Closure to “Parameter Estimation of the Nonlinear Muskingum Model Using Parameter-Setting-Free Harmony Search” by Zong Woo Geem
Publication: Journal of Hydrologic Engineering
Volume 17, Issue 12
![First page of PDF](/cms/10.1061/(ASCE)HE.1943-5584.0000668/asset/c3fd6b33-fe6a-449b-8420-1d6ac7fcfa12/assets/(asce)he.1943-5584.0000668.fp.png)
Get full access to this article
View all available purchase options and get full access to this article.
References
Ayvaz, M. T., Kayhan, A. H., Ceylan, H., and Gurarslan, G. (2009). “Hybridizing the harmony search algorithm with a spreadsheet ‘Solver’ for solving continuous engineering optimization problems.” Eng. Optim., 41(12), 1119–1144.
Barati, R. (2011). “Parameter estimation of nonlinear Muskingum models using Nelder-Mead simplex algorithm.” J. Hydrol. Eng., 16(11), 946–954.
Chu, H. J. (2009). “The Muskingum flood routing model using a neuro-fuzzy approach.” KSCE J Civil. Eng., 13(5), 371–376.
Chu, H. J., and Chang, L. C. (2009). “Applying particle swarm optimization to parameter estimation of the nonlinear Muskingum model.” J. Hydrol. Eng., 14(9), 1024–1027.
Das, A. (2004). “Parameter estimation for muskingum models.” J. Irrig. Drain. Eng., 130(2), 140–147.
Fesanghary, M., Mahdavi, M., Minary-Jolandan, M., and Alizadeh, Y. (2008). “Hybridizing harmony search algorithm with sequential quadratic programming for engineering optimization problems.” Comput. Meth. Appl. Mech. Eng., 197(33–40), 3080–3091.
Geem, Z. W. (2005). “Harmony search in water pump switching problem.” Lect. Notes Comput. Sci., 3612, 751–760.
Geem, Z. W. (2006a). “Optimal cost design of water distribution networks using harmony search.” Eng. Optim., 38(3), 259–280.
Geem, Z. W. (2006b). “Parameter estimation for the nonlinear Muskingum model using BFGS technique.” J. Irrig. Drain. Eng., 132(5), 474–478.
Geem, Z. W. (2008). “Novel derivative of harmony search algorithm for discrete design variables.” Appl. Math. Comput., 199(1), 223–230.
Geem, Z. W. (2009). “Particle-swarm harmony search for water network design.” Eng. Optim., 41(4), 297–311.
Geem, Z. W. (2011). “Transport energy demand modeling of South Korea using artificial neural network.” Energy Policy, 39(8), 4644–4650.
Geem, Z. W., and Cho, Y.-H. (2011). “Optimal design of water distribution networks using parameter-setting-free harmony search for two major parameters.” J. Water Resour. Plann. Manage., 137(4), 377–380.
Geem, Z. W., Kim, J. H., and Loganathan, G. V. (2001). “A new heuristic optimization algorithm: Harmony search.” Simulation, 76(2), 60–68.
Geem, Z. W., and Roper, W. E. (2009). “Energy demand estimation of South Korea using artificial neural network.” Energy Policy, 37(10), 4049–4054.
Geem, Z. W., and Sim, K.-B. (2010). “Parameter-setting-free harmony search algorithm.” Appl. Math. Comput., 217(8), 3881–3889.
Geem, Z. W., Tseng, C.-L., Kim, J., and Bae, C. (2007). “Trenchless water pipe condition assessment using artificial neural network.” Proc., Int. Pipeline Conf., ASCE, Reston, VA.
Gill, M. A. (1978). “Flood routing by the Muskingum method.” J. Hydrol., 36(3–4), 353–363.
Hasancebi, O., Erdal, F., and Saka, M. P. (2010). “Adaptive harmony search method for structural optimization.” J. Struct. Eng., 136(4), 419–431.
Karahan, H., Gurarslan, G., and Geem, Z. W. (2012). “Parameter estimation of the nonlinear Muskingum flood routing model using a hybrid harmony search algorithm.” J. Hydrol. Eng., in press (Feb. 15, 2012).
Kim, J. H., Geem, Z. W., and Kim, E. S. (2001). “Parameter estimation of the nonlinear Muskingum model using harmony search.” J. Am. Water Resour. Assoc., 37(5), 1131–1138.
Luo, J., and Xie, J. (2010). “Parameter estimation for nonlinear Muskingum model based on immune clonal selection algorithm.” J. Hydrol. Eng., 15(10), 844–851.
Mohan, S. (1997). “Parameter estimation of nonlinear Muskingum models using genetic algorithm.” J. Hydraul. Eng., 123(2), 137–142.
Tung, Y.-K. (1985). “River flood routing by nonlinear Muskingum method.” J. Hydraul. Eng., 111(12), 1447–1460.
Yoon, J., and Padmanabhan, G. (1993). “Parameter estimation of linear and nonlinear Muskingum models.” J. Water Resour. Plann. Manage., 119(5), 600–610.
Information & Authors
Information
Published In
Copyright
© 2012 American Society of Civil Engineers.
History
Received: Mar 18, 2012
Accepted: May 29, 2012
Published online: Nov 15, 2012
Published in print: Dec 1, 2012
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.