Jacking Force Analysis of Pipe Installation Using a Modified Guided Boring Method
Publication: Journal of Pipeline Systems Engineering and Practice
Volume 8, Issue 4
Abstract
The modified guided boring method (MGBM) is a new pipe installation method used in hard ground, where a conventional guided boring method is not applicable. Estimation of the required jacking force for pipe installation is critical for the design of MGBM projects; however, no such study has previously been performed. Hence, this paper presents a study on the jacking force estimation of pipe installation using MGBM. First, the field data of jacking force during the pipe installation stage of an MGBM project in Edmonton, Canada, was collected and analyzed. Second, three commonly used jacking force estimation models developed for microtunneling or pipe jacking installation were adapted to calculate the jacking force for this MGBM project, and the results were compared with the field data. The comparison indicated that an adapted model overestimated the field data. When the passive earth pressure was used as the face pressure, another adapted model yielded a close estimation to the field data, and a third model slightly underestimated the field data.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
The authors thank the Natural Sciences and Engineering Research Council of Canada (NSERC), the City of Edmonton, and the Consortium for Engineered Trenchless Technologies (CETT) at the University of Alberta for supporting this study. They also thank Ms. Lauren Wozny and Sheena Moore at CETT for assisting in the editorial review of the manuscript.
References
ASTM. (2007). “Standard test method for consolidated undrained direct simple shear testing of cohesive soils.” ASTM D6528-07, West Conshohocken, PA.
Bai, J., Ma, B., Zhou, P., and Jia, Z. (2013). “Analysis and calculation of jacking force in the mudstone formation.” Pipelines 2013, ASCE, Reston, VA, 905–914.
Bennett, R. D. (1998). “Jacking loads and ground deformations associated with microtunneling.” Ph.D. thesis, Univ. of Illinois at Urbana-Champaign, Champaign, IL.
Boschert, J. (2007). “Pilot tube microtunneling explodes in the U.S. using vitrified clay jacking pipe.” Pipelines 2007, ASCE, Reston, VA, 1–9.
Bruce, M. H. (2002). “Pilot tube microtunneling’s cost effective advantage for new installation of urban sewers.” Pipelines 2002, ASCE, Reston, VA, 1–13.
Chapman, D. N., and Ichioka, Y. (1999). “Prediction of jacking forces for microtunnelling operations.” Tunnell. Underground Space Technol., 14(1), 31–41.
Haslinger, L., Gill, D., and Boschert, J. (2007). “Pilot tube microtunneling project parallels the shore of Lake Erie in Toledo Ohio: A case study.” No-Dig Conf. and Exhibition, North American Society for Trenchless Technology, Cleveland, 1–10.
Lueke, J. S., Gottipati, V., and Boschert, J. (2012). “Pilot tube microtunneling: A current state of practice in North America.” Construction Research Congress 2012, ASCE, Reston, VA, 159–168.
Marshall, M. (1998). “Pipe-jacked tunneling: Jacking loads and ground movements.” Ph.D. thesis, Univ. of Oxford, Oxford, U.K.
Najafi, M., and Gokhale, S. B. (2005). Trenchless technology: Pipeline and utility design, construction, and renewal, McGraw-Hill, New York.
Olson, M., Ariaratnam, S., and Lueke, J. (2016). “Jacking force and productivity analysis of pilot tube microtunneling installations.” J. Pipeline Syst. Eng. Pract., 04015018.
Rahjoo, S., Najafi, M., Williammee, R., and Khankarli, G. (2012). “Comparison of jacking load models for trenchless pipe jacking.” Pipelines 2012, ASCE, Reston, VA, 1507–1520.
Sewing, E., Luth, M., and Boschert, J. (2009). “The first major pilot tube microtunneling project in the St. Louis metropolitan area.” No-Dig Conf. and Exhibition, North American Society for Trenchless Technology, Cleveland, 1–10.
Staheli, K. (2006). “Jacking force prediction: An interface friction approach based on pipe surface roughness.” Ph.D. thesis, Georgia Institute of Technology, Atlanta.
Stein, D. (2005). Trenchless technology for installation of cables and pipelines, Stein and Partner, Bochum, Germany.
Stein, D., Mollers, K., and Bielecki, R. (1989). Microtunneling: Installation and renewal of non-man size supply and sewerage lines by the trenchless construction methods, Ernst and Sohn, Berlin.
Yi, Y., Gay, L., Bayat, A., and Ranjbar, M. (2016). “Case study of pipeline installation using a modified guided boring method.” J. Pipeline Syst. Eng. Pract., 05016002.
Information & Authors
Information
Published In
Copyright
©2017 American Society of Civil Engineers.
History
Received: Aug 18, 2016
Accepted: Mar 23, 2017
Published online: Jun 20, 2017
Published in print: Nov 1, 2017
Discussion open until: Nov 20, 2017
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.