Explaining the Ineffectiveness of Construction Arbitration

Publication: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Volume 14, Issue 2

Abstract

The ineffectiveness of dispute resolution remains a major concern to many users of construction arbitration. Despite several complaints regarding high costs, delays, and rejected awards, there is no evidence that any studies have systematically investigated and explained the ineffectiveness of construction arbitration. This multiple qualitative case study aimed at addressing this research gap. Rich qualitative data based on 13 semistructured interviews and documentary analysis in five exemplifying cases indicated that all five cases were ineffective because of poor-quality awards, time inefficiencies, and cost ineffectiveness. Such ineffectiveness was attributed to unfavorable outcomes, which were perceived to be unfair in cases in which tribunals did not exercise their powers in balancing process control that was skewed in favor of the winning parties. The findings also pointed toward mismatches between case complexity and the competence of the tribunals, whose limited functional skills restricted their ability to properly guide the disputants on efficient approaches to the presentation of evidence. These findings provide a nuanced understanding of how these factors collectively interact in explaining the ineffectiveness of construction arbitration.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or code generated or used during the study are available in a repository online in accordance with funder data retention policies. Additional data (Appendix 1) is available in Mendeley Datasets (https://data.mendeley.com/datasets/gtvmtks233/3; doi: https://doi.org/10.17632/gtvmtks233.3).

Acknowledgments

The authors would like to thank the Jomo Kenyatta University of Agriculture and Technology for partially funding this study.

References

Works Cited

Abdul-Malak, M.-A. U., and M. H. Senan. 2020. “Operational mechanisms and effectiveness of adjudication as a key step in construction dispute resolution.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (1): 04519051. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000365.
Abwunza, A. A. 2020. “Influence of fairness perceptions on cooperative behaviour in construction arbitration.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (4): 04520033. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000422.
Abwunza, A. A., T. K. Peter, and K. Muigua. 2019. “Effectiveness of arbitration in contractual disputes: Tension between procedural efficiency and award quality.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 11 (2): 04519003. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000290.
Abwunza, A. A., T. K. Peter, and K. Muigua. 2020. “Explaining delays in construction arbitration: A process-control model approach.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (2): 04520003. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000371.
Abwunza, A. A., T. K. Peter, and K. Muigua. 2021a. “Explaining the effectiveness of construction arbitration: An organizational justice perspective.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 13 (3): 04521017. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000479.
Abwunza, A. A., T. K. Peter, and K. Muigua. 2021b. “Explaining time performance of construction arbitration.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 13 (2): 04521001. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000460.
Adams, J. S. 1965. “Inequity in social exchange.” Adv. Exp. Soc. Psychol. 2 (Jan): 267–299. https://doi.org/10.1016/S0065-2601(08)60108-2.
Aibinu, A. A. 2006. “The relationship between distribution of control, fairness and potential for dispute in the claims handling process.” Construct. Manage. Econ. 24 (1): 45–54. https://doi.org/10.1080/14697010500226954.
Aibinu, A. A., F. Y. Y. Ling, and G. Ofori. 2011. “Structural equation modelling of organizational justice and cooperative behaviour in the construction project claims process: Contractors’ perspectives.” Construct. Manage. Econ. 29 (5): 463–481. https://doi.org/10.1080/01446193.2011.564195.
Aibinu, A. A., G. Ofori, and F. Y. Ling. 2008. “Explaining cooperative behavior in building and civil engineering projects’ claims process: Interactive effects of outcome favorability and procedural fairness.” J. Constr. Eng. Manage. 134 (9): 681–691. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:9(681).
Al-Humaidi, H. M. 2014. “Arbitration in Kuwait: Study of current practices and suggestions for improvements.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 6 (1): 03013001. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000128.
Arif, F., and F. Saeed. 2021. “Role of construction project documentation for effective arbitration process.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 13 (2): 04521006. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000466.
Bates, A. 2012. “Controlling time and cost in arbitration: Actively managing the process and ‘right-sizing’ discovery.” Dispute Resolut. J. 67 (3): 54–60.
Besaiso, H., P. Fenn, and M. Emsley. 2018. “Evolution of construction arbitration.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 10 (2): 04518001. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000248.
Bies, R. J., and J. S. Moag. 1986. “Interactional justice: Communication criteria of fairness.” In Research on negotiation in organizations, edited by R. J. Lewicki, B. H. Sheppard, and M. H. Bazerman, 43–55. Greenwich, CT: JAI Press.
Blau, P. M. 1964. Exchange and power in social life. New York: Wiley.
Brockner, J., and B. M. Wiesenfeld. 1996. “An integrative framework for explaining reactions to decisions: Interactive effects of outcomes and procedures.” Psychol. Bull. 120 (2): 189–208. https://doi.org/10.1037/0033-2909.120.2.189.
Brooker, P., and A. Lavers. 1997. “Perceptions of alternative dispute resolution as constraints upon its use in the UK construction industry.” Construct. Manage. Econ. 15 (6): 519–526. https://doi.org/10.1080/014461997372728.
Bryman, A. 2016. Social research methods. 5th ed. Oxford: Oxford University Press.
Burch, T. V. 2010. “Manifest disregard and the imperfect procedural justice of arbitration.” Kansas Law Rev. 59 (1): 47–83. https://doi.org/10.17161/1808.20159.
Chan, P. W. 2020. “Revisiting basics: Theoretically-grounded interesting research that addresses challenges that matter.” Construct. Manage. Econ. 38 (1): 1–10. https://doi.org/10.1080/01446193.2019.1702251.
Chaphalkar, N. B., K. C. Iyer, and S. K. Patil. 2015. “Prediction of outcome of construction dispute claims using multilayer perceptron neural network model.” Int. J. Project Manage. 33 (8): 1827–1835. https://doi.org/10.1016/j.ijproman.2015.09.002.
Cheung, S. O., H. C. H. Suen, and T. I. Lam. 2002. “Fundamentals of alternative dispute resolution processes in construction.” J. Constr. Eng. Manage. 128 (5): 409–417. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:5(409).
Cheung, S. O., C. M. Tam, I. Ndekugri, and F. C. Harris. 2000. “Factors affecting clients’ project dispute resolution satisfaction in Hong Kong.” Construct. Manage. Econ. 18 (3): 281–294. https://doi.org/10.1080/014461900370654.
Cheung, S. O., T. W. Yiu, and H. W. Chan. 2010. “Exploring the potential for predicting project dispute resolution satisfaction using logistic regression.” J. Constr. Eng. Manage. 136 (5): 508–517. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000157.
Choi, S. J., J. E. Fisch, and A. C. Pritchard. 2014. “The influence of arbitrator background and representation on arbitration outcomes.” Virginia Law Bus. Rev. 9 (1): 43–90. https://doi.org/10.2139/ssrn.2109712.
Colquitt, J. A. 2001. “On the dimensionality of organizational justice: A construct validation of a measure.” J. Appl. Psychol. 86 (3): 386–400. https://doi.org/10.1037/0021-9010.86.3.386.
Colquitt, J. A., D. E. Conlon, M. J. Wesson, C. O. L. H. Porter, and K. Y. Ng. 2001. “Justice at the millennium: A meta-analytic review of 25 years of organizational justice research.” J. Appl. Psychol. 86 (3): 425–445. https://doi.org/10.1037/0021-9010.86.3.425.
Colquitt, J. A., B. A. Scott, J. B. Rodell, D. M. Long, C. P. Zapata, D. E. Conlon, and M. J. Wesson. 2013. “Justice at the millennium, a decade later: A meta-analytic test of social exchange and affect-based perspectives.” J. Appl. Psychol. 98 (2): 199–236. https://doi.org/10.1037/a0031757.
Colquitt, J. A., and K. P. Zipay. 2015. “Justice, fairness, and employee reactions.” Ann. Rev. Organ. Psychol. Organ. Behav. 2 (1): 75–99. https://doi.org/10.1146/annurev-orgpsych-032414-111457.
Cresswell, P. 2013. “The future of arbitration in the changing world of dispute resolution.” Arbitration 79 (3): 285–294.
Davison, M., and L. Nowak. 2009. “International arbitration: How Can it deliver on its promise?” Arbitration 75 (2): 163–168.
El-Adaway, I. H., A. S. Ezeldin, and J. K. Yates. 2009. “Arbitral tribunal proceedings case study: Egyptian large-scale construction project.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 1 (3): 147–153. https://doi.org/10.1061/(ASCE)1943-4162(2009)1:3(147).
Ennis, C. 2013. “Experts: When they should be brought in and how they can best save time and cost: Presentation at the chartered institute of arbitrators London branch construction seminar, ‘Cost-effective dispute resolution in construction: Managing experts, lawyers and the tribunal.” Arbitration 79 (1): 80–88.
Fahy, C. 2012. “Dispute resolution in the Irish construction industry: Future trends.” Arbitration 78 (2): 163–170.
Folger, R., and R. Cropanzano. 2001. “Fairness theory: Justice as accountability.” In Advances in organizational justice, edited by J. Greenberg and R. Cropanzano, 1–55. Stanford, UK: Stanford University Press.
Fortese, F., and L. Hemmi. 2015. “Procedural fairness and efficiency in international arbitration.” Groningen J. Int. Law 3 (1): 110–124. https://doi.org/10.21827/5a86a89d8e651.
Gebken, R. J., II. 2006. “Quantification of transactional dispute resolution costs for the US construction industry.” Ph.D. dissertation, Faculty of the Graduate School, Univ. of Texas at Austin.
Giorgetti, C. 2013. “Is the truth in the eyes of the beholder? The Perils and benefits of empirical research in international investment arbitration.” Santa Clara J. Int. Law 12 (1): 263–275.
Goldman, B., and R. Cropanzano. 2015. “Justice’ and ‘fairness’ are not the same thing.” J. Organ. Behav. 36 (2): 313–318. https://doi.org/10.1002/job.1956.
Gross, J. I., and B. Black. 2008. “When perception changes reality: An empirical study of investors’ views of the fairness of securities arbitration.” J. Dispute Resolut. 2008 (2): 349–410.
Hacking, L. 2011. “Arbitration is only as good as its arbitrators.” In International arbitration and international commercial law: Synergy, convergence and evolution, edited by S. Kröll, L. A. Mistelis, P. P. Viscasillas, and V. Rogers, 223–230. Alphen aan den Rijn, Netherlands: Kluwer Law International.
Hansen, S. 2019. “Challenging arbitral awards in the construction industry: Case study of infrastructure disputes.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 11 (1): 06518004. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000281.
Harmon, K. M. 2004. “Cost-effective strategies for arbitration.” Leadersh. Manage. Eng. 4 (4): 148–153. https://doi.org/10.1061/(ASCE)1532-6748(2004)4:4(148).
Hinchey, J. 2012. “Dispute resolution.” In Managing Gigaprojects: Advice from those who’ve been there, done that, edited by P. D. Galloway, K. R. Nielsen, and J. L. Dignum, 229–261. Reston, VA: ASCE.
Hinchey, J. W., and J. H. Perry. 2008. “Perspective from the United States: Tensions between ‘Getting It Done’ and ‘getting it right’.” J. Civ. Eng. Educ. 134 (2): 231–239. https://doi.org/10.1061/(ASCE)1052-3928(2008)134:2(231).
Hobbs, J. D. 1999. “Is arbitration all it’s cracked up to be?” J. Manage. Eng. 15 (6): 20–22. https://doi.org/10.1061/(ASCE)0742-597X(1999)15:6(5.
Jones, D. 2012. “Techniques in managing the process of arbitration.” Arbitration 78 (2): 140–151.
Kadefors, A. 2005. “Fairness in interorganizational project relations: Norms and strategies.” Construct. Manage. Econ. 23 (8): 871–878. https://doi.org/10.1080/01446190500184238.
Kangari, R. 1995. “Construction documentation in arbitration.” J. Constr. Eng. Manage. 121 (2): 201–208. https://doi.org/10.1061/(ASCE)0733-9364(1995)121:2(201).
Kazemi, A., K. Törnblom, and G. Mikula. 2015. “Justice: Social psychological perspectives.” In Vol. 12 of International encyclopedia of the social & behavioral sciences. 2nd ed., edited by J. D. Wright, 949–955. Oxford: Elsevier.
Lee, C. K. 2017. “Decision making in alternative dispute resolution (ADR) use in construction projects: A planned behaviour approach.” Ph.D. thesis, Dept. of Civil and Environmental Engineering, Univ. of Auckland.
Lee, C. K., T. W. Yiu, and S. O. Cheung. 2016. “Selection and use of alternative dispute resolution (ADR) in construction projects—Past and future research.” Int. J. Project Manage. 34 (3): 494–507. https://doi.org/10.1016/j.ijproman.2015.12.008.
Li, A., and R. Cropanzano. 2009. “Fairness at the group level: Justice climate and intraunit justice climate.” J. Manage. 35 (3): 564–599. https://doi.org/10.1177/0149206308330557.
Li, A., R. Cropanzano, and J. Bagger. 2013. “Justice climate and peer justice climate: A closer look.” Small Group Res. 44 (5): 563–592. https://doi.org/10.1177/1046496413498119.
Li, A., R. S. Cropanzano, and A. Molina. 2015. “Fairness at the unit level: Justice climate, justice climate strength, and peer justice.” In The Oxford handbook of justice in the workplace, edited by R. S. Cropanzano and M. L. Ambrose, 137–164. New York: Oxford University Press.
Lim, B. T. H., and M. Loosemore. 2017. “The effect of inter-organizational justice perceptions on organizational citizenship behaviors in construction projects.” Int. J. Project Manage. 35 (2): 95–106. https://doi.org/10.1016/j.ijproman.2016.10.016.
Lind, E. A., and T. R. Tyler. 1988. The social psychology of procedural justice. New York: Springer.
Loosemore, M., and B. Lim. 2015. “Inter-organizational unfairness in the construction industry.” Construct. Manage. Econ. 33 (4): 310–326. https://doi.org/10.1080/01446193.2015.1057193.
Loosemore, M., and B. T.-H. Lim. 2016. “Intra-organisational injustice in the construction industry.” Eng. Constr. Archit. Manage. 23 (4): 428–447. https://doi.org/10.1108/ECAM-01-2015-0005.
Lu, W., Z. Li, and S. Wang. 2017. “The role of justice for cooperation and contract’s moderating effect in construction dispute negotiation.” Eng. Constr. Archit. Manage. 24 (1): 133–153. https://doi.org/10.1108/ECAM-01-2015-0002.
Lu, W., L. Zhang, and J. Pan. 2015. “Identification and analyses of hidden transaction costs in project dispute resolutions.” Int. J. Project Manage. 33 (3): 711–718. https://doi.org/10.1016/j.ijproman.2014.08.009.
Marques, R. C. 2018. “Is arbitration the right way to settle conflicts in PPP arrangements?” J. Manage. Eng. 34 (1): 05017007. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000564.
Maxwell, J. A. 2013. Qualitative research design: An interactive approach. 3rd ed. Thousand Oaks, CA: SAGE.
Miles, M. B., A. M. Huberman, and J. Saldaña. 2014. Qualitative data analysis: A methods sourcebook. 3rd ed. Thousand Oaks, CA: SAGE.
Moza, A., and V. K. Paul. 2017. “Review of the effectiveness of arbitration.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 9 (1): 03716002. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000204.
Muigua, K. 2012. Settling disputes through arbitration in Kenya. 2nd ed. Nairobi, Kenya: Glenwood Publishers.
Naimark, R. W., and S. E. Keer. 2002. “What do parties really want from international commercial arbitration?” Dispute Resolut. J. 57 (4): 78–86.
Newmark, C. 2008. “Controlling time and costs in arbitration.” In The leading arbitrators’ guide to international arbitration. 2nd ed., edited by L. W. Newman and R. D. Hill, 81–96. New York: JurisNet LLC.
Odoe, L. O. W. 2014. “Party autonomy and enforceability of arbitration agreements and awards as the basis of arbitration.” Ph.D. thesis, School of Law, Univ. of Leicester.
Park, W. W. 2010. “Arbitrators and accuracy.” J. Int. Dispute Settlement 1 (1): 25–53. https://doi.org/10.1093/jnlids/idp004.
Park, W. W. 2011. “Arbitration in autumn.” J. Int. Dispute Settlement 2 (2): 287–315. https://doi.org/10.1093/jnlids/idr001.
Park, W. W. 2014. “A fair fight: Professional guidelines in international arbitration.” Arbitration Int. 30 (3): 409–428. https://doi.org/10.1093/arbitration/30.3.409.
Patil, S. K., K. C. Iyer, and N. B. Chaphalkar. 2019. “Influence of extrinsic factors on construction arbitrators’ decision making.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 11 (4): 04519021. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000318.
Redmond, J. 2016. “How to deal with multi-party arbitrations.” In Vol. 2016 of The resolver 2016, 14. London: Chartered Institute of Arbitrators.
Risse, J. 2013. “Ten drastic proposals for saving time and costs in arbitral proceedings.” Arbitration Int. 29 (3): 453–466. https://doi.org/10.1093/arbitration/29.3.453.
Rivkin, D. W., and S. J. Rowe. 2015. “The role of the tribunal in controlling arbitral costs.” Arbitration 81 (2): 116–130.
Rupp, D. E., D. L. Shapiro, R. Folger, D. P. Skarlicki, and R. Shao. 2017. “A critical analysis of the conceptualization and measurement of organizational justice: Is it time for reassessment?” Acad. Manage. Ann. 11 (2): 919–959. https://doi.org/10.5465/annals.2014.0051.
Seifert, B. M. 2005. “International construction dispute adjudication under international federation of consulting engineers conditions of contract and the dispute adjudication board.” J. Civ. Eng. Educ. 131 (2): 149–157. https://doi.org/10.1061/(ASCE)1052-3928(2005)131:2(149).
Shestowsky, D., and J. Brett. 2008. “Disputants’ perceptions of dispute resolution procedures: An ex ante and ex post longitudinal empirical study.” Connecticut Law Rev. 41 (1): 63–107. https://doi.org/10.2139/ssrn.1103585.
Sinha, A. K., and K. N. Jha. 2020. “Dispute resolution and litigation in PPP road projects: Evidence from select cases.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (1): 05019007. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000336.
SPIDR (Society of Professionals in Dispute Resolution) Commission on Qualification. 1989. “Qualifying neutrals: The basic principle.” Accessed September 8, 2017. https://www.acrnet.org/ACR/Resources/SPIDR_Documents/ACR/Resources/SPIDR_Documents.aspx?hkey=3f62c96f-6f1e-4573-a07a-08bdf7001a98.
Stipanowich, T. J. 1988. “Rethinking American arbitration.” Indiana Law J. 63 (3): 425–487.
Stipanowich, T. J. 2010. “Arbitration: The ‘New Litigation’.” Univ. Illinois Law Rev. 2010 (1): 1–60.
Stipanowich, T. J., C. E. Kann, D. Rothman, and The College of Commercial Arbitrators. 2010. “Protocols for expeditious, cost-effective commercial arbitration: Key action steps for business users, counsel, arbitrators & arbitration provider institutions.” Accessed December 19, 2019. http://www.united-adr.com/policies/CCA_Protocols.pdf.
Stipanowich, T. J., and J. R. Lamare. 2014. “Living with ADR: Evolvi.ng perceptions and use of mediation, arbitration, and conflict management in fortune 1000 corporations.” Harvard Negotiation Law Rev. 19 (1): 1–68. https://doi.org/10.2139/ssrn.2221471.
Teo, E. A. L., and A. A. Aibinu. 2007. “Legal framework for alternative dispute resolution: Examination of the Singapore national legal system for arbitration.” J. Civ. Eng. Educ. 133 (2): 148–157. https://doi.org/10.1061/(ASCE)1052-3928(2007)133:2(148).
Thibaut, J., and L. Walker. 1975. Procedural justice: A psychological analysis. Hillsdale, NJ: Erlbaum.
Thibaut, J., and L. Walker. 1978. “A theory of procedure.” Calif. Law Rev. 66 (3): 541–566. https://doi.org/10.2307/3480099.
Torgbor, E. N. A. 2013. “A comparative study of law and practice of arbitration in Kenya, Nigeria and Zimbabwe, with particular reference to current problems in Kenya.” Ph.D. thesis, Faculty of Law, Univ. of Stellenbosch.
Tyler, T. R., and S. L. Blader. 2000. Cooperation in groups: Procedural justice, social identity, and behavioural engagement. Philadelphia, PA: Psychology Press.
Watkins, T. L. 1992. “Assessing arbitrator competence: A preliminary regional survey.” Arbitration J. 47 (2): 43–48.
Welser, I. 2014. “Efficiency—Today’s challenge in arbitration proceedings.” In Austrian yearbook on international arbitration 2014, edited by C. Klausegger, P. Klein, F. Kremslehner, A. Petsche, N. Pitkowitz, J. Power, I. Welser, and G. Zeiler, 151–166. Vienna: Austrian Yearbook on International Arbitration.
Wiezel, J. P. 2011. “Cost-effective construction arbitration.” Constr. Lawyer 31 (2): 15.
Yin, R. K. 2018. Case study research and applications: Design and methods. 6th ed. Thousand Oaks, CA: SAGE.

Information & Authors

Information

Published In

Go to Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Volume 14Issue 2May 2022

History

Received: Mar 2, 2021
Accepted: Dec 17, 2021
Published online: Mar 10, 2022
Published in print: May 1, 2022
Discussion open until: Aug 10, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Lecturer, Dept. of Construction Management, Jomo Kenyatta Univ. of Agriculture and Technology, P.O. Box 62000-00200, Nairobi, Kenya (corresponding author). ORCID: https://orcid.org/0000-0002-3852-4235. Email: [email protected]
Titus K. Peter, Ph.D. [email protected]
Associate Professor, Dept. of Construction Management, Jomo Kenyatta Univ. of Agriculture and Technology, P.O. Box 62000-00200, Nairobi, Kenya. Email: [email protected]
Kariuki Muigua, Ph.D. [email protected]
Senior Lecturer, School of Law, Univ. of Nairobi, P.O. Box 30197-00100, Nairobi, Kenya. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Arbitration in Construction Project Disputes over the Last Decade: Bibliometric and Content Analysis, Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 10.1061/JLADAH.LADR-1136, 16, 4, (2024).
  • Litigation versus Judicial Arbitration as Binding Dispute Settlement Techniques in Public Construction Projects, Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 10.1061/(ASCE)LA.1943-4170.0000580, 15, 1, (2023).
  • Development of ECC for infrastructure projects, Ain Shams Engineering Journal, 10.1016/j.asej.2022.102064, (102064), (2022).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share