Technical Papers
Jun 21, 2013

Financial Evaluation for Toll Road Projects Considering Traffic Volume and Serviceability Interactions

Publication: Journal of Infrastructure Systems
Volume 20, Issue 3

Abstract

The rapid increase in both financial demands and the need for large and comprehensive highway infrastructure systems necessitates public authorities to muster support from the private sector. Public-private partnerships (PPP) have been increasingly adopted and cited as one of the most effective project delivery systems, which bring balance to risks and rewards between involved project participants. However, a number of PPP infrastructure projects around the world have been reported to have operating deficits and difficulties in debt-servicing. One of the major reasons for these difficulties is the unrealistic and inaccurate prediction of project investment performance during the initial stages of project viability and profitability analysis. Therefore, the research reported in this paper presents a formulation of a comprehensive framework that evaluates financial viability of PPP toll road projects. The framework utilizes a modified user-equilibrium traffic-assignment algorithm to estimate toll road traffic volume considering critical demand-influencing factors, which include travel time, pavement serviceability, and out-of-pocket user trip expenses. The proposed framework also considers the effects of the rehabilitation maintenance activities on the equilibrium flow pattern and project financial viability. This makes possible an estimation of the maintenance costs and frequency as well as an evaluation of the effects of rehabilitation programs on the traffic volume. The research reported in this paper also demonstrates the difference in traffic-flow patterns with and without interactive changes in pavement performance and traffic volume to demonstrate the need for incorporation of pavement performance and network levels of service into PPP highway project evaluation.

Get full access to this article

View all available purchase options and get full access to this article.

References

Aziz, A. M. A., and Russell, A. D. (2006). “Generalized economic modeling for infrastructure and capital investment projects.” J. Infrastruct. Syst., 18–32.
Bakatjan, S., Arikan, M., and Tiong, R. L. K. (2003). “Optimal capital structure model for BOT power projects in Turkey.” J. Constr. Eng. Manage., 89–97.
Bi, X., and Wang, X. F. (2009). “The application of fuzzy-real option theory in BOT project investment decision-making.” Proc., Int. Conf. on Industrial Engineering and Engineering Management, IEEE, New York, 289–293.
Brandao, L. E., and Saraiva, L. (2008). “The option value of government guarantees in infrastructure projects.” Constr. Manage. Econ., 26(11), 1171–1180.
Chang, L. M., and Chen, P. H. (2001). “BOT financial model: Taiwan high speed rail case.” J. Constr. Eng. Manage., 214–222.
Cheah, C., and Liu, J. (2006). “Valuing governmental support in infrastructure projects as real options using Monte Carlo simulation.” Constr. Manage. Econ., 24(5), 545–554.
Chen, A., and Subprasom, K. (2007). “Analysis of regulation and policy of private toll roads in a build-operate-transfer scheme under demand uncertainty.” Transp. Res. A Pol. Pract., 41(6), 537–558.
Chen, A., Subprasom, K., and Ji, Z.-W. (2003). “Mean-variance model for the build-operate-transfer scheme under demand uncertainty.” Transportation Research Record 1857, Transportation Research Board, Washington, DC, 93–101.
Chen, A., Subprasom, K., and Ji, Z.-W. (2006). “A simulation-based multi-objective genetic algorithm SMOGA for build-operate-transfer network design problem.” Optim. Eng. J., 7(3), 225–247.
Chiara, N., and Garvin, M. J. (2007). “Using real options for revenue risk mitigation in transportation project financing.” Transportation Research Record 1993, Transportation Research Board, Washington, DC, 1–8.
Chiara, N., Garvin, M. J., and Vecer, J. (2007). “Valuing simple multiple-exercise real options in infrastructure projects.” J. Infrastruct. Syst., 97–104.
Finnerty, J. D. (2007). Project financing: Asset-based financial engineering, 2nd Ed., John Wiley & Sons, Hoboken, NJ.
Gousios, S., Mazzenga, N. J., and Byungkyu, P. (2007). “Determining highway toll: Revenue maximization approach.” Proc., Intelligent Transportation Systems Conf., IEEE, New York, 607–612.
Irfan, M., Khurshid, M. B., Labi, S., and Flora, W. (2009). “Evaluating the costeffectiveness of flexible rehabilitation treatments using different performance criteria.” J. Transp. Eng., 753–763.
Iyer, K. C., and Sagheer, M. (2010). “Hierarchical structuring of PPP risks using interpretative structural modeling.” J. Constr. Eng. Manage., 151–159.
Jeerangsuwan, T. (2011). “Financial viability evaluation for a toll road project considering traffic volume-serviceability interactions.” M.S. thesis, Purdue Univ., West Lafayette, IN.
Jeerangsuwan, T., and Kandil, A. (2012). “Financial viability evaluation for a toll road project considering serviceability.” Proc., Int. Conf. on Construction in Developing Countries, Zakon Group, North Conway, NH, 1–9.
Khurshid, M. B., Irfan, M., and Labi, S. (2011). “An analysis of the cost-effectiveness of rigid pavement rehabilitation treatments.” Struct. Infrastruct. Eng., 7(9), 715–727.
Liu, J., and Cheah, C. (2009). “Real option application in PPP/PFI project negotiation.” Constr. Manage. Econ., 27(4), 331–342.
Ng, S. T., Xie, J. Z., Cheung, Y. K., and Jefferies, M. (2007). “A simulation model for optimizing the concession period of public private partnerships schemes.” Int. J. Proj. Manage., 25(8), 791–798.
Ock, J. H., Han, S. H., Park, H. K., and Diekmann, J. E. (2005). “Improving decision quality, a risk-based go/no-go decision for build-operate-transfer (BOT) projects.” Can. J. Civ. Eng., 32(3), 517–532.
Schaufelberger, J. E. (2005). “Risk management on build-operate-transfer projects.” Proc., Construction Research Congress, ASCE, Reston, VA, 1–10.
Sheffi, Y. (1985). Urban transportation networks: Equilibrium analysis with mathematical programming methods, Prentice-Hall, Englewood Cliffs, NJ.
Shen, L. Y., and Wu, Y. Z. (2005). “Risk concession model for build-operate-transfer contract projects.” J. Constr. Eng. Manage., 211–220.
Sinha, K. C., and Labi, S. (2007). Transportation decision making: Principles of project evaluation and programming, Wiley, Hoboken, NJ.
Subprasom, K., and Chen, A. (2007). “Effects of regulation on highway pricing and capacity choice of a build-operate-transfer scheme.” J. Constr. Eng. Manage., 64–71.
Thomas, A. V., Kalidindi, S. N., and Ananthanarayanan, K. (2003). “Risk perception analysis of BOT road project participants in India.” Constr. Manage. Econ., 21(4), 393–407.
Ukkusuri, S. V., Han, L., and Kien, D. (2012). “Dynamic user equilibrium with a path based cell transmission model for general traffic networks.” Transp. Res. B Methodol., 46(10), 1657–1684.
Ukkusuri, S. V., and Waller, S. T. (2006). “Single point approximations for traffic equilibrium under uncertain demand.” Transportation Research Record 1964, Transportation Research Board, Washington, DC, 169–175.
Wang, D., Song, J., Dai, D. S., and Li, Z. (2009). “A decision method of concession period for traffic projects in a build-operate-transfer scheme.” Proc., Int. Conf. on Management Science and Engineering, IEEE, New York, 1935–1941.
Xenidis, Y., and Angelides, D. (2005a). “The financial risks in build-operate-transfer projects.” Constr. Manage. Econ., 23(4), 431–441.
Xenidis, Y., and Angelides, D. (2005b). “The legal risks in build-operate-transfer projects.” J. Constr. Res., 6(2), 273–292.
Yun, S., and Caldas, C. H. (2009). “Analysing decision variables that influence preliminary feasibility studies using data mining techniques.” Constr. Manage. Econ., 27(1), 73–87.
Zhang, X. (2005). “Financial viability analysis and capital structure optimization in privatized public infrastructure projects.” J. Constr. Eng. Manage., 656–668.

Information & Authors

Information

Published In

Go to Journal of Infrastructure Systems
Journal of Infrastructure Systems
Volume 20Issue 3September 2014

History

Received: Jan 18, 2013
Accepted: Jun 19, 2013
Published online: Jun 21, 2013
Discussion open until: Jul 19, 2014
Published in print: Sep 1, 2014

Permissions

Request permissions for this article.

Authors

Affiliations

Tanaphat Jeerangsuwan [email protected]
Research Assistant, Division of Construction and Management, School of Civil Engineering, Purdue Univ., 550 Stadium Mall Dr., West Lafayette, IN 47907. E-mail: [email protected]
Hisham Said [email protected]
Assistant Professor, Dept. of Civil Engineering, Santa Clara Univ., Santa Clara, CA 95053. E-mail: [email protected]
Assistant Professor, Division of Construction and Management, School of Civil Engineering, Purdue Univ., 550 Stadium Mall Dr., West Lafayette, IN 47907 (corresponding author). E-mail: [email protected]
Satish Ukkusuri [email protected]
Associate Professor, School of Civil Engineering, Purdue Univ., 550 Stadium Mall Dr., West Lafayette, IN 47907. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share