Managing Participants’ Behaviors: A Framework to Improve the Process Efficiency of Transport Public-Private Partnerships
Publication: Journal of Infrastructure Systems
Volume 28, Issue 1
Abstract
Public-private partnerships (PPPs) are critical for delivering infrastructure assets worldwide. They encompass a variety of public and private organizations, and therefore, participants’ behavior can significantly affect the life-cycle performance of projects. However, the extant literature shows a lack of attention to the process efficiency of PPPs from behavioral and economic perspectives. Thus, we developed a managerial framework in this study, which is pivotal to understanding and managing the relationships between participants’ behaviors and project process efficiency in PPPs. Using social network analysis, a total of two case studies of transport PPPs were undertaken to examine and refine the developed paradigm. This study expands the knowledge of the organizational management of PPPs and will be useful for enhancing project delivery through an improved management of participating organizations’ behaviors.
Get full access to this article
View all available purchase options and get full access to this article.
Data Availability Statement
Some or all data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request, i.e., data for SNA modeling and regression.
Acknowledgments
This study was supported by the Liaoning Social Science Planning Fund (L16BJY022), the Scientific Research Fund of Liaoning Provincial Department of Education (LN2020Q06), and the Humanities and Social Science Funding of the Ministry of Education of China (21YJCZH023).
References
Aibinu, A. A., and T. Pasco. 2008. “The accuracy of pre-tender building cost estimates in Australia.” Construct. Manage. Econ. 26 (12): 1257–1269. https://doi.org/10.1080/01446190802527514.
Baumeister, R. 2002. “Yielding to temptation: Self-control failure, impulsive purchasing, and consumer behavior.” J. Consum. Res. 28 (4): 670–676. https://doi.org/10.1086/338209.
Derakhshan, R., R. Turner, and M. Mancini. 2019. “Project governance and stakeholders: A literature review.” Int. J. Project Manage. 37 (1): 98–116. https://doi.org/10.1016/j.ijproman.2018.10.007.
De Schepper, S., M. Dooms, and E. Haezendonck. 2014. “Stakeholder dynamics and responsibilities in Public–Private Partnerships: A mixed experience.” Int. J. Project Manage. 32 (7): 1210–1222. https://doi.org/10.1016/j.ijproman.2014.01.006.
Dong, X., Y. Du, and X. Wu. 2018. “Efficiency advantages and incentive mechanism of PPPs: A qualitative comparative analysis under the Chinese scenario.” Adv. Civ. Eng. 2018: 6045064. https://doi.org/10.1155/2018/6045064.
EIB (European Investment Bank). 2011. The guide to guidance: How to prepare, procure and deliver PPPs. Luxembourg, UK: EIB.
Engel, E., R. Fischer, and A. Galetovic. 2013. “The basic public finance of public-private partnerships.” J. Eur. Econ. Assoc. 11 (1): 83–111. https://doi.org/10.1111/j.1542-4774.2012.01105.x.
European Commission. 2003. “Guidelines for successful PPPs.” Belgium: European Commission.
Flyvbjerg, B. 2006. “Five misunderstanding about case-study research.” Qual. Inq. 12 (2): 219–245. https://doi.org/10.1177/1077800405284363.
Freeman, L. C., S. P. Borgatti, and D. R. White. 1991. “Centrality in valued graphs: A measure of betweenness based on network flow.” Social Networks 13 (2): 141–154. https://doi.org/10.1016/0378-8733(91)90017-N.
Gerring, J., and L. Cojocaru. 2016. “Selecting cases for intensive analysis: A diversity of goals and methods.” Sociol. Methods Res. 45 (3): 392–423. https://doi.org/10.1177/0049124116631692.
Hardcastle, C., P. J. Edwards, A. Akintoye, and B. Li. 2005. “Critical success factors for PPP/PFI projects in the UK construction industry: A factor analysis approach.” Construct. Manage. Econ. 23 (5): 459–471. https://doi.org/10.1080/01446190500041537.
He, Z., D. Huang, C. Zhang, and J. Fang. 2018. “Toward a stakeholder perspective on social stability risk of large hydraulic engineering projects in China.” Sustainability 10 (4): 1223. https://doi.org/10.3390/su10041223.
HM Treasury (Her Majesty’s Treasury). 2012. A new approach to public private partnerships. London: HM Treasury.
HM Treasury (Her Majesty’s Treasury). 2013. “PFI project data: March 2013.” Accessed December 17, 2018. http://www.gov.uk/government/statistics/pfi-projects-data-march-2013.
Kivilä, J., M. Martinsuo, and L. Vuorinen. 2017. “Sustainable project management through project control in infrastructure projects.” Int. J. Project Manage. 35 (6): 1167–1183. https://doi.org/10.1016/j.ijproman.2017.02.009.
Knoke, D. 2013. “Understanding social networks: Theories, concepts, and findings.” Contemp. Sociol. J. Rev. 42 (2): 249–251. https://doi.org/10.1177/0094306113477381y.
Laan, A., H. Voordijk, and G. Dewulf. 2011. “Reducing opportunistic behaviour through a project alliance.” Int. J. Manage. Project Bus. 4 (4): 660–679. https://doi.org/10.1108/17538371111164065.
Liu, J., P. E. D. Love, J. Smith, M. Regan, and P. R. Davis. 2015. “Life-cycle critical success factors for public-private partnership infrastructure projects.” J. Manage. Eng. 31 (5): 04014073. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000307.
Liu, H. J., P. E. Love, J. Smith, Z. Irani, N. Hajli, and M. C. Sing. 2018a. “From design to operations: A process management life-cycle performance measurement system for PPPs.” Prod. Plann. Control 29 (1): 68–83. https://doi.org/10.1080/09537287.2017.1382740.
Liu, H. J., P. E. Love, J. Smith, M. C. Sing, and J. Matthews. 2018b. “Evaluation of public-private partnerships: A life-cycle performance prism for ensuring value for money.” Environ. Plann. C: Politics Space 36 (6): 1133–1153. https://doi.org/10.1177/2399654417750879.
Love, P. E. D., J. Liu, J. Matthews, C. P. Sing, and J. Smith. 2015. “Future-proofing PPPs: Life-cycle performance measurement and building information modelling.” Autom. Constr. 56 (Aug): 26–35. https://doi.org/10.1016/j.autcon.2015.04.008.
Mohamed, K. A., S. S. Khoury, and S. M. Hafez. 2011. “Contractor’s decision for bid profit reduction.” Int. J. Project Manage. 29 (1): 93–107. https://doi.org/10.1016/j.ijproman.2009.12.003.
Newcombe, R. 2003. “From client to project stakeholders: A stakeholder mapping approach.” Construct. Manage. Econ. 21 (8): 841–848. https://doi.org/10.1080/0144619032000072137.
Pollitt, C., and G. Bouckaert. 2017. Public management reform: A comparative analysis—Into the age of austerity. Oxford, UK: Oxford University Press.
Pu, W., F. Xu, R. Chen, and R. C. Marque. 2020. “PPP project procurement model selection in China: Does it matter?” Construct. Manage. Econ. 38 (2): 126–139. https://doi.org/10.1080/01446193.2019.1596291.
Raisbeck, P., C. Duffield, and M. Xu. 2010. “Comparative performance of PPPs and traditional procurement in Australia.” Construct. Manage. Econ. 28 (4): 345–359. https://doi.org/10.1080/01446190903582731.
Regan, M., J. Smith, and P. Love. 2011. “Impact of the capital market collapse on public-private partnership infrastructure projects.” J. Constr. Eng. Manage. 137 (1): 6–16. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000245.
Soomro, M., and X. Zhang. 2015. “Roles of private-sector partners in transportation public-private partnership failures.” J. Manage. Eng. 31 (4): 04014056. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000263.
Stiglitz, J. 1981. “Pareto optimality and competition.” J. Finance 36 (2): 235–251. https://doi.org/10.1111/j.1540-6261.1981.tb00437.x.
UK Treasury Committee. 2011. “Private finance initiative.” Accessed December 17, 2018. https://publications.parliament.uk/pa/cm201012/cmselect/cmtreasy/1146/114602.htm.
WA Dept. of Treasury (Western Australia Dept. of Treasury). 2015. “Public private partnerships.” Accessed September 9, 2015. http://www.treasury.wa.gov.au/Treasury/Public_Private_Partnerships.
Wu, J., H. J. Liu, M. C. Sing, R. Humphrey, and J. Zhao. 2020. “Public-private partnerships: Implications from policy changes for practice in managing risks.” Eng. Constr. Archit. Manage. 27 (9): 2253–2269. https://doi.org/10.1108/ECAM-09-2018-0400.
Wu, J., J. Liu, X. Jin, and M. Sing. 2016. “Government accountability within infrastructure public–private partnerships.” Int. J. Project Manage. 34 (8): 1471–1478. https://doi.org/10.1016/j.ijproman.2016.08.003.
Yong, H. K. 2010. Public-private partnerships policy and practice. London: Secretariat.
Yuan, J., A. Y. Zeng, M. J. Skibniewski, and Q. Li. 2009. “Selection of performance objectives and key performance indicators in PPPs to achieve value for money.” Construct. Manage. Econ. 27 (3): 253–270. https://doi.org/10.1080/01446190902748705.
Zhang, X. Q. 2004. “Concessionaire selection: Methods and criteria.” J. Constr. Eng. Manage. 130 (2): 235–244. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:2(235).
Zhang, X. Q. 2005. “Criteria for selecting the private-sector partner in public-private partnerships.” J. Constr. Eng. Manage. 131 (6): 631–644. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:6(631).
Zietlow, G. 2005. Cutting costs and improving quality through performance-based road management and maintenance contracts—The Latin American and OECD experience. Birmingham, UK: Univ. of Birmingham.
Zwikael, O., and J. Smyrk. 2015. “Project governance: Balancing control and trust in dealing with risk.” Int. J. Project Manage. 33 (4): 852–862. https://doi.org/10.1016/j.ijproman.2014.10.012.
Information & Authors
Information
Published In
Copyright
© 2021 American Society of Civil Engineers.
History
Received: Jan 10, 2021
Accepted: Sep 8, 2021
Published online: Oct 18, 2021
Published in print: Mar 1, 2022
Discussion open until: Mar 18, 2022
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.