Cost-Benefit Analysis and the Optimal Timing of Road Infrastructures
Publication: Journal of Infrastructure Systems
Volume 18, Issue 4
Abstract
Standard cost-benefit analysis is based on a static setting, allowing the decision to be made of whether or not a new infrastructure should be built, but not allowing the conclusion to be made of if it would be preferable to build it right now or in the future. In this paper, the optimal timing for building a road within a cost-benefit framework is addressed. A general approach for choosing the optimal timing, taking into account the characteristics of a road infrastructure, is proposed. A model of the expected net present value with two sources of uncertainty (gross domestic product growth and fuel prices) is proposed. Both these variables are assumed to be stochastic, so Monte Carlo simulation is used for the implementation of the model. A methodology is also proposed to estimate the thresholds that define the optimal starting time for the infrastructure. The model is applied to a real infrastructure currently under development and the rules that define the optimal timing for starting its construction are analyzed.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgements
The authors are indebted to three anonymous referees whose comments contributed significantly to improve the paper.
References
Belli, P., Anderson, J., Barnum, H., Dixon, J., and Tan, J.-P. (1998). Handbook on economic analysis of investment operations, The World Bank, Washington, D.C.
Bickel, P. et al. (2006). Developing harmonised European approaches for transport costing and project assessment (HEATCO). Deliverable 5: Proposal for harmonised guidelines, Institut für Energiewissenschaft und Rationelle Energieanwendung, Stuttgart, Germany.
Bowe, M., and Lee, D. (2004). “Project evaluation in the presence of multiple embedded real options: Evidence from the Taiwan high-speed rail project.” J. Asian Econ., 15(1), 71–98.
Brealey, R., Myers, S., and Allen, F. (2008). Principles of corporate finance, 9th Ed., McGraw-Hill/Irwin, Singapore, 121–135.
Copeland, T., and Antikarov, V. (2003). Real options: A practitioner’s guide, revised edition, Thomson/Texere, New York.
Dept. for Transport (DfT). (2002). COBA 11 user manual, economic assessment of road schemes, Vol. 13, Part 5, Department for Transport, London.
Dept. for Transport (DfT). (2006). Transport, wider economic benefits and impacts on GDP, Department for Transport, London.
Dept. for Transport (DfT). (2009). Value of time and operating costs—TAG Unit 3.5.6, Department for Transport, London.
Dixit, A., and Pindyck, R. (1994). Investment under uncertainty, Princeton Univ. Press, Princeton, NJ.
European Commission (EC). (2008). Guide to cost-benefit analysis of investment projects: Structural funds, cohesion fund and instrument for pre-accession—Final report, Directorate General Regional Policy, Brussels, Belgium.
Galera, A., and Solino, A. (2010). “A real options approach for the valuation of highway concessions.” Transp. Sci., 44(3), 416–427.
Graham, D., and Glaister, S. (2002). “The demand for automobile fuel: A survey of elasticities.” J. Transport Econ. Policy, 36(1), 1–25.
Graham, D., and Glaister, S. (2004). “Road traffic demand elasticity estimates: A review.” Transport Rev., 24(3), 261–274.
Greenberg, H. (1958). “An analysis of traffic flow.” Oper. Res., 7(1), 79–85.
Hall, F. L. (1996). “Traffic stream characteristics.” Chapter_2, Traffic flow theory, Gartner, N. H., Messer, C. J., and Rathi, A. K., eds., U.S. Federal Highway Administration, Washington, D.C.
Hanly, M., Dargay, J., and Goodwin, P. (2002). Review of income and price elasticities in the demand for road traffic, ESRC Transport Studies Unit Publication 2002/13, London.
KPMG. (2008). Estudo Económico a 75 anos com Actualização após Adjudicação—Projecto Douro Interior, Estradas de Portugal, 〈http://www.novasestradas.pt/gestorconteudos/attachs/242.pdf〉 (Oct. 8, 2010).
KPMG/VTM. (2008). Estudo de Impacto Económico Global—Subconcessão Douro Interior, Estradas de Portugal, 〈http://www.novasestradas.pt/gestorconteudos/attachs/239.pdf〉 (Oct. 8, 2010).
McDonald, R., and Siegel, D. (1986). “The value of waiting to invest.” Q. J. Econ., 101(4), 707–728.
Pearce, D., Atkinson, G., and Mourato, S. (2006). Cost-benefit analysis and the environment: Recent developments, OECD Publishing, Paris, France.
Reis, J., Godinho, P., Barata, E., and Cruz, L. (2008). Estudo Integrado dos Impactes Económicos Globais associados às Concessões da AE Transmontana, Túnel do Marão e Douro Interior. FEUC and Estradas de Portugal, Coimbra, Portugal, 〈http://www.moptc.pt/tempfiles/20090127230231moptc.pdf〉 (Oct. 8, 2010).
Rose, S. (1998). “Valuation of interacting real options in a tollroad infrastructure project.” Q. Rev. Econ. Finance, 38(3), 711–723.
Salling, K., and Leleur, S. (2011). “Transport appraisal and Monte Carlo simulation by use of the CBA-DK model.” Transp. Policy, 18(1), 236–245.
Saphores, J.-D., and Boarnet, M. (2006). “Uncertainty and the timing of an urban congestion relief investment. The no-land case.” J. Urban Econ., 59(2), 189–208.
Transportation Research Board. (2000). Highway capacity manual, National Research Council, Washington, D.C.
The World Bank. (2005). “When and how to use NPV, IRR AND modified IRR.” Transport Note No. TRN-6, Washington, D.C., 〈http://siteresources.worldbank.org/INTTRANSPORT/Resources/336291-1227561426235/5611053-1231943010251/trn-6EENote2.pdf〉 (Nov. 11, 2011).
Zhao, T., Sundararajan, S., and Tseng, C.-L. (2004). “Highway development decision-making under uncertainty: A real options approach.” J. Infrastruct. Syst., 10(1), 23–32.
Information & Authors
Information
Published In
Copyright
© 2012 American Society of Civil Engineers.
History
Received: Mar 3, 2011
Accepted: Apr 4, 2012
Published online: Apr 11, 2012
Published in print: Dec 1, 2012
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.