Abstract
Studying the flow through a dam breach is important because it is characterized by a great deal of uncertainty and can be associated with loss of lives and properties. In the present study, planar dam breach erosion due to overtopping is simulated using a three-dimensional (3D) computational fluid dynamics (CFD) model, FLOW-3D. The model parameters are calibrated by comparing the results of the dam surface elevations at different time instants with those of an earlier experimental study. Also, the results for maximum velocity and turbulence characteristics [turbulent kinetic energy (TKE), turbulence intensity (TI), and the excess shear stress (ESS)] are presented for the calibrated model. Sensitivity analysis of the parameters (dam material, , dam height, , downstream slope, , width of the crest, , and inlet discharge, ) affecting the dam breach is performed to study the erosion rate and peak discharge through the breach section. Empirical equations for the peak breach discharge and erosion rate are presented using the simulated results. The study reveals that the dam material, inlet discharge, and dam downstream slope are among the most influential factors affecting the breaching process.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
The authors acknowledge the support provided by Indian Institute of Technology Gandhinagar.
References
Amaral, S. 2017. “Experimental characterization of the failure by overtopping of embankment dams.” Ph.D. thesis, Instituto Superior Técnico, Universidade de Lisboa.
Bento, A. M., S. Amaral, T. Viseu, R. Cardoso, and R. M. Ferreira. 2017. “Direct estimate of the breach hydrograph of an overtopped earth dam.” J. Hydraul. Eng. 143 (6): 06017004. https://doi.org/10.1061/(ASCE)HY.1943-7900.0001294.
Chinnarasri, C., S. Jirakidlert, and S. Wongwises. 2004. “Embankment dam breach and its outflow characteristics.” Civ. Eng. Environ. Syst. 21 (4): 247–264. https://doi.org/10.1080/10286600412331328622.
Chinnarasri, C., T. Tingsanchali, S. Weesakul, and S. Wongwises. 2003. “Flow patterns and damage of dike overtopping.” Intl. J. Sediment Res. 18 (4): 301–309. https://doi.org/10.1061/(ASCE)HY.1943-7900.0001294.
De Lorenzo, G., and F. Macchione. 2013. “Formulas for the peak discharge from breached earthfill dams.” J. Hydraul. Eng. 140 (1): 56–67. https://doi.org/10.1061/(ASCE)HY.1943-7900.0000796.
Dupont, E., B. J. Dewals, P. Archambeau, S. Erpicum, and M. Pirotton. 2007. “Experimental and numerical study of the breaching of an embankment dam.” In Vol. 1 of Proc., 32nd Congress of IAHR, 1–10. Madrid, Spain: IAHR.
FLOW-3D. 2014. FLOW-3D (v11.1) user manual. Santa Fe, NM: Flow Science.
Froehlich, D. C. 2016. “Predicting peak discharge from gradually breached embankment dam.” J. Hydrol. Eng. 21 (11): 04016041. https://doi.org/10.1061/(ASCE)HE.1943-5584.0001424.
Guan, M. F., N. G. Wright, and P. A. Sleigh. 2014. “2D process-based morphodynamic model for flooding by noncohesive dyke breach.” J. Hydraul. Eng. 140 (7): 04014022. https://doi.org/10.1061/(ASCE)HY.1943-7900.0000861.
LaRocque, L. A., J. Imran, and M. H. Chaudhry. 2013. “3D numerical simulation of partial breach dam-break flow using the LES and k–ε turbulence models.” J. Hydraul. Res. 51 (2): 145–157. https://doi.org/10.1080/00221686.2012.734862.
Morris, M. W. 2005. “Investigation of extreme flood processes and uncertainty.” Final Technical Rep. Accessed August 16, 2017. http://www.impact-project.net/wp2_technical.htm.
Ozmen-Cagatay, H., and S. Kocaman. 2011. “Dam-break flow in the presence of obstacle: Experiment and CFD simulation.” Eng. Appl. Comput. Fluid Mech. 5 (4): 541–552. https://doi.org/10.1080/19942060.2011.11015393.
Pickert, G., V. Weitbrecht, and A. Bieberstein. 2011. “Breaching of overtopped river embankments controlled by apparent cohesion.” J. Hydraul. Res. 49 (2): 143–156. https://doi.org/10.1080/00221686.2011.552468.
Pierce, M. W., C. I. Thornton, and S. R. Abt. 2010. “Predicting peak outflow from breached embankment dams.” J. Hydrol. Eng. 15 (5): 338–349. https://doi.org/10.1061/(ASCE)HE.1943-5584.0000197.
Pontillo, M., L. Schmocker, M. Greco, and W. H. Hager. 2010. “1D numerical evaluation of dike erosion due to overtopping 1D numerical evaluation of dike erosion due to overtopping.” J. Hydraul. Res. 48 (5): 573–582. https://doi.org/10.1080/00221686.2010.507005.
Sabbagh-Yazdi, S. R., and M. Jamshidi. 2012. “Depth-averaged hydrodynamic model for gradual breaching of embankment dams attributable to overtopping considering suspended sediment transport.” J. Hydraul. Eng. 139 (6): 580–592. https://doi.org/10.1061/(ASCE)HY.1943-7900.0000706.
Saberi, O., and G. Zenz. 2016. “Numerical investigation on 1D and 2D embankment dams failure due to overtopping flow.” Int. J. Hydraul. Eng. 5 (1): 9–18.
Schmocker, L., and W. H. Hager. 2009. “Modelling dike breaching due to overtopping.” J. Hydraul. Res. 47 (5): 585–597. https://doi.org/10.3826/jhr.2009.3586.
Schmocker, L., and W. H. Hager. 2010. “Overtopping and breaching of dikes–Breach profile and breach flow.” In Proc., 5th Int. Conf. on River Flow, 515–522. Karlsruhe, Germany: Bundesanstalt für Wasserbau.
Schmocker, L., and W. H. Hager. 2012. “Plane dike-breach due to overtopping: Effect of sediment size, dike height and discharge.” J. Hydraul. Res. 50 (6): 576–586. https://doi.org/10.1080/00221686.2012.713034.
Tabrizi, A., E. Elalfy, M. Elkholy, M. H. Chaudhry, and J. Imran. 2017. “Effects of compaction on embankment breach due to overtopping.” J. Hydraul. Res. 55 (2): 236–247. https://doi.org/10.1080/00221686.2016.1238014.
Thornton, C. I., M. W. Pierce, and S. R. Abt. 2011. “Enhanced predictions for peak outflow from breached embankment dams.” J. Hydrol. Eng. 16 (1): 81–88. https://doi.org/10.1061/(ASCE)HE.1943-5584.0000288.
Tingsanchali, T., and C. Chinnarasri. 2001. “Numerical modeling of dam failure due to flow overtopping.” Hydrol. Sci. J. 46 (1): 113–130. https://doi.org/10.1080/02626660109492804.
Tinney, E. R., and H. Y. Hsu. 1961. “Mechanics of washout of an erodible fuse plug.” J. Hydraul. Div. 87 (3): 1–29.
Volz, C., P. Rousselot, D. Vetsch, R. Mueller, R. Faeh, and R. Boes. 2010. “Numerical modeling of dam breaching processes due to overtopping flow.” In Proc., 8th ICOLD European Club Symp., 691–696. Innsbruck, Austria: TU-Graz-Research.
Wei, G., J. Brethour, M. Grünzner, and J. Burnham. 2014. The sedimentation scour model in FLOW-3D. Santa Fe, NM: Flow Science.
Wu, W., R. Marsooli, and Z. He. 2011. “Depth-averaged two-dimensional model of unsteady flow and sediment transport due to noncohesive embankment break/breaching.” J. Hydraul. Eng. 138 (6): 503–516. https://doi.org/10.1061/(ASCE)HY.1943-7900.0000546.
Yang, C., B. Lin, C. Jiang, and Y. Liu. 2010. “Predicting near-field dam-break flow and impact force using a 3D model.” J. Hydraul. Res. 48 (6): 784–792. https://doi.org/10.1080/00221686.2010.531099.
Zhu, Y., P. J. Visser, J. K. Vrijling, and G. Wang. 2011. “Experimental investigation on breaching of embankments.” Sci. China Tech. Sci. 54 (1): 148–155. https://doi.org/10.1007/s11431-010-4208-9.
Information & Authors
Information
Published In
Copyright
©2019 American Society of Civil Engineers.
History
Received: Aug 18, 2018
Accepted: Dec 27, 2018
Published online: Mar 28, 2019
Published in print: Jun 1, 2019
Discussion open until: Aug 28, 2019
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.