Assessing Safety Risk Management Performance in Chinese Subway Construction Projects: A Multistakeholder Perspective
Publication: Journal of Management in Engineering
Volume 38, Issue 4
Abstract
The rapid development of subway projects in China presents significant safety risks to those involved. Building on the previous empirical research that identified and classified the safety risks of these projects, the aim of this paper is to assess the safety risk management performance in Chinese subway construction projects from a multistakeholder perspective. Questionnaire surveys and semistructured interviews were conducted with three hundred and ninety-nine and eight construction professionals, respectively, who worked on subway construction projects in southeast China. The results indicate that the top five areas of safety risk management performance are related to construction plan development, management of high-risk construction works, hazard identification and communication, government-related factors, and client-related factors. In contrast, the bottom five areas of safety risk management performance are related to engineering consultant-related factors, the site’s natural environment and weather conditions, regular tests, machine calibration and maintenance, site construction schedule, and construction preparedness. The relationship between this safety risk management performance and the perceived importance of each risk factor is also reported, identifying priority areas for improvements on these projects. These findings contribute new conceptual insights to the paucity of research on the safety risk management performance of Chinese subway construction projects from a multistakeholder perspective. The results also provide new practical insights for policymakers and project managers to help them develop more effective and focused strategies to further improve the safety performance of these major projects.
Get full access to this article
View all available purchase options and get full access to this article.
Data Availability Statement
Some or all data, models, or code that support the findings of this study are available from the corresponding author on reasonable request.
Acknowledgments
This research received partial financial support from the Priority Academic Program Development of Jiangsu Higher Education Institutions. This paper forms part of an investigation into the safety of Chinese subway construction projects, from which other results were produced in an independent paper with different scope/objectives; however, they share a common background and methodology.
References
Biggs, H. C., D. P. Dingsdags, V. L. Sheahan, and N. J. Stenson. 2005. “The role of collaboration in defining and maintaining a safety culture: Australian perspectives in the construction sector.” In Vol. 1 of Proc., 21st Annual ARCOM Conf., edited by F. Khosrowshahi, 137–146. London: Association of Researchers in Construction Management.
Ceric, A. 2014. “Strategies for minimizing information asymmetries in construction projects: Project managers’ perceptions.” J. Bus. Econ. Manage. 15 (3): 424–440. https://doi.org/10.3846/16111699.2012.720601.
China Association of Metros. 2020. “Statistic and analysis report of metro system in 2019.” [In Chinese.] China Assoc. Metros Inf. 25: 1–54.
Couper, M. P. 2000. “Web surveys: A review of issues and approaches.” Public Opin. Q. 64 (4): 464–494. https://doi.org/10.1086/318641.
Deng, X., Q. Li, and Z. Zhou. 2010. “Statistical analysis on subway construction safety accidents regularity.” [In Chinese.] Stat. Decis. Making 309: 87–89.
Ding, L. Y., X. Wu, H. Luo, and F. Fu. 2011. “Research on standard for construction safety assessment of metro engineering.” [In Chinese.] China Civ. Eng. J. 44 (11): 121–127.
Ding, L. Y., H. L. Yu, H. Li, C. Zhou, X. G. Wu, and M. H. Yu. 2012. “Safety risk identification system for metro construction on the basis of construction drawings.” Autom. Constr. 27 (Nov): 120–137. https://doi.org/10.1016/j.autcon.2012.05.010.
Ding, L. Y., L. Zhang, X. Wu, M. J. Skibniewski, and Y. Qunzhou. 2014. “Safety management in tunnel construction: Case study of Wuhan metro construction in China.” Saf. Sci. 62: 8–15.
Ding, L. Y., and C. Zhou. 2013. “Development of web-based system for safety risk early warning in urban metro construction.” Autom. Constr. 34 (Sep): 45–55. https://doi.org/10.1016/j.autcon.2012.11.001.
Ding, L. Y., C. Zhou, Q. X. Deng, H. B. Luo, X. W. Ye, Y. Q. Ni, and P. Guo. 2013. “Real-time safety early warning system for cross passage construction in Yangtze Riverbed Metro Tunnel based on the internet of things.” Autom. Constr. 36 (Dec): 25–37. https://doi.org/10.1016/j.autcon.2013.08.017.
Fang, Q., and L. Chen. 2019. “Understanding the role of Jianli in China: Practice perspective.” J. Civ. Eng. Educ. 145 (3): 05019004. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000414.
Finstad, K. 2010. “Response interpolation and scale sensitivity: Evidence against 5-point scales.” J. Usability Stud. 5 (3): 104–110.
Galvin, R. 2015. “How many interviews are enough? Do qualitative interviews in building energy consumption research produce reliable knowledge?” J. Build. Eng. 1 (Mar): 2–12. https://doi.org/10.1016/j.jobe.2014.12.001.
Garrett, J. W., and J. Teizer. 2009. “Human factors analysis classification system relating to human error awareness taxonomy in construction safety.” J. Constr. Eng. Manage. 135 (8): 754–763. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000034.
George, D., and P. Mallery. 2003. SPSS for windows step by step: A simple guide and reference. 11.0 update. 4th ed. Boston: Allyn and Bacon.
Han, S. U., F. Saba, S. H. Lee, Y. Mohamed, and F. Peña-Mora. 2014. “Toward an understanding of the impact of production pressure on safety performance in construction operations.” Accid. Anal. Prev. 68 (Jul): 106–116. https://doi.org/10.1016/j.aap.2013.10.007.
He, L., P. Qiu, J. Shi, and J. Liu. 2020. “Statistical analysis on the type of safety risks and accident characteristics.” [In Chinese.] J. Saf. Sci. Technol. 16 (special issue): 130–134.
Hinze, J., C. Pedersen, and J. Fredley. 1998. “Identifying root causes of construction injuries.” J. Constr. Eng. Manage. 124 (1): 67–71. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:1(67).
Jia, A. Y., S. Rowlinson, M. Loosemore, D. Gilbert, and M. Ciccarelli. 2019. “Institutional logics of processing safety in production: The case of heat stress management in a megaproject in Australia.” Saf. Sci. 120 (12): 388–401. https://doi.org/10.1016/j.ssci.2019.07.004.
Jin, H., C. Zhang, X. Ma, Q. Zhong, F. Wu, and J. Li. 2010. “Development of safety risk technical management system of urban rail transit.” [In Chinese.] Urban Rapid Rail Transit 23 (1): 34–37.
Kartam, N. A., I. Flood, and P. Koushki. 2000. “Construction safety in Kuwait: Issues, procedures, problems, and recommendations.” Saf. Sci. 36 (3): 163–184. https://doi.org/10.1016/S0925-7535(00)00041-2.
Langdon, R. R., and S. Sawang. 2018. “Construction workers’ well-being: What leads to depression, anxiety, and stress?” J. Constr. Eng. Manage. 144 (2): 04017100. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001406.
Li, M., H. Yu, H. Jin, and P. Liu. 2018. “Methodologies of safety risk control for China’s metro construction based on BIM.” Saf. Sci. 110 (Dec): 418–426. https://doi.org/10.1016/j.ssci.2018.03.026.
Li, Y., Y. Han, M. Luo, and Y. Zhang. 2019. “Impact of megaproject governance on project performance: Dynamic governance of the Nanning Transportation Hub in China.” J. Manage. Eng. 35 (3): 05019002. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000681.
Lingard, H. 2004. “Work and family sources of burnout in the Australian engineering profession: Comparison of respondents in dual- and single-earner couples, parents, and nonparents.” J. Constr. Eng. Manage. 130 (2): 290–298. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:2(290).
Lingard, H., and S. Rowlinson. 1997. “Behavior-based safety management in Hong Kong’s construction industry.” J. Saf. Res. 28 (4): 243–256. https://doi.org/10.1016/S0022-4375(97)00010-8.
Liu, P., Q. Li, J. Bian, L. Song, and X. Xiahou. 2018. “Using interpretative structural modeling to identify critical success factors for safety management in subway construction: A China study.” Int. J. Environ. Res. Public Health 15 (7): 1359. https://doi.org/10.3390/ijerph15071359.
Liu, W., Z. Yang, D. Liu, S. Zhai, and D. Zeng. 2021. “Cluster analysis of subway safety accidents in subway construction projects.” [In Chinese.] Sci. Technol. Eng. 21 (7): 2982–2988.
Loosemore, M. 1998. “The psychology of accident prevention in the construction industry.” J. Manage. Eng. 14 (3): 50–56. https://doi.org/10.1061/(ASCE)0742-597X(1998)14:3(50).
Loosemore, M., and E. Cheung. 2015. “Implementing systems thinking to manage risk in public private partnership projects.” Int. J. Project Manage. 33 (6): 1325–1334. https://doi.org/10.1016/j.ijproman.2015.02.005.
Loosemore, M., F. Ling, and B. Lim. 2018. “A comparison of corporate social responsibility practices in the Singapore, Australia and New Zealand construction industries.” J. Cleaner Prod. 190 (20): 149–159. https://doi.org/10.1016/j.jclepro.2018.04.157.
Loosemore, M., and J. McCarthey. 2008. “Risk perceptions in construction supply chains.” J. Civ. Eng. Educ. 134 (1): 95–105. https://doi.org/10.1061/(ASCE)1052-3928(2008)134:1(95).
Loosemore, M., J. Raftery, C. Reilly, and D. Higgon. 2005. Risk management in projects. 2nd ed. London: Spon Press.
Lu, Y., Q. Li, and W. Xiao. 2013. “Case-based reasoning for automated safety risk analysis on subway operation: Case representation and retrieval.” Saf. Sci. 57 (Aug): 75–81. https://doi.org/10.1016/j.ssci.2013.01.020.
Martilla, J. A., and J. C. James. 1977. “Importance-performance analysis.” J. Market. 41 (1): 77–79. https://doi.org/10.1177/002224297704100112.
MOHURD (Ministry of Housing and Urban-Rural Development of China). 2008. “Emergency notice on further strengthening the safety management of subway construction (Construction Quality [2008] NO. 118).” Accessed April 23, 2022. https://www.mohurd.gov.cn/gongkai/fdzdgknr/tzgg/200811/20081120_180211.html.
MOHURD (Ministry of Housing and Urban-Rural Development of China). 2010. “Interim measures for safety and quality management of urban rail transit project (Construction Quality [2010] NO. 5).” Accessed June 26, 2020. http://www.mohurd.gov.cn/wjfb/201001/t20100119_199326.html.
MOHURD (Ministry of Housing and Urban-Rural Development of China). 2018. “Safety management regulation on risky construction works.” Accessed June 26, 2020. http://www.gov.cn:8080/gongbao/content/2018/content_5294422.htm.
MOHURD (Ministry of Housing and Urban-Rural Development of China) and AQSIQ (General Administration of Quality Supervision, Inspection and Quarantine of China). 2011. Code of project management for urban rail transit construction. GB 50722-2011. Beijing: China Architectural and Building Press.
Nabi, M. A. N., and I. H. El-adaway. 2021. “Understanding the key risks affecting cost and schedule performance of modular construction projects.” J. Manage. Eng. 37 (4): 04021023. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000917.
Ogunlana, S., and P. Dey. 2019. Risk management in engineering and construction. London: Routledge.
Oppong, G. D., A. P. C. Chan, E. E. Ameyaw, S. Frimpong, and A. Dansoh. 2021. “Fuzzy evaluation of the factors contributing to the success of external stakeholder management in construction.” J. Constr. Eng. Manage. 147 (11): 04021142. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002155.
Pereira, E., S. Ahn, S. Han, and S. Abourizk. 2020. “Finding causal paths between safety management system factors and accident precursors.” J. Manage. Eng. 36 (2): 04019049. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000738.
Qian, Q., and P. Lin. 2016. “Safety risk management of underground engineering in China: Progress, challenges and strategies.” J. Rock Mech. Geotech. Eng. 8 (4): 423–442. https://doi.org/10.1016/j.jrmge.2016.04.001.
Qiu, J., Y. Qin, Z. Feng, L. Wang, and K. Wang. 2020. “Safety risks and protection measures for city wall during construction and operation of Xi’an Metro.” J. Perform. Constr. Facil. 34 (2): 04020003. https://doi.org/10.1061/(ASCE)CF.1943-5509.0001374.
Rubin, A., and E. R. Babbie. 2008. Research methods for social work. Belmont, CA: Thomson Brooks/Cole.
Safe Work Australia. 2015. Work health and safety perceptions: Construction industry. Canberra, Australia: Safe Work Australia.
Saurin, T. A., C. T. Formoso, and L. B. M. Guimaraes. 2004. “Safety and production: An integrated planning and control model.” Construct. Manage. Econ. 22 (2): 159–169. https://doi.org/10.1080/0144619042000201367.
Song, Q., S. Wang, J. Wu, and L. Gui. 2019. “Analysis on the progress delay in Chinese subway construction projects.” [In Chinese.] Project Manage. Technol. 17 (11): 125–130.
Sun, Y., D. Fang, S. Wang, M. Dai, and X. Lv. 2008. “Safety risk identification and assessment for Beijing Olympic venues construction.” J. Manage. Eng. 24 (1): 40–47. https://doi.org/10.1061/(ASCE)0742-597X(2008)24:1(40).
Taherdoost, H. 2019. “What is the best response scale for survey and questionnaire design; Review of different lengths of rating scale/ attitude scale/Likert scale.” Int. J. Acad. Res. Manage. 8 (1): 1–10.
Tai, S., Y. Wang, and C. J. Anumba. 2009. “A survey on communications in large-scale construction projects in China.” Eng. Constr. Archit. Manage. 16 (2): 136–149. https://doi.org/10.1108/09699980910938019.
Toole, T. M. 2002. “Construction site safety roles.” J. Constr. Eng. Manage. 128 (3): 203–210. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:3(203).
Wang, X., N. Xia, Z. Zhang, C. Wu, and B. Liu. 2017. “Human safety risks and their interactions in China’s subways: Stakeholder perspectives.” J. Manage. Eng. 33 (5): 05017004. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000544.
Wu, X., K. Wu, M. Shen, Y. Chen, and L. Zhang. 2016. “Research on coupling of safety risks in metro construction based on N-K model.” [In Chinese.] China Saf. Sci. J. 26 (4): 96–101.
Wu, X., T. Zeng, L. Zhang, and R. Song. 2013. “Research on safety management of adjacent underground pipelines in metro construction.” [In Chinese.] J. Railway Eng. Soc. 9 (180): 127–132.
Xing, H., F. Xiong, and J. Wu. 2016. “Effects of pit excavation on an existing subway station and preventive measures.” J. Perform. Constr. Facil. 30 (6): 04016063. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000919.
Xing, X., B. Zhong, H. Luo, H. Li, and H. Wu. 2019. “Ontology for safety risk identification in metro construction.” Comput. Ind. 109 (Aug): 14–30. https://doi.org/10.1016/j.compind.2019.04.001.
Yan, H., C. Gao, H. Elzarka, K. Mostafa, and W. Tang. 2019. “Risk assessment for construction of urban rail transit projects.” Saf. Sci. 118 (Oct): 583–594. https://doi.org/10.1016/j.ssci.2019.05.042.
Yang, L., J. Lou, and X. Zhao. 2021. “Risk response of complex projects: Risk association network method.” J. Manage. Eng. 37 (4): 05021004. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000916.
Yu, H., Y. Peng, L. Zhang, R. Wang, and Q. Wang. 2019. “Statistical analysis on urban metro accidents during construction period.” [In Chinese.] Chin. J. Underground Space Eng. 15: 852–860.
Yu, Q. Z., L. Y. Ding, C. Zhou, and H. B. Luo. 2014. “Analysis of factors influencing safety management for metro construction in China.” Accid. Anal. Prev. 68 (Jul): 131–138. https://doi.org/10.1016/j.aap.2013.07.016.
Zhang, L., M. J. Skibniewski, X. Wu, Y. Chen, and Q. Deng. 2014. “A probabilistic approach for safety risk analysis in metro construction.” Saf. Sci. 63 (Mar): 8–17. https://doi.org/10.1016/j.ssci.2013.10.016.
Zhang, Q., B. L. Oo, and B. T. H. Lim. 2021. “Mapping perceptions and implementation of corporate social responsibility for construction firms via importance-performance analysis: Paths of improvement.” J. Manage. Eng. 37 (6): 04021061. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000954.
Zhang, S., C. Shang, C. Wang, R. Song, and X. Wang. 2019. “Real-time safety risk identification model during metro construction adjacent to buildings.” J. Constr. Eng. Manage. 145 (6): 04019034. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001657.
Zhang, S., R. Y. Sunindijo, M. Loosemore, S. Wang, Y. Gu, and H. Li. 2020. “Identifying critical factors influencing the safety of Chinese subway construction projects.” Eng. Constr. Archit. Manage. https://doi.org/10.1108/ECAM-07-2020-0525.
Zhang, Y., L. Zheng, and H. Liu. 2018. “Developing professional integrity indicators for chief supervision engineers in China.” J. Civ. Eng. Educ. 144 (4): 04018008. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000380.
Zhou, H., Y. Zhao, Q. Shen, L. Yang, and H. Cai. 2020. “Risk assessment and management via multi-source information fusion for undersea tunnel construction.” Autom. Constr. 111 (Mar): 103050. https://doi.org/10.1016/j.autcon.2019.103050.
Zhou, X. H., S. L. Shen, Y. S. Xu, and A. N. Zhou. 2019a. “Analysis of production safety in the construction industry of China in 2018.” Sustainability 11 (17): 4537. https://doi.org/10.3390/su11174537.
Zhou, Y., L. Y. Ding, and L. J. Chen. 2013. “Application of 4D visualization technology for safety management in metro construction.” Autom. Constr. 34 (Sep): 25–36. https://doi.org/10.1016/j.autcon.2012.10.011.
Zhou, Y., S. Li, C. Zhou, and H. Luo. 2019b. “Intelligent approach based on random forest for safety prediction of deep foundation pit in subway stations.” J. Comput. Civ. Eng. 33 (1): 05018004. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000796.
Zhou, Y., W. Su, L. Ding, H. Luo, and P. E. D. Love. 2017. “Predicting safety risks in deep foundation pits in subway infrastructure projects: Support vector machine approach.” J. Comput. Civ. Eng. 31 (5): 04017052. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000700.
Zhou, Z., Y. M. Goh, and Q. Li. 2015a. “Overview and analysis of safety management studies in the construction industry.” Saf. Sci. 72 (Feb): 337–350. https://doi.org/10.1016/j.ssci.2014.10.006.
Zhou, Z., and J. Irizarry. 2016. “Integrated framework of modified accident energy release model and network theory to explore the full complexity of the Hangzhou subway construction collapse.” J. Manage. Eng. 32 (5): 05016013. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000431.
Zhou, Z., J. Irizarry, Q. Li, and W. Wu. 2015b. “Using grounded theory methodology to explore the information of precursors based on subway construction incidents.” J. Manage. Eng. 31 (2): 04014030. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000226.
Zhou, Z., Q. Li, X. Deng, and Y. Cai. 2009. “Analysis of metro collapse accidents based on accident mechanism and management factors with the collapse of Hangzhou Metro as an example.” [In Chinese.] China Saf. Sci. J. 19 (9): 139–145.
Zhou, Z., Q. Li, and W. Wu. 2012. “Developing a versatile subway construction incident database for safety management.” J. Constr. Eng. Manage. 138 (10): 1169–1180. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000518.
Zou, P. X. W., and J. Li. 2010. “Risk identification and assessment in subway projects: Case study of Nanjing Subway Line 2.” Construct. Manage. Econ. 28 (12): 1219–1238. https://doi.org/10.1080/01446193.2010.519781.
Information & Authors
Information
Published In
Copyright
© 2022 American Society of Civil Engineers.
History
Received: Aug 20, 2021
Accepted: Mar 10, 2022
Published online: Apr 30, 2022
Published in print: Jul 1, 2022
Discussion open until: Sep 30, 2022
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.
Cited by
- Yutong Xue, Yun Le, Kaiwen Jiang, Xueqing Gan, Collaborative Management Framework for Interorganizational Risk in Megaprojects Based on Metanetwork, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-6073, 40, 5, (2024).
- Pengcheng Xiang, Yingliu Yang, Kesheng Yan, Lianghai Jin, Identification of Key Safety Risk Factors and Coupling Paths in Mega Construction Projects, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5926, 40, 4, (2024).
- Haonan Qi, Zhipeng Zhou, Javier Irizarry, Dong Lin, Haoyu Zhang, Nan Li, Jianqiang Cui, Automatic Identification of Causal Factors from Fall-Related Accident Investigation Reports Using Machine Learning and Ensemble Learning Approaches, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5485, 40, 1, (2024).
- Harrison E. Mutikanga, Muzafalu Kayondo, Chad S. Akita, Performance of Chinese International Contractors in Sub-Saharan Africa: Evidence from Uganda, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5167, 39, 3, (2023).