. (2014). Harness oil and gas big data with analytics: Optimize exploration and production with data-driven models, John Wiley & Sons, Hoboken, NJ.
Ibbs, C. W., and Ashley, D. B. (1987). “Impact of various construction contract clauses.” J. Constr. Eng. Manage., 501–521.
Jaafari, A. (1996). “Twinning time and cost in incentive-based contracts.” J. Manage. Eng., 62–72.
Jaraiedi, M., Plummer, R. W., and Aber, M. S. (1995). “Incentive/disincentive guidelines for highway construction contracts.” J. Constr. Eng. Manage., 112–120.
Lehmann, E., and Romano, J. (2005). Testing statistical hypotheses, Springer, New York.
Liska, R. W., and Snell, B. (1992). “Financial incentive programs for average size construction firm.” J. Constr. Eng. Manage., 667–676.
Meng, X., and Gallagher, B. (2011). “The impact of incentive mechanisms on project performance.” Int. J. Project Manage., 30(3), 352–362.
Molenaar, K. R., Jeong, P., and Washington, S. (2009). “Framework for measuring corporate safety culture and its impact on construction safety performance.” J. Constr. Eng. Manage., 488–496.
Rose, T., and Manley, K. (2010). “Client recommendations for financial incentives on construction projects.” Eng. Constr. Archit. Manage., 17(3), 252–267.
Rose, T., and Manley, K. (2011). “Motivation toward financial incentive goals on construction projects.” J. Bus. Res., 64(7), 765–773.
Severt, K., and Breiter, D. (2010). “The anatomy of an incentive travel program.” Incentive Research Foundation. 〈http://www.incentivesolutions.com/wp-content/uploads/2014/08/travel-incentives-boost-retention.pdf〉.
Shr, J. F., and Chen, W. T. (2004). “Setting maximum incentive for incentive/disincentive contracts for highway projects.” J. Constr. Eng. Manage., 84–93.
Stukhart, G. (1984). “Contractual incentives.” J. Constr. Eng. Manage.,
Sun, M., and Meng, X. (2009). “Taxonomy for change causes and effects in construction projects.” Int. J. Project Manage., 27(6), 560–572.
Teo, E. A., Ling, F. Y., and Chong, A. F. (2005). “Framework for project managers to manage construction safety.” Int. J. Project Manage., 23(4), 329–341.
Wilk, M., and Gnanadesikan, R. (1968). “Probability plotting methods for the analysis for the analysis of data.” Biometrika, 55(1), 1–17.

Information & Authors

Information

Published In

Go to Practice Periodical on Structural Design and Construction
Practice Periodical on Structural Design and Construction
Volume 22Issue 2May 2017

History

Received: Aug 25, 2016
Accepted: Oct 11, 2016
Published online: Nov 11, 2016
Discussion open until: Apr 11, 2017
Published in print: May 1, 2017

Permissions

Request permissions for this article.

Authors

Affiliations

Abbas Chokor, S.M.ASCE [email protected]
Ph.D. Student and Research Associate, School of Sustainable Engineering and the Built Environment, Arizona State Univ., P.O. Box 873005, Tempe, AZ 85287-3005. E-mail: [email protected]
Mounir El Asmar, Ph.D., A.M.ASCE [email protected]
Assistant Professor and Senior Sustainability Scientist, School of Sustainable Engineering and the Built Environment, Arizona State Univ., P.O. Box 873005, Tempe, AZ 85287-3005 (corresponding author). E-mail: [email protected]
Bala Sai Paladugu [email protected]
Graduate Student, School of Sustainable Engineering and the Built Environment, Arizona State Univ., P.O. Box 873005, Tempe, AZ 85287-3005. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share