Performance Evaluation of International Contractors in Saudi Arabia
Publication: Journal of Professional Issues in Engineering Education and Practice
Volume 142, Issue 1
Abstract
International construction contractors are practitioners operating in a complex environment of uncertainty. To be successful, they must learn to effectively execute projects in multiple regions and societies with multinational/multiethnic teams. This paper compares the performance of international and local construction contractors in the context of the Saudi Arabia construction industry as an example of international construction practices. The research statistically quantifies the effects of company ownership upon thirteen project performance indicators. It concludes by pointing out that international contractors have not only overcome the common challenges of delivering projects outside their resident country, but seem to have found success in the unique Saudi Arabian construction environment.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
The authors thank the King Fahd University of Petroleum & Minerals, Dhahran, Saudi Arabia for support of this research.
References
Anderson, S. D., Choi, J., Ennis, P., and Gierc, K. J. (2006). “Leading indicators during project execution.” Construction Industry Institute, Univ. of Texas at Austin, Austin, TX.
Bryde, D. J., and Robinson, L. (2005). “Client versus contractor perspectives on project success criteria.” Int. J. Proj. Manage., 23(8), 622–629.
Chan, A. P., Scott, D., and Lam, E. W. (2002). “Framework of success criteria for design/build projects.” J. Manage. Eng., 120–128.
Chan, D. W., Chan, A. P., and Lam, P. T. (2010). “Identifying the critical success factors for target cost contracts in the construction industry.” J. Facil. Manage., 8(3), 179–201.
CII (Construction Industry Institute). (2004). “Measuring the impacts of the delivery system on project performance-design-build and design-bid-build.” Univ. of Texas at Austin, Austin, TX.
Doaumu, O. S., and Onukwube, H. N. (2013). “Analysis of project success criteria in the nigerian construction industry.” Int. J. Sustainable Constr. Eng. Technol., 4(11), 31–47.
Hughes, S. W., Tippett, D. D., and Thomas, W. K. (2003). “Measuring project success in the construction industry.” Eng. Manage. J., 16(3), 31–37.
Hwang, B.-G., and Lim, E.-S. J. (2013). “Critical success factors for key project players and objectives: Case study of Singapore.” J. Constr. Eng. Manage., 204–215.
Ibbs, C. W., Kwak, Y. H., Ng, T., and Odabasi, A. M. (2003). “Project delivery systems and project change: Quantitative analysis.” J. Constr. Eng. Manage., 382–387.
Javernick-Will, A., and Levitt, R. E. (2010). “Mobilizing institutional knowledge for international projects.” J. Constr. Eng. Manage., 430–441.
Jin, Z., Deng, F., Li, H., and Skitmore, M. (2013). “Practical framework for measuring performance of international construction firms.” J. Constr. Eng. Manage., 1154–1167.
Kog, Y. C., and Loh, P. K. (2012). “Critical success factors for different components of construction projects.” J. Constr. Eng. Manage., 520–528.
Lee, S.-H., Jeon, R.-K., Kim, J.-H., and Kim, J.-J. (2011). “Stategies for developing countries to expand their shares in the global construction market: Phase-based SWOT and AAA analyses.” J. Constr. Eng. Manage., 137(6), 460–470.
Ngowi, A., Pienaar, E., Talukhaba, A., and Mbachu, J. (2005). “A globalisation of the construction industry—A review.” Build. Environ., 40(1), 135–141.
Ozorhon, B., Arditi, D., Kikmen, I., and Birgonul, M. T. (2008). “Implications of culture in the performance of international construction joint ventures.” J. Constr. Eng. Manage., 361–370.
Rosner, J. W., Thal, A. E., and West, C. J. (2009). “Analysis of the design-build delivery method in air force construction projects.” J. Constr. Eng. Manage., 135(8), 710–717.
Stevens, J. D. (1996). “Blueprint for measuring project quality.” J. Manage. Eng., 12(2), 34–39.
Wai, S., Yosof, A. M., and Ismail, S. (2012). “Exploring success criteria from the developers’ perspective in Malaysia.” Int. J. Eng. Bus. Manage., 4(2), 1–9.
Walewski, J., and Gibson Jr., G. E. (2003). “International project risk assessment: Methods, procedures, and critical factors.” Univ. of Texas at Austin, Austin, TX.
Yang, J., Shen, G. Q., Drew, D. S., and Ho, M. (2010). “Critical success factors for stakeholder management: Construction practitioners’ perspectives.” J. Constr. Eng. Manage., 136(7), 778–786.
Yu, A. T., Shen, Q., Kelly, J., and Hunter, K. (2006). “Investigation of critical success factors in construction project briefing by way of content analysis.” J. Constr. Eng. Manage., 132(11), 1178–1186.
Information & Authors
Information
Published In
Copyright
© 2015 American Society of Civil Engineers.
History
Received: Sep 22, 2014
Accepted: Mar 20, 2015
Published online: Apr 29, 2015
Discussion open until: Sep 29, 2015
Published in print: Jan 1, 2016
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.