Strategic Model to Optimize Railway-Track Renewal Operations at a Network Level
Publication: Journal of Infrastructure Systems
Volume 22, Issue 2
Abstract
This paper presents an optimization model for scheduling railway ballast, rail, and sleeper renewal operations at a network level. The objective of the model is to minimize the expected railway track life-cycle cost (LCC) and track unavailability costs derived from user impacts caused by traffic disruption during track renewal operations. To minimize costs, the model assesses the opportunistic renewal of railway track components and takes advantage of planning from a network perspective to study the possibility of reusing track components on different lines. The practical utility of the model is illustrated with a case study involving the Portuguese railway network. The results indicate that user costs have an important influence on decision making in the track renewal process and that the network perspective of renewal planning can reduce the direct costs of these operations.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
The authors would like to thank the Portuguese Railway Infrastructure Manager, REFER, E.P.E., for its support and cooperation and Henrique Oliveira from Brisa Engenharia e Gestão (BEG) for sharing his knowledge of the Lisbon-Porto line renewal project. The support of the Portuguese Foundation for Science and Technology, FCT (Project Reference PTDC/SENTRA/112975/2009), and MIT Portugal is also gratefully acknowledged. Thanks also to the software company FICO for providing the Xpress 7.2 license.
References
Andrade, A., and Teixeira, P. (2011a). “Biobjective optimization model for maintenance and renewal decisions related to rail track geometry.” Transp. Res. Rec., 2261, 163–170.
Andrade, A., and Teixeira, P. (2011b). “Uncertainty in rail-track geometry degradation: Lisbon-oporto line case study.” J. Transp. Eng., 193–200.
Bouch, C., and Roberts, C. (2010). “State of the art for European track maintenance and renewal logistics.” Proc. Inst. Mech. Eng. Part F J. Rail Rapid Transit., 224(4), 319–326.
Budai, G., Huisman, D., and Dekker, R. (2005). “Scheduling preventive railway maintenance activities.” J. Oper. Res. Soc., 57(9), 1035–1044.
Caetano, L., and Teixeira, P. (2013). “An availability approach to optimizing railway track renewal operations.” J. Transp. Eng., 941–948.
Caetano, L., and Teixeira, P. (2014). “Optimization model to schedule railway track renewal operations: A life-cycle cost approach.” Struct. Infrastruct. Eng., 11(11), 1524–1536.
Esveld, C. (2001). Modern railway track, MRT Productions, Zaltbommel, Netherlands.
Famurewa, S., Xin, T., Rantatalo, M. and Kumar, U. (2015). “Optimisation of maintenance track possession time: A tamping case study.” Proc. Inst. Mech. Eng. Part F J. Rail Rapid Transit., 229(1), 12–22.
Higgins, A. (1998). “Scheduling of railway track maintenance activities and crews.” J. Oper. Res. Soc., 49(10), 1026–1033.
Lai, Y., and Barkan, C. (2011). “Comprehensive decision support framework for strategic railway capacity planning.” J. Transp. Eng., 738–749.
Nilsson, R., and Olofsson, U. (2002). “Surface cracks and wear of rail: A full-scale test on a commuter train track.” Proc. Inst. Mech. Eng. Part F J. Rail Rapid Transit., 216(4), 249–264.
RAVE. (2008). “Terceira travessia do tejo—Análise custo-beneficio.” Lisbon, Portugal (in Portuguese).
Shyr, F., and Ben-Akiva, M. (1996). “Modeling rail fatigue behavior with multiple hazards.” J. Infrastruct. Syst., 73–82.
Stirling, A., Roberts, C., Chan, A. and Zhao, J. (2006). “Assessing the economic life of rail using a stochastic analysis of failures.” Proc. Inst. Mech. Eng. Part F J. Rail Rapid Transit., 220(2), 103–111.
Wardman, M. (2004). “Public transport values of time.” Transp. Policy, 11(4), 363–377.
World Bank. (2005). “Projects with a very long life.” Washington, DC, 5.
Xpress Optimization Suite version 7.4. [Computer software]. FICO, San Jose, CA.
Yun, W., and Ferreira, L. (2003). “Prediction of the demand of the railway sleepers: A simulation model for replacement strategies.” Int. J. Prod. Econ., 81–82, 589–595.
Zhao, J., Chan, A., and Burrow, M. (2007). “Reliability analysis and maintenance decision for railway sleepers using track condition information.” J. Oper. Res. Soc., 58(8), 1047–1055.
Zhao, J., Chan, A., and Burrow, M. (2009). “A genetic-algorithm-based approach for scheduling the renewal of railway track components.” Proc. Inst. Mech. Eng. Part F J. Rail Rapid Transit., 223(6), 533–541.
Information & Authors
Information
Published In
Copyright
© 2016 American Society of Civil Engineers.
History
Received: Mar 23, 2015
Accepted: Nov 4, 2015
Published online: Jan 20, 2016
Published in print: Jun 1, 2016
Discussion open until: Jun 20, 2016
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.