Case Study of Pipeline Installation Using a Modified Guided Boring Method
Publication: Journal of Pipeline Systems Engineering and Practice
Volume 7, Issue 4
Abstract
The Guided Boring Method (GBM), also referred to as Pilot Tube Microtunneling (PTMT), is a widely used trenchless technology for pipeline installation with grade precision. However, PTMT is not applicable in nondisplaceable soils, where it is unable to install pilot tubes. In this context, this study introduces a Modified Guided Boring Method (MGBM) for pipeline installation in nondisplaceable soils. The guided boring is performed without the use of pilot tubes and coupled with hollow-center augers for target site path. This study presents the first pipeline installation project performed with the MGBM, and the case study results confirm that this technology can successfully install pipelines with grade precision in hard ground conditions. This study also assesses the MGBM’s economic performance using the project’s productivity and risk measurements, which can be used to facilitate budget and time estimates of future projects.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
The authors would like to thank the Natural Sciences and Engineering Research Council of Canada, the City of Edmonton for their financial and in-kind support in this research. The authors are also grateful to Dr. J. Lueke at Associated Engineering for his guidance in instrumentation and data collection. Their appreciation is also extended to the Consortium for Engineered Trenchless Technologies (CETT), University of Alberta, for providing this research opportunity and Ms. Lauren Wozny and Sheena Moore at CETT for editorial review of this paper.
References
@Risk Version 6.0 [Computer software]. Palisade Corporation, Ithaca, NY.
Akintoye, A. S., and MacLeod, M. J. (1997). “Risk analysis and management in construction.” Int. J. Project Manage., 15(1), 31–38.
Ali, S., Zayed, T., and Hegab, M. (2007). “Modeling the effect of subjective factors on productivity of trenchless technology application to buried infrastructure systems.” J. Constr. Eng. Manage., 743–748.
Allouche, E., and Ariaratnam, S. (2002). “State-of-the-art-review of no-dig technologies for new installations.” Pipelines 2002, ASCE, Reston, VA, 1–12.
Ariaratnam, S. T., Chan, W., and Choi, D. (2006). “Utilization of trenchless construction methods in mainland China to sustain urban infrastructure.” Pract. Period. Struct. Des. Constr., 134–141.
Ariaratnam, S. T., Piratla, K., Cohen, A., and Olson, M. (2013). “Quantification of sustainability index for underground utility infrastructure projects.” J. Constr. Eng. Manage., A4013002.
Boschert, J. (2007). “Pilot tube microtunneling explodes in the U.S. using vitrified clay jacking pipe.” Pipelines 2007, ASCE, Reston, VA, 1–9.
Bruce, M. H. (2002). “Pilot tube microtunneling’s cost effective advantage for new installation of urban sewers.” Pipelines 2002, ASCE, Reston, VA, 1–13.
Gill, D. (2010). “A short course in pilot tube microtunneling.” Rocky Mt. Trenchless J., 15–16.
Gottipati, V. (2011). Pilot tube microtunneling: Profile of an emerging industry, Arizona State Univ., Phoenix.
Haslinger, L., Gill, D., and Boschert, J. (2007). “Pilot tube microtunneling project parallels the shore of lake erie in Toledo Ohio: A case study.” No-Dig Conf. & Exhibition, North American Society for Trenchless Technology, San Diego, 1–10.
Jung, Y. J., and Sinha, S. K. (2007). “Evaluation of trenchless technology methods for municipal infrastructure system.” J. Infrastruct. Syst., 144–156.
Lueke, J. S., and Ariaratnam, S. T. (2001). “Rehabilitation of underground infrastructure utilizing trenchless pipe replacement.” Pract. Period. Struct. Des. Constr., 25–34.
Lueke, J. S., Gottipati, V., and Boschert, J. (2012). “Pilot tube microtunneling: A current state of practice in North America.” Construction Research Congress 2012, ASCE, Reston, VA, 159–168.
Mak, S., and Picken, D. (2000). “Using risk analysis to determine construction project contingencies.” J. Constr. Eng. Manage., 130–136.
Matthews, J. C., and Monsalve, J. C. G. (2012). “Trenchless infrastructure construction techniques used in Colombia.” Pract. Period. Struct. Des. Constr., 166–170.
Najafi, M., and Gokhale, S. B. (2005). Trenchless technology: Pipeline and utility design, construction, and renewal, McGraw-Hill, New York.
Olson, M. P. (2013). Pilot tube microtunneling: Instrumentation and monitoring for jacking force and productivity analysis, Arizona State Univ., Phoenix.
Olson, M. P., and Lueke, J. S. (2013). “Productivity analysis of pilot tube microtunneling installations.” No-Dig Conf. & Exhibition, North American Society for Trenchless Technology, Sacramento, CA, 1–8.
Sewing, E., Luth, M., and Boschert, J. (2009). “The first major pilot tube microtunneling project in the St. Louis Metropolitan area.” No-Dig Conf. & Exhibition, North American Society for Trenchless Technology, Toronto, 1–10.
Sterling, R. L. (2010). “No-dig techniques and challenges.” J. GeoEng., 5(3), 63–67.
Tang, P., Olson, M. P., Shen, Z., and Ariaratnam, S. T. (2013). “Automated monitoring of pilot tube microtunneling installations through pattern recognition in time-series data of hydraulic pressure.” Pipelines 2013, ASCE, Reston, VA, 974–983.
Zio, E. (2007). An introduction to the basics of reliability and risk analysis[e-book], World Scientific, Singapore.
Information & Authors
Information
Published In
Copyright
© 2016 American Society of Civil Engineers.
History
Received: May 29, 2015
Accepted: Feb 10, 2016
Published online: May 6, 2016
Discussion open until: Oct 6, 2016
Published in print: Nov 1, 2016
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.