Risk Evaluation for Maxi Horizontal Directional Drilling Crossing Projects

Publication: Journal of Pipeline Systems Engineering and Practice
Volume 1, Issue 2

Abstract

Horizontal directional drilling (HDD) has become increasingly used for the construction of large diameter (more than 600 mm or 24 in.) pipeline projects throughout China. Due to the large investment of capital and resources, it is important to conduct a risk evaluation prior to actual construction. However, there are relatively few appropriate analyses or investigations available for such applications. This paper addresses the risk assessment for Maxi HDD projects. The combination of the fuzzy comprehensive evaluation method and analytical hierarchy process was adopted as the basic model. The corresponding risk indices were constructed considering the factors affecting the projects and based on discussions with experts who have conducted HDD crossing projects. Structured judgment matrices and membership matrices were then directly developed from the index systems, and the weight vectors, subordinated vectors, and risk values determined by the use of Matlab software. Finally, the risk level of the projects was obtained by implementing the maximum membership degree law. The synthesis of the fuzzy comprehensive evaluation method and analytical hierarchy process has been demonstrated to provide a theoretical basis for the risk evaluation and establishment of risk control measures for Maxi HDD projects.

Get full access to this article

View all available purchase options and get full access to this article.

References

Bai, H., Sadiq, R, and Najaran, H. (2008). “Condition assessment of buried pipes using hierarchical evidential reasoning model.” J. Comput. Civ. Eng., 22(2), 114–122.
Carter, J. G., White, I., and Richards, J. (2009). “Sustainability appraisal and flood risk management.” Environ. Impact. Asses. Rev., 29, 7–14.
Dey, P. K., and Ramcharan, E. K. (2008). “Analytic hierarchy process helps select site for limestone quarry expansion in Barbados.” J. Environ. Manage., 88, 1384–1395.
Hao, H., and Zong, J. F. (2007). System analysis and evaluation method, Economic Science Press, China.
Hrudey, E. J., Hrudey, S. E., and Pollard, S. J. T. (2006). “Risk management for assuring safe drinking water.” Environ. Int., 32, 948–957.
Lee, S., and Wang, J. (2008). “Integrated AHP using data mining for credit evaluation.” Proc., IIE Annual Conf. and Expo 2008, Institute of Industrial Engineers, Norcross, Ga.
Li, G. L., Ruan, C. F., and Xu, C. (2007). Forecasting and decision methods in economics, Tsinghua Press, China.
Li, X. D., Qiu, C. L., and Zhang, G. M. (2008). “The risk assessment model of special equipment based on F-AHP and ANN.” Proc., 4th Int. Conf. on Natural Computation (ICNC), Inst. of Elec. and Elec. Eng. Computer Society, Piscataway, N.J., 540–545.
Ma, B., and Najafi, M. (2008). “Development and applications of trenchless technology in China.” Tunn. Undergr. Space Technol., 23, 476–480.
Najafi, M., and Gokhale, S. B. (2005). “Trenchless technology: Pipeline and utility design, construction, and renewal.” McGraw-Hill, New York.
Rangone, A. (1996). “An analytical hierarchy process framework for comparing the overall performance of manufacturing departments.” International Journal of Operations and Production Management, 16(8), 104.
Saaty, T. L. (1980). The analytic hierarchy process (AHP), McGraw-Hill, New York.
Shu, W., Li, Y., and Deng, C. (2009). “Design and implementation of water environment safety risk assessment model based on AHP.” Chin. J. Sci. Instrum., 30, 1009–1013.
Su, X., Huang, K., and Yang, H. (2005). “Application of fuzzy analysis of hierarchical process FAHP in optimizing cross pipeline selection.” Journal of Oil and Gas Technology, 27(6), 801–802.
Tabesh, M., Asadiyani Yekta, A. H., and Burrows, R. (2009). “An integrated model to evaluate losses in water distribution systems.” Water Resources Management, 23(3), 477–492.
Wang, H. T., and Wang, J. Y. (2006). “Fuzzy comprehensive evaluation for construction project risks based on uncertainty AHP.” Journal of Shenzhen University Science and Engineering, 23(1), 48–53 (in Chinese).
Yang W., and Li, P. (2007). “FAHP method available to determine the pipeline crossing program.” Journal of Oil and Gas Storage and Transportation, 26(1), 44–46.

Information & Authors

Information

Published In

Go to Journal of Pipeline Systems Engineering and Practice
Journal of Pipeline Systems Engineering and Practice
Volume 1Issue 2May 2010
Pages: 91 - 97

History

Received: Jul 31, 2009
Accepted: Dec 29, 2009
Published online: Apr 15, 2010
Published in print: May 2010

Permissions

Request permissions for this article.

Authors

Affiliations

Professor and Vice Director of China-U.S. Joint Center for Trenchless R&D, College of Engineering, China Univ. of Geosciences, Wuhan 430074, People’s Republic of China (corresponding author). E-mail: [email protected]
Mohammad Najafi [email protected]
Director, Dept. of Civil Engineering, Center for Underground Infrastructure Research and Education (CUIRE), The Univ. of Texas at Arlington, Box 19308, 428 Nedderman Hall, Arlington, TX 76019-0308. E-mail: [email protected]
Graduate Student, College of Engineering, China Univ. of Geosciences, Wuhan 430074, People’s Republic of China. E-mail: shenhua720163.com
Graduate Student, College of Engineering, China Univ. of Geosciences, Wuhan 430074, People’s Republic of China. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share