Markets, Hierarchies, or Hybrids as Alternative Governance Structures in Construction Contracts: Transaction Cost Economics Analysis

Publication: Journal of Construction Engineering and Management
Volume 149, Issue 1

Abstract

Transaction cost economics is attracting considerable attention for establishing governance structures in institutions based on the so-called transaction dimensions (specificity, uncertainty, and frequency). However, few studies have looked at project governance based on transaction dimensions in construction. This research remedies this gap by providing an in-depth evaluation of the effect of transaction dimensions on the choice of project delivery and contract mechanism of a set of 84 construction projects. The study adopts data analysis through the Delphi method with the support of multinomial logistic and binary logistic regressions. The results support transaction cost economics for design-build versus design-bid-build and relational versus nonrelational choices. The results also show that project specificity is the primary driver in choosing project governance. This study gives empirical evidence for applying transaction cost economics in construction management. The research contributes to a further understanding of the choice between markets, hierarchies, or hybrids as alternative governance structures in construction projects.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

The data that support the findings of this study are available from the corresponding author upon reasonable request.

References

af Hällström, A., P. Bosch-Sijtsema, L. Poblete, R. Rempling, and M. Karlsson. 2021. “The role of social ties in collaborative project networks: A tale of two construction cases.” Construct. Manage. Econ. 39 (9): 723–738. https://doi.org/10.1080/01446193.2021.1949740.
Ahola, T., I. Ruuska, K. Artto, and J. Kujala. 2014. “What is project governance and what are its origins?” Int. J. Project Manage. 32 (8): 1321–1332. https://doi.org/10.1016/j.ijproman.2013.09.005.
Al Khalil, M. I. 2002. “Selecting the appropriate project delivery method using AHP.” Int. J. Project Manage. 20 (6): 469–474. https://doi.org/10.1016/S0263-7863(01)00032-1.
Ameyaw, E. E., Y. Hu, M. Shan, A. P. Chan, and Y. Le. 2016. “Application of Delphi method in construction engineering and management research: A quantitative perspective.” J. Civ. Eng. Manage. 22 (8): 991–1000. https://doi.org/10.3846/13923730.2014.945953.
Barthélemy, J., and B. V. Quélin. 2006. “Complexity of outsourcing contracts and ex post transaction costs: An empirical investigation.” J. Manage. Stud. 43 (8): 1775–1797. https://doi.org/10.1111/j.1467-6486.2006.00658.x.
Carmichael, D. G. 2000. Contracts and international project management. Rotterdam, Netherlands: A.A. Balkema.
Chan, A. P., E. H. Yung, P. T. Lam, C. M. Tam, and S. Cheung. 2001. “Application of Delphi method in selection of procurement systems for construction projects.” Construct. Manage. Econ. 19 (7): 699–718. https://doi.org/10.1080/01446190110066128.
Chen, Y. Q., J. Y. Liu, B. Li, and B. Lin. 2011. “Project delivery system selection of construction projects in China.” Expert Syst. Appl. 38 (5): 5456–5462. https://doi.org/10.1016/j.eswa.2010.10.008.
Dahlman, C. J. 1979. “The problem of externality.” J. Law Econ. 22 (1): 141–162. https://doi.org/10.1086/466936.
David, R. J., and S. K. Han. 2004. “A systematic assessment of the empirical support for transaction cost economics.” Strategic Manage. J. 25 (1): 39–58. https://doi.org/10.1002/smj.359.
De Vita, G., A. Tekaya, and C. L. Wang. 2010. “Asset specificity’s impact on outsourcing relationship performance: A disaggregated analysis by buyer-supplier asset specificity dimensions.” J. Bus. Res. 63 (7): 657–666. https://doi.org/10.1016/j.jbusres.2009.04.019.
Eriksson, P. E., and M. Westerberg. 2011. “Effects of cooperative procurement procedures on construction project performance: A conceptual framework.” Int. J. Project Manage. 29 (2): 197–208. https://doi.org/10.1016/j.ijproman.2010.01.003.
Feghaly, J., M. El Asmar, S. Ariaratnam, and W. Bearup. 2019. “Selecting project delivery methods for water treatment plants.” Eng. Constr. Archit. Manage. 27 (4): 936–951. https://doi.org/10.1108/ECAM-06-2019-0308.
Fornell, C., and D. F. Larcker. 1981. “Evaluating structural equation models with unobservable variables and measurement error.” J. Marketing Res. 18 (1): 39–50. https://doi.org/10.1177/002224378101800104.
Geraghty, D., and M. O’Mahony. 2016. “Urban noise analysis using multinomial logistic regression.” J. Transp. Eng. 142 (6): 04016020. https://doi.org/10.1061/(ASCE)TE.1943-5436.0000843.
Geyskens, I., J. B. E. Steenkamp, and N. Kumar. 2006. “Make, buy, or ally: A transaction cost theory meta-analysis.” Acad. Manage. J. 49 (3): 519–543. https://doi.org/10.5465/amj.2006.21794670.
Gil, N., I. D. Tommelein, and G. Ballard. 2004. “Theoretical comparison of alternative delivery systems for projects in unpredictable environments.” Construct. Manage. Econ. 22 (5): 495–508. https://doi.org/10.1080/01446190310001649100.
Hair, J. F., W. C. Black, and B. J. Babin. 2009. Multivariate data analysis: A global perspective. 7th ed. Upper Saddle River, NJ: Prentice Hall.
Hair, J. F., M. Celsi, D. J. Ortinau, and R. P. Bush. 2010. Vol. 2 of Essentials of marketing research. New York: McGraw-Hill/Irwin.
Harper, C. M., K. R. Molenaar, and J. P. Cannon. 2016. “Measuring constructs of relational contracting in construction projects: The owner’s perspective.” J. Constr. Eng. Manage. 142 (10): 04016053. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001169.
Henseler, J., C. M. Ringle, and R. R. Sinkovics. 2009. “The use of partial least squares path modeling in international marketing.” Adv. Int. Mark. 20 (Mar): 277–319. https://doi.org/10.1108/S1474-7979(2009)0000020014.
Hodgson, G. M. 2006. “What are institutions?” J. Econ. Issues 40 (1): 1–25. https://doi.org/10.1080/00213624.2006.11506879.
Hosmer, D. W., Jr., S. Lemeshow, and R. X. Sturdivant. 2013. Vol. 398 of Applied logistic regression. Hoboken, NJ: Wiley.
Hosseini, A., O. Lædre, B. Andersen, O. Torp, N. Olsson, and J. Lohne. 2016. “Selection criteria for delivery methods for infrastructure projects.” Procedia-Soc. Behav. Sci. 226 (Jul): 260–268. https://doi.org/10.1016/j.sbspro.2016.06.187.
Hosseinian, S. M., M. Andalib, and D. G. Carmichael. 2022. “Appropriate types of payments in construction contracts based on agency theory parameters.” J. Constr. Eng. Manage. 148 (1): 04021187. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002228.
Hosseinian, S. M., and D. G. Carmichael. 2013. “Optimal gainshare/painshare in alliance projects.” J. Oper. Res. Soc. 64 (8): 1269–1278. https://doi.org/10.1057/jors.2012.146.
Hosseinian, S. M., and D. G. Carmichael. 2014. “Optimum sharing in project delivery methods.” Int. J. Eng. Manage. Econ. 4 (2): 151–175. https://doi.org/10.1504/IJEME.2014.066586.
Ibbs, C. W., Y. H. Kwak, T. Ng, and A. M. Odabasi. 2003. “Project delivery systems and project change: Quantitative analysis.” J. Constr. Eng. Manage. 129 (4): 382–387. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:4(382).
Ikuabe, M., A. E. Oke, and C. Aigbavboa. 2020. “Impact of contractors’ opportunism on construction project transaction costs.” J. Financial Manage. Property Constr. 25 (1): 125–141. https://doi.org/10.1108/JFMPC-04-2019-0040.
Jobidon, G., P. Lemieux, and R. Beauregard. 2019. “Comparison of Quebec’s project delivery methods: Relational contract law and differences in contractual language.” Laws 8 (2): 9–22. https://doi.org/10.3390/laws8020009.
Kantola, M., and A. Saari. 2016. “Project delivery systems for nZEB projects.” Facilities 34 (1/2): 85–100. https://doi.org/10.1108/F-03-2014-0025.
Khwaja, N., W. J. O’Brien, M. Martinez, B. Sankaran, J. T. O’Connor, and W. “Bill” Hale. 2018. “Innovations in project delivery method selection approach in the Texas Department of Transportation.” J. Manage. Eng. 34 (6): 05018010. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000645.
Kline, R. B. 2015. Principles and practice of structural equation modeling. New York: Guilford Publications.
Koksal, A., and D. Arditi. 2004. “Predicting construction company decline.” J. Constr. Eng. Manage. 130 (6): 799–807. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:6(799).
Konchar, M., and V. Sanvido. 1998. “Comparison of US project delivery systems.” J. Constr. Eng. Manage. 124 (6): 435–444. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:6(435).
Lahdenperä, P. 2012. “Making sense of the multi-party contractual arrangements of project partnering, project alliancing and integrated project delivery.” Construct. Manage. Econ. 30 (1): 57–79. https://doi.org/10.1080/01446193.2011.648947.
Lance, C. E., M. M. Butts, and L. C. Michels. 2006. “The sources of four commonly reported cutoff criteria: What did they really say?” Organ. Res. Methods 9 (2): 202–220. https://doi.org/10.1177/1094428105284919.
Li, H., D. Arditi, and Z. Wang. 2013. “Factors that affect transaction costs in construction projects.” J. Constr. Eng. Manage. 139 (1): 60–68. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000573.
Ling, F. Y., Y. Ke, M. M. Kumaraswamy, and S. Wang. 2014. “Key relational contracting practices affecting performance of public construction projects in China.” J. Constr. Eng. Manage. 140 (1): 04013034. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000781.
Lu, P., S. Guo, L. Qian, P. He, and X. Xu. 2015. “The effectiveness of contractual and relational governances in construction projects in China.” Int. J. Project Manage. 33 (1): 212–222. https://doi.org/10.1016/j.ijproman.2014.03.004.
Lynch, T. D. 1996. “A transaction cost framework for evaluating construction project organizations.” Ph.D. thesis, Dept. of Architectural Engineering, Pennsylvania State Univ.
Macneil, I. R. 1980. The new social contract. New Haven, CT: Yale Univ. Press.
Mafakheri, F., L. Dai, D. Slezak, and F. Nasiri. 2007. “Project delivery system selection under uncertainty: Multicriteria multilevel decision aid model.” J. Manage. Eng. 23 (4): 200–206. https://doi.org/10.1061/(ASCE)0742-597X(2007)23:4(200).
Mahdi, I. M., and K. Alreshaid. 2005. “Decision support system for selecting the proper project delivery method using analytical hierarchy process (AHP).” Int. J. Project Manage. 23 (7): 564–572. https://doi.org/10.1016/j.ijproman.2005.05.007.
Malone, T. W., J. Yates, and R. I. Benjamin. 1987. “Electronic markets and electronic hierarchies.” Commun. ACM 30 (6): 484–497. https://doi.org/10.1145/214762.214766.
Matthews, O., and G. A. Howell. 2005. “Integrated project delivery: An example of relational contracting.” Lean Constr. J. 2 (1): 46–61.
Minchin, R. E., Jr., X. Li, R. R. Issa, and G. G. Vargas. 2013. “Comparison of cost and time performance of design-build and design-bid-build delivery systems in Florida.” J. Constr. Eng. Manage. 139 (10): 04013007. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000746.
Mollaoglu-Korkmaz, S., L. Swarup, and D. Riley. 2013. “Delivering sustainable, high-performance buildings: Influence of project delivery methods on integration and project outcomes.” J. Manage. Eng. 29 (1): 71–78. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000114.
Mostafavi, A., and M. Karamouz. 2010. “Selecting appropriate project delivery system: Fuzzy approach with risk analysis.” J. Constr. Eng. Manage. 136 (8): 923–930. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000190.
Nguyen, D. A., and M. J. Garvin. 2019. “Life-cycle contract management strategies in US highway public–private partnerships: Public control or concessionaire empowerment?” J. Manage. Eng. 35 (4): 04019011. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000687.
Nguyen, P. H., D. Q. Tran, and B. C. Lines. 2020. “Empirical inference system for highway project delivery selection using fuzzy pattern recognition.” J. Constr. Eng. Manage. 146 (12): 04020141. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001950.
Ning, Y., and F. Y. Y. Ling. 2014. “Boosting public construction project outcomes through relational transactions.” J. Constr. Eng. Manage. 140 (1): 04013037. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000780.
Noorderhaven, N. G. 1994. “Transaction cost analysis and the explanation of hybrid vertical interfirm relations.” Rev. Political Econ. 6 (1): 19–36. https://doi.org/10.1080/09538259400000002.
Oyetunji, A. A., and S. D. Anderson. 2006. “Relative effectiveness of project delivery and contract strategies.” J. Constr. Eng. Manage. 132 (1): 3–13. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:1(3).
Park, J., and Y. H. Kwak. 2017. “Design-bid-build (DBB) vs. design-build (DB) in the US public transportation projects: The choice and consequences.” Int. J. Project Manage. 35 (3): 280–295. https://doi.org/10.1016/j.ijproman.2016.10.013.
Peduzzi, P., J. Concato, E. Kemper, T. R. Holford, and A. R. Feinstein. 1996. “A simulation study of the number of events per variable in logistic regression analysis.” J. Clin. Epidemiol. 49 (12): 1373–1379. https://doi.org/10.1016/S0895-4356(96)00236-3.
Pesämaa, O., P. E. Eriksson, and J. F. Hair. 2009. “Validating a model of cooperative procurement in the construction industry.” Int. J. Project Manage. 27 (6): 552–559. https://doi.org/10.1016/j.ijproman.2008.10.007.
Poppo, L., K. Z. Zhou, and S. Ryu. 2008. “Alternative origins to interorganizational trust: An interdependence perspective on the shadow of the past and the shadow of the future.” Organ. Sci. 19 (1): 39–55. https://doi.org/10.1287/orsc.1070.0281.
Puddicombe, M. S. 2009. “Why contracts: Evidence.” J. Constr. Eng. Manage. 135 (8): 675–682. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:8(675).
Rajeh, M., J. E. Tookey, and J. O. B. Rotimi. 2015a. “Estimating transaction costs in the New Zealand construction procurement: A structural equation modelling methodology.” Eng. Constr. Archit. Manage. 22 (2): 242–267. https://doi.org/10.1108/ECAM-10-2014-0130.
Rajeh, M. A., J. E. Tookey, and J. O. B. Rotimi. 2015b. “Developing a procurement path determination chart SEM-based approach.” Construct. Manage. Econ. 33 (11–12): 921–941. https://doi.org/10.1080/01446193.2016.1151538.
Reve, T., and R. E. Levitt. 1984. “Organization and governance in construction.” Int. J. Project Manage. 2 (1): 17–25. https://doi.org/10.1016/0263-7863(84)90054-1.
Riley, D. R., B. E. Diller, and D. Kerr. 2005. “Effects of delivery systems on change order size and frequency in mechanical construction.” J. Constr. Eng. Manage. 131 (9): 953–962. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:9(953).
Rindfleisch, A., and J. B. Heide. 1997. “Transaction cost analysis: Past, present, and future applications.” J. Marketing 61 (4): 30–54. https://doi.org/10.1177/002224299706100403.
Rojas, E. M., and I. Kell. 2008. “Comparative analysis of project delivery systems cost performance in Pacific Northwest public schools.” J. Constr. Eng. Manage. 134 (6): 387–397. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:6(387).
Shah, H. A., and S. A. Kalaian. 2009. “Which is the best parametric statistical method for analyzing Delphi data?” J. Mod. Appl. Stat. Methods 8 (1): 226–232. https://doi.org/10.22237/jmasm/1241137140.
Sullivan, J., M. E. Asmar, J. Chalhoub, and H. Obeid. 2017. “Two decades of performance comparisons for design-build, construction manager at risk, and design-bid-build: Quantitative analysis of the state of knowledge on project cost, schedule, and quality.” J. Constr. Eng. Manage. 143 (6): 04017009. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001282.
Touran, A., D. D. Gransberg, K. R. Molenaar, and K. Ghavamifar. 2011. “Selection of project delivery method in transit: Drivers and objectives.” J. Manage. Eng. 27 (1): 21–27. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000027.
Tran, D. Q., G. Diraviam, and R. E. Minchin Jr. 2018. “Performance of highway design-bid-build and design-build projects by work types.” J. Constr. Eng. Manage. 144 (2): 04017112. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001437.
Walker, A., and C. Kwong Wing. 1999. “The relationship between construction project management theory and transaction cost economics.” Eng. Constr. Archit. Manage. 6 (2): 166–176. https://doi.org/10.1108/eb021109.
Wang, Y., Y. Chen, Y. Fu, and W. Zhang. 2017. “Do prior interactions breed cooperation in construction projects? The mediating role of contracts.” Int. J. Project Manage. 35 (4): 633–646. https://doi.org/10.1016/j.ijproman.2017.02.019.
Whittington, J. M. 2008. The transaction cost economics of highway project delivery: Design-build contracting in three states. Berkeley, CA: Univ. of California, Berkeley.
Williamson, O. E. 1983. “Credible commitments: Using hostages to support exchange.” Am. Econ. Rev. 73 (4): 519–540.
Williamson, O. E. 1985. The economic institutions of capitalism. New York: Free Press.
Williamson, O. E. 1991. “Comparative economic organization: The analysis of discrete structural alternatives.” Administrative Sci. Q. 36 (2): 269–296. https://doi.org/10.2307/2393356.
Williamson, O. E. 1996. The mechanisms of governance. Oxford, UK: Oxford University Press.
Williamson, O. E. 1998. “Transaction cost economics: How it works; where it is headed.” De Economist 146 (1): 23–58. https://doi.org/10.1023/A:1003263908567.
Winch, G. 1989. “The construction firm and the construction project: A transaction cost approach.” Construct. Manage. Econ. 7 (4): 331–345. https://doi.org/10.1080/01446198900000032.
Winch, G. M. 2001. “Governing the project process: A conceptual framework.” Construct. Manage. Econ. 19 (8): 799–808. https://doi.org/10.1080/01446190110074264.
Winch, G. M. 2006. “The governance of project coalitions–towards a research agenda.” In Commer. Manage. Project: Defining the discipline, edited by D. Lowe and R. Leiringer, 324–343. Hoboken, NJ: Blackwell Publishing.
You, W., Y. Chen, Y. Gao, and J. You. 2020. “Understanding the relationship between environmental uncertainty and transaction costs in construction projects: Moderating roles of prior cooperation experience and intragroup transactions.” J. Manage. Eng. 36 (6): 04020087. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000854.
Yu, T., G. Q. Shen, and Q. Shi. 2017. “Comparing the performance quality of design-bid-build and design-build delivery methods.” J. Constr. Eng. Manage. 143 (4): 04016111. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001262.
Zajac, E. J., and C. P. Olsen. 1993. “From transaction cost to transactional value analysis: Implications for the study of interorganizational strategies.” J. Manage. Stud. 30 (1): 131–145. https://doi.org/10.1111/j.1467-6486.1993.tb00298.x.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 149Issue 1January 2023

History

Received: Oct 16, 2021
Accepted: Aug 12, 2022
Published online: Oct 31, 2022
Published in print: Jan 1, 2023
Discussion open until: Mar 31, 2023

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

S. Mahdi Hosseinian [email protected]
Associate Professor, Dept. of Civil Engineering, School of Engineering, Bu-Ali Sina Univ., Iran (corresponding author). Email: [email protected]
Mehran Tavakoli
Dept. of Civil Engineering, School of Engineering, Bu-Ali Sina Univ., Hamedan 65178-38695, Iran.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Decision-Making Model for Evaluating Joint Venture Contractors in Construction of Complex Infrastructure Megaprojects, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-13374, 149, 9, (2023).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share