Construction Schemes for Shallow and Asymmetrically Loaded Tunnels Crossing Below a Bridge
Publication: International Journal of Geomechanics
Volume 20, Issue 7
Abstract
With the development of infrastructure, new tunnel crossings below existing bridges are becoming increasingly common. This paper presents a case history of a shallow, double-line tunnel crossing below a bridge on a hillslope that was excavated using nonshield tunneling techniques. Due to poor geological conditions and unsymmetrical tunnel pressure, bridge stability is of great concern during tunneling. In addition to pregrouting the foundations of the bridge piers, selection of an appropriate construction scheme is essential. In this study, investigation of ground subsidence, bridge behavior, and an evaluation of bridge stability was carried out using the elastoplastic finite-element method (FEM) to model the excavation by three construction schemes: the ringlike drift-heading, center-diaphragm (CD), and cross-diaphragm (CRD) methods. Comparisons of ground subsidence and bridge deformation for the three construction schemes were made; monitored displacement data was also provided. Comprehensive analysis of the results indicated that the FEM gave a reasonable approximation of excavation-induced displacement and was able to discriminate the relative displacement-controlling capability of the three excavation methods. The CRD method demonstrated superior deformation-controlling capability and was ultimately adopted as the excavation method. The project was completed successfully, and no cracking was observed in either the piers or bridge deck during tunneling; the monitored displacements were larger than those calculated, which may be attributed to the excavation disturbance of the rocks. It is not easy to approximate discontinuous deformation by continuity-based FEM. This case history may serve as a reference for similar projects.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
The research was supported by the National Natural Science Foundation of China (No. 41772322) and the National Key R&D Program of China (No. 2018YFC1505006).
References
Addenbrooke, T. I., and D. M. Potts. 2001. “Twin tunnel interaction: Surface and subsurface effects.” Int. J. Geomech. 1 (2): 249–271. https://doi.org/10.1061/(ASCE)1532-3641(2001)1:2(249).
Afifipour, M., M. Sharifzadeh, K. Shahriar, and H. Jamshidi. 2011. “Interaction of twin tunnels and shallow foundation at Zand underpass, Shiraz metro, Iran.” Tunnelling Underground Space Technol. 26 (2): 356–363.
Deng, J. H., and C. F. Lee. 2001. “Displacement back analysis for a steep slope at the Three Gorges Project site.” Int. J. Rock Mech. Min. Sci. 38 (2): 259–268.
Deng, J. H., C. F. Lee, and X. R. Ge. 2001. “Characterization of the disturbed zone in a large rock excavation for the Three Gorges Project.” Can. Geotech. J. 38 (1): 95–106.
Gomes, A., M. Boefer, and J. H. Cruz. 2004. “Metro de Santiago: Tunnelling under the Fray Andresito Bridge.” Tunnelling Underground Space Technol. 19 (4–5): 337–338.
Higgins, K. G., R. J. Mair, and D. M. Potts. 1996. “Numerical modeling of the influence of the Westminster Station excavation and tunneling on the Big Ben clock tower.” In Geotechnical Aspects of Underground Construction in Soft Ground, 525–530. Rotterdam, Netherlands and Brookfield, VT: A. A. Balkema.
Jin, D. L., D. J. Yuan, X. G. Li, and H. T. Zheng. 2018a. “Analysis of the settlement of an existing tunnel induced by shield tunneling underneath.” Tunnelling Underground Space Technol. 81: 209–220.
Jin, D. L., D. J. Yuan, X. G. Li, and H. T. Zheng. 2018b. “An in-tunnel grouting protection method for excavating twin tunnels beneath an existing tunnel.” Tunnelling Underground Space Technol. 71: 27–35.
Kimura, H., T. Itoh, M. Iwata, and K. Fujimoto. 2005. “Application of new urban tunneling method in Baikoh tunnel excavation.” Tunnelling Underground Space Technol. 20 (2): 151–158.
Lee, Y. J., and C. S. Yoo. 2006. “Behaviour of a bored tunnel adjacent to a line of loaded piles.” Tunnelling Underground Space Technol. 21 (3–4): 370.
Li, K., and B. Gao. 2010. “Study of construction schemes for metro tunnel crossing river and bridge.” Rock Soil Mech. 31 (5): 1509–1515.
Li, S. R. 2013. “Influences of tunneling on stability of adjacent existing bridge piles and optimization of construction scheme.” Ph.D. thesis, School of Civil Engineering, Changsha Univ. of Science Technology, Changsha, China.
Li, Z. Y., and Y. H. Zeng. 2003. Design principles and methods of underground structures. Chengdu, China: Southwest Jiaotong University Press.
Liu, X., Q. Fang, and D. L. Zhang. 2018. “Mechanical responses of existing tunnel due to new tunnelling below without clearance.” Tunnelling Underground Space Technol. 80: 44–52.
Mirhabibi, A., and A. Soroush. 2012. “Effects of surface buildings on twin tunnelling-induced ground settlements.” Tunnelling Underground Space Technol. 29: 40–51.
Ng, C. W. W., K. Y. Fong, and H. L. Liu. 2018. “The effects of existing horseshoe-shaped tunnel sizes on circular crossing tunnel interactions: Three-dimensional numerical analyses.” Tunnelling Underground Space Technol. 77: 68–79.
Sharma, J. S., A. M. Hefny, J. Zhao, and C. W. Chan. 2001. “Effect of large excavation on deformation of adjacent MRT tunnels.” Tunnelling Underground Space Technol. 16 (2): 93–98.
Sirivachiraporn, A., and N. Phienwej. 2012. “Ground movements in EPB shield tunneling of Bangkok subway project and impacts on adjacent buildings.” Tunnelling Underground Space Technol. 30: 10–24.
Su, D., D. S. Wang, Z. J. Xing, J. B. Gao, and H. L. Yu. 2008. “Settlement control of tunnel construction down-traversing adjacent bridge.” Constr. Technol. 37 (9): 66–69.
Tang, M. M., Z. Y. Wang, and Y. P. Li. 2011. “Study of construction methods for crossing bias small interval highway tunnel.” Rock Soil Mech. 32 (4): 1163–1168.
Wang, S. Y., J. S. Yang, and Y. H. Yang. 2014. “Construction of large-span twin tunnels below a high-rise transmission tower: A case study.” Geotech. Geol. Eng. 32 (2): 453–467.
Wang, Y. X., S. B. Shan, C. Zhang, and P. P. Guo. 2019. “Seismic response of tunnel lining structure in a thick expansive soil stratum.” Tunnelling Underground Space Technol. 88: 250–259.
Xiang, Y. Y., Z. P. Jiang, and H. J. He. 2008. “Assessment and control of metro-construction induced settlement of a pile-supported urban overpass.” Tunnelling Underground Space Technol. 23 (3): 300–307.
Xu, Q. W., H. H. Zhu, X. F. Ma, Z. Z. Ma, X. J. Li, Z. H. Tang, and K. Zhuo. 2015. “A case history of shield tunnel crossing through group pile foundation of a road bridge with pile underpinning technologies in Shanghai.” Tunnelling Underground Space Technol. 45: 20–33.
Yoo, C. 2013. “Interaction between tunneling and bridge foundation—A 3D numerical investigation.” Comput. Geotech. 49: 70–78.
Yu, S. E. S., T. C. J. Yee, I. H. Kim, N. H. Osborn, and R. Siew. 2016. “Tunnelling undercrossing existing live MRT tunnels.” Tunnelling Underground Space Technol. 57: 241–256.
Zhou, J., X. Shi, K. Du, X. Qiu, X. Li, and H. S. Mitri. 2017. “Feasibility of random-forest approach for prediction of ground settlements induced by the construction of a shield-driven tunnel.” Int. J. Geomech. 17 (6): 04016129. https://doi.org/10.1061/(ASCE)GM.1943-5622.0000817.
Information & Authors
Information
Published In
Copyright
© 2020 American Society of Civil Engineers.
History
Received: Jan 29, 2019
Accepted: Oct 4, 2019
Published online: May 4, 2020
Published in print: Jul 1, 2020
Discussion open until: Oct 4, 2020
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.