The timely completion of complex dam-construction projects is a challenging proposition, both in developing and developed countries. Delays are frequent in such projects and impose costly burdens on regional and national economies. One of the main reasons for the delay in those projects is caused by ignoring the uncertainty inherent in the completion of the tasks that arise in dam construction. Project managers often use the critical path method to schedule those activities. A key limitation of this method is that the completion times for activities near the critical path are frequently assessed inaccurately. This paper evaluates the uncertainty of scheduling the tasks associated with the construction of dams, and relies on the Gelal earthfill dam and Khersan 3 concrete dam projects for illustration purposes. An evaluation method based on Monte Carlo simulation and risk management indices is herein proposed. The results of this study are intended to assist project managers and decision-makers in scheduling of construction activities and minimizing associated costs. Results indicate that the probabilities of completing the aforementioned earth and concrete dams on schedule are 65 and 50%, respectively. Moreover, the results demonstrate the importance that the completion times of individual project activities has on overall timely project completion.

Get full access to this article

View all available purchase options and get full access to this article.

References

Al-Khalil, M. I., and Al-Ghafly, M. A. (1999). “Delay in public utility projects in Saudi Arabia.” Int. J. Project Manage., 17(2), 101–106.
Al-Momani, A. H. (2000). “Construction delay: A quantitative analysis.” Int. J. Project Manage., 18(1), 51–59.
Ashofteh, P. S., Bozorg-Haddad, O., and Mariño, M. (2013a). “Climate change impact on reservoir performance indices in agricultural water supply.” J. Irrig. Drain. Eng., 85–97.
Ashofteh, P.-S., Bozorg-Haddad, O., Akbari-Alashti, H., and Mariño, M. A. (2015a). “Determination of irrigation allocation policy under climate change by genetic programming.” J. Irrig. Drain. Eng., 04014059.
Ashofteh, P.-S., Bozorg-Haddad, O., and Mariño, M. A. (2013b). “Scenario assessment of streamflow simulation and its transition probability in future periods under climate change.” Water Resour. Manage., 27(1), 255–274.
Ashofteh, P.-S., Bozorg-Haddad, O., and Mariño, M. A. (2015c). “Risk analysis of water demand for agricultural crops under climate change.” J. Hydrol. Eng., 04014060.
Ashofteh, P.S., Bozorg-Haddad, O., and Loaiciga, H. A. (2015b). “Evaluation of climatic-change impacts on multi-objective reservoir operation with multiobjective genetic programming.” J. Water Resour. Plann. Manag., 04015030.
Bozorg-Haddad, O., Ashofteh, P.-S., Ali-Hamzeh, M., and Mariño, M. A. (2015a). “Investigation of reservoir qualitative behavior resulting from biological pollutant sudden entry.” J. Irrig. Drain. Eng., 04015004.
Bozorg-Haddad, O., Ashofteh, P.-S., and Mariño, M. A. (2015b). “Levee’s layout and design optimization in protection of flood areas.” J. Irrig. Drain. Eng., 04015004.
Bozorg-Haddad, O., Ashofteh, P.-S., Rasoulzadeh-Gharibdousti, S., and Mariño, M. A. (2014). “Optimization model for design-operation of pumped-storage and hydropower systems.” J. Energy Eng., 04013016.
Bubshait, A. A., and Cunningham, M. J. (1998). “Comparison of delay analysis methodologies.” J. Constr. Eng. Manage., 315–322.
Cho, J., and Yum, B. (1997) “An uncertainty importance measure of activities in PERT networks.” Int. J. Prod. Res., 35(10), 2737–2758.
FatemiGhomi, S., and Teimouri, E. (2002). “Path critical index and activity critical index in PERT networks.” Eur. J. Oper. Res., 141(1), 147–152.
Frimpong, Y., Oluwoye, J., and Crawford, L. (2003). “Causes of delay and cost overruns in construction of groundwater projects in developing countries; Ghana as a case study international.” J. Project Manage., 21(5), 321–326.
Grubbs, F. E. (1962). “Attempts to validate certain PERT statistics or a picking on PERT.” J. Oper. Res., 10(6), 912–915.
Hendrickson, C., and Au, T. (1989). Project management for construction, Prentice-Hall, Englewood Cliffs, NJ.
Jacob, D., and Kane, M. (2004). “Forecasting schedule completion using earned value metrics.” Measurable News Summer, 1(3), 11–17.
Kartam, S. (1999). “Generic methodology for analyzing delay claims.” J. Constr. Eng. Manage., 409–419.
Littlefield, T. K., Jr., and Randolph, P. H. (1987). “Another note on PERT times.” Manage. Sci., 33(10), 1357–1359.
Long, N. D., Ogunlana, S., Quang, T., and Lam, K. C. (2004). “Large construction projects in developing countries: A case study from Vietnam.” Int. J. Project Manage., 22(7), 553–561.
MacCrimmon, K. R., and Ryaveck, C. A. (1964). “An analytical study of the PERT assumptions.” J. Oper. Rese., 12(1), 16–37.
Martin, J. (1965). “Distribution of the time through a directed, acyclic network.” J. Oper. Res., 13(1), 46–66.
Morris, S. (1990). “Cost and time overruns in public sector construction projects.” Econ. Political Weekly, 25(47), M-154–M-168.
Odeh, A. M., and Battaineh, H. T. (2002). “Causes of construction delay: Traditional contracts.” Int. J. Project Manage., 20(1), 67–73.
PertMaster [Computer software]. PertMaster project analytics, Houston.
PMBOK (Project Management Body of Knowledge). (2004). A guide to the project management body of knowledge, 3rd Ed., Project Management Institute, Newtown Square, PA.
Rodgers, J. L., and Nicewander, W. A. (1988). “Thirteen ways to look at the correlation coefficient.” Am. Statistician, 42(1), 59–66.
Sonuga, F., Aliboh, O., and Oloke, D. (2002). “Particular barriers and issues associated with projects in a developing and emerging economy. Case study of some abandoned water and irrigation projects in Nigeria.” Int. J. Project Manage., 20(8), 611–616.
Vanhoucke, M. (2009). Measuring time: Improving project performance using earned value management, Springer Science and Business Media, New York.
VanSlyke, R. M. (1963). “Monte Carlo methods and the PERT problem.” Oper. Res., 11(5), 839–860.
Williams, T. M. (2003). “Assessing extension of time delays on major projects.” Int. J. Project Manage., 21(1), 19–26.

Information & Authors

Information

Published In

Go to Journal of Irrigation and Drainage Engineering
Journal of Irrigation and Drainage Engineering
Volume 142Issue 5May 2016

History

Received: Apr 24, 2015
Accepted: Oct 26, 2015
Published online: Feb 11, 2016
Published in print: May 1, 2016
Discussion open until: Jul 11, 2016

Permissions

Request permissions for this article.

Authors

Affiliations

Omid Bozorg-Haddad [email protected]
Associate Professor, Dept. of Irrigation and Reclamation Engineering, Faculty of Agricultural Engineering and Technology, College of Agriculture and Natural Resources, Univ. of Tehran, Karaj, 3158777871 Tehran, Iran (corresponding author). E-mail: [email protected]
Hossein Orouji [email protected]
Dept. of Irrigation and Reclamation Engineering, Faculty of Agricultural Engineering and Technology, College of Agriculture and Natural Resources, Univ. of Tehran, Karaj, 3158777871 Tehran, Iran. E-mail: [email protected]
Sahar Mohammad-Azari [email protected]
Ph.D. Candidate, Dept. of Irrigation and Reclamation Engineering, Faculty of Agricultural Engineering and Technology, College of Agriculture and Natural Resources, Univ. of Tehran, Karaj, 3158777871 Tehran, Iran. E-mail: [email protected]
Hugo A. Loáiciga, F.ASCE [email protected]
Professor, Dept. of Geography, Univ. of California, Santa Barbara, CA 93106. E-mail: [email protected]
Miguel A. Mariño, Dist.M.ASCE [email protected]
Distinguished Professor Emeritus, Dept. of Land, Air and Water Resources, Dept. of Civil and Environmental Engineering, and Dept. of Biological and Agricultural Engineering, Univ. of California, 139 Veihmeyer Hall, Davis, CA 95616-8628. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share