Quality Failures–Based Critical Cost Impact Factors: Logistic Regression Analysis

Publication: Journal of Construction Engineering and Management
Volume 148, Issue 12

Abstract

Due to the various dynamic conditions of construction sites, quality failures have become part and parcel of the industry. Many studies have identified the causal factors of construction site quality failures and their cost impacts. However, limited studies have been made evaluating the domino effects of these on one another and the correlation between the cost impact and frequency of each attribute. In this study, made in the context of ongoing research into related artificial intelligence (AI)–based predictive models, a total of 2,527 nonconformance reports (NCRs) collected from 59 construction projects within the scope of a previous study were analyzed using the Delphi method and logistic regression analysis. According to the Delphi results, 25 critical cost impact factors were refined and categorized into five main groups: Materials, Design, Installation, Operation, and Process. Then, five main hypotheses were developed to test each attribute’s cost impact and interaction by logistic regression. The results showed that although some attributes (from the Materials and Operation groups) have a significant impact on the cost of quality if observed in a failure report individually, others may become a critical cost-impact factor when interacting with other attributes. No significant correlation was observed between the frequency and cost impact of the attributes. Finally, a holistically based quality control system that considers the domino effects of causal factors from planning to operation was proposed for construction practitioners to reduce quality failures causing cost and time overruns.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or codes that support the findings of this study are available from the corresponding author upon reasonable request.

Acknowledgments

The authors would like to thank the experts who participated in the Delphi process for their efforts and companies that provided data anonymously for their contributions.

References

Abdelsalam, H. M. E., and M. M. Gad. 2009. “Cost of quality in Dubai: An analytical case study of residential construction projects.” Int. J. Project Manage. 27 (5): 501–511. https://doi.org/10.1016/j.ijproman.2008.07.006.
Al-Hazim, N., Z. A. Salem, and H. Ahmad. 2017. “Delay and cost overrun in infrastructure projects in Jordan.” Procedia Eng. 2017 (Mar): 18–24. https://doi.org/10.1016/j.proeng.2017.03.105.
Alnuaimi, A. S., R. A. Taha, M. Al Mohsin, and A. S. Al-Harthi. 2009. “Causes, effects, benefits, and remedies of change orders on public construction projects in Oman.” J. Constr. Eng. Manage. 136 (5): 615–622. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000154.
Ayhan, B. U., and O. B. Tokdemir. 2018. “Predicting the outcome of construction incidents.” Saf. Sci. 113 (Nov): 91–104. https://doi.org/10.1016/j.ssci.2018.11.001.
Bagaya, O., and J. Song. 2016. “Empirical study of factors influencing schedule delays of public construction projects in Burkina Faso.” J. Manage. Eng. 32 (5): 05016014. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000443.
Balouchi, M., M. Gholhaki, and A. Niousha. 2019. “Reworks causes and related costs in construction: Case of Parand mass housing project in Iran.” Int. J. Quality Reliab. Manage. 36 (8): 1392–1408. https://doi.org/10.1108/IJQRM-06-2018-0155.
Barber, P., A. Graves, M. Hall, D. Sheath, and C. Tomkins. 2000. “Quality failure costs in civil engineering projects.” Int. J. Quality Reliab. Manage. 17 (4): 479–492. https://doi.org/10.1108/02656710010298544.
Burati, J. L., J. J. Farrington, and W. B. Ledbetter. 1992. “Causes of quality deviations in design and construction.” J. Constr. Eng. Manage. 118 (1): 34–49. https://doi.org/10.1061/(ASCE)0733-9364(1992)118:1(34).
Doğan, N. B. 2021. Predicting the cost impacts of construction nonconformities using CBR-AHP and CBR-GA models. Ankara, Turkey: Middle East Technical Univ.
Doloi, H. 2012. “Cost overruns and failure in project management: Understanding the roles of key stakeholders in construction projects.” J. Constr. Eng. Manage. 139 (3): 267–279. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000621.
Feigenbaum, A. V. 1983. Total quality control, 3rd ed. New York: McGraw-Hill.
Feld, J., and K. Carper. 1997. Construction failure. Vol. 78 of Wiley Series of Practical Construction Guides. New York: John Wiley & Sons.
Forcada, N., M. Gangolells, M. Casals, and M. Macarulla. 2017. “Factors affecting rework costs in construction.” J. Constr. Eng. Manage. 143 (8): 04017032. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001324.
Heravi, G., and A. Jafari. 2014. “Cost of quality evaluation in mass-housing projects in developing countries.” J. Constr. Eng. Manage. 140 (5): 04014004. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000837.
Hwang, B.-G., S. R. Thomas, C. T. Haas, and C. H. Caldas. 2009. “Measuring the impact of rework on construction cost performance.” J. Constr. Eng. Manage. 135 (3): 187–198. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:3(187).
Jafari, A., and P. E. D. Love. 2013. “Quality costs in construction: Case of Qom monorail project in Iran.” J. Constr. Eng. Manage. 139 (9): 1244–1249. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000704.
Josephson, P. E., and Y. Hammarlund. 1999. “Causes and costs of defects in construction: A study of seven building projects.” Autom. Constr. 8 (6): 681–687. https://doi.org/10.1016/S0926-5805(98)00114-9.
Larsen, J. K., G. Q. Shen, S. M. Lindhard, and T. D. Brunoe. 2015. “Factors affecting schedule delay, cost overrun, and quality level in public construction projects.” J. Manage. Eng. 32 (1): 04015032. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000391.
Liu, Q., G. Ye, Y. Feng, C. Wang, and Y. Peng. 2018. “Case-based insights into rework costs of residential building projects in China.” Int. J. Constr. Manage. 20 (4): 347–355. https://doi.org/10.1080/15623599.2018.1484856.
Love, P., and D. J. Edwards. 2007. “Forensic project management: The underlying causes of rework in construction projects.” Civ. Eng. Environ. Syst. 21 (3): 207–228. https://doi.org/10.1080/10286600412331295955.
Love, P. E. D., and D. J. Edwards. 2004. Determinants of rework in building construction projects. Bingley, UK: Emerald Group Publishing.
Love, P. E. D., D. J. Edwards, H. Watson, and P. Davis. 2010. “Rework in civil infrastructure projects: Determination of cost predictors.” J. Constr. Eng. Manage. 136 (3): 275–282. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000136.
Love, P. E. D., and Z. Irani. 2002. “A project management quality cost information system for the construction industry.” Inf. Manage. 40 (7): 649–661. https://doi.org/10.1016/S0378-7206(02)00094-0.
Love, P. E. D., P. Teo, and J. Morrison. 2017. “Revisiting quality failure costs in construction.” J. Constr. Eng. Manage. 144 (2): 05017020. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001427.
Peng, C. Y. J., K. L. Lee, and G. M. Ingersoll. 2010. “An introduction to logistic regression analysis and reporting.” J. Educ. Res. 96 (1): 3–14. https://doi.org/10.1080/00220670209598786.
Petrucci, C. J. 2009. “A primer for social worker researchers on how to conduct a multinomial logistic regression.” J. Soc. Service Res. 35 (2): 193–205. https://doi.org/10.1080/01488370802678983.
Senaviratna, N. A. M. R., and T. M. J. A. Cooray. 2019. “Diagnosing multicollinearity of logistic regression model.” Asian J. Probab. Stat. 5 (2): 1–9.
Senouci, A., A. Alsarraj, M. Gunduz, and N. Eldin. 2016. “Analysis of change orders in Qatari construction projects.” Int. J. Constr. Manage. 17 (4): 280–292. https://doi.org/10.1080/15623599.2016.1211973.
Starkweather, J., and A. K. Moske. 2011. “Multinomial logistic regression.” Accessed August 1, 2011. https://it.unt.edu/sites/default/files/mlr_jds_aug2011.pdf.
Vatcheva, P., M. Lee, J. B. McCormick, and M. H. Rahbar. 2016. “Multicollinearity in regression analyses conducted in epidemiologic studies.” Epidemiol. Open Access (Sunnyvale) 6 (2): 16.
Wang, L., R. Huang, W. Shi, and C. Zhang. 2021. “Domino effect in marine accidents: Evidence from temporal association rules.” Transp. Policy 103 (5): 236–244. https://doi.org/10.1016/j.tranpol.2021.02.006.
Yang, Y., G. Chen, and P. Chen. 2018. “The probability prediction method of domino effect triggered by lightning in chemical tank farm.” Process Saf. Environ. Prot. 116 (Feb): 106–114. https://doi.org/10.1016/j.psep.2018.01.019.
Yap, J. B. H., P. L. Low, and C. Wang. 2017. “Rework in Malaysian building construction: Impacts, causes and potential solutions.” J. Eng. Des. Technol. 15 (5): 591–618. https://doi.org/10.1108/JEDT-01-2017-0002.
Ye, G., Z. Jin, B. Xia, and M. Skitmore. 2014. “Analyzing causes for reworks in construction projects in China.” J. Manage. Eng. 31 (6): 04014097. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000347.
Yehiel, R. 2013. “Root-cause analysis of construction-cost overruns.” J. Constr. Eng. Manage. 140 (Jan): 04013039. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000789.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 148Issue 12December 2022

History

Received: Dec 15, 2021
Accepted: Jul 25, 2022
Published online: Oct 14, 2022
Published in print: Dec 1, 2022
Discussion open until: Mar 14, 2023

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Gokhan Kazar [email protected]
Assistant Professor, Dept. of Civil Engineering, Istanbul Gelisim Univ., Istanbul 34310, Turkey. Email: [email protected]
Neşet Berkay Doğan [email protected]
Graduate Student, Dept. of Civil Engineering, Middle East Technical Univ., Ankara 06800, Turkey. Email: [email protected]
Bilal Umut Ayhan [email protected]
Graduate Student, Dept. of Civil Engineering, Middle East Technical Univ., Ankara 06800, Turkey. Email: [email protected]
Associate Professor, Dept. of Civil Engineering, Istanbul Technical Univ., Istanbul 34469, Turkey (corresponding author). ORCID: https://orcid.org/0000-0002-4101-8560. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Predicting the Cost of Rework in High-Rise Buildings Using Graph Convolutional Networks, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-14739, 150, 8, (2024).
  • Predicting Cost Impacts of Nonconformances in Construction Projects Using Interpretable Machine Learning, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-13857, 150, 1, (2024).
  • Benchmarking of construction projects performance for comparative assessment and performance improvement: a statistical quantitative approach, Engineering, Construction and Architectural Management, 10.1108/ECAM-06-2022-0552, (2023).
  • Multiedge Graph Convolutional Network for House Price Prediction, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-13559, 149, 11, (2023).
  • A Data-Driven Recommendation System for Construction Safety Risk Assessment, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-13437, 149, 12, (2023).
  • Comprehensive Root Cause Analysis of Construction Defects Using Semisupervised Graph Representation Learning, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-13435, 149, 9, (2023).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share