Holistic Study and Analysis of Factors Affecting Collaborative Planning in Construction

Publication: Journal of Construction Engineering and Management
Volume 147, Issue 4

Abstract

The fragmentation of the construction industry led to the development of innovative approaches including collaborative planning, relational contracting, integrated project delivery, advancements in technology, and lean construction. Existing research focused on certain aspects of collaborative planning without providing a comprehensive analysis of the factors affecting collaboration. To this end, the goal of this paper is to provide a holistic list of factors affecting collaborative planning in the construction industry and guiding future research needs. This study followed an interrelated research methodology. As such, the authors (1) conducted an extensive review and analysis of the literature on collaboration and collaborative planning in the construction industry within the last 30 years, (2) identified and defined the factors impacting the effectiveness of construction collaborative planning, (3) performed social network analysis (SNA) to quantify the importance and impact of each of the identified factors and verified the output using a simple analytic method, and (4) highlighted the gaps in the literature and created a roadmap for the factors that need further investigation. Consequently, this study provides substantial addition to the body of knowledge at multifacets. To this effect, the results include (1) presenting 50 factors that could collectively affect collaborative planning in construction projects; (2) indicating that future research endeavors need to investigate the understudied key factors for collaborative planning comprising vision, goal alignment and integration, early involvement of key project stakeholders, project parties relationship, and willingness for collaboration and cooperation; and (3) substantiating the need to develop models that simultaneously incorporate all 50 factors to have simulation environment that is as close as possible to reality. Ultimately, this research provides a foundation for a broader and more holistic framework to further advance the utilization of collaborative planning in the construction industry.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data, models, and code generated or used during the study appear in the published article.

Acknowledgments

This study was conducted through the financial support provided by the Missouri Consortium for Construction Innovation (MO-CCI) as represented by its member companies including McCarthy Building Companies, Brinkman Constructors, Arco Construction, Clayco, BJC Healthcare, Alberici, and Greensfelder.

References

Abdirad, H., and C. S. Dossick. 2019. “Restructuration of architectural practice in integrated project delivery (IPD): Two case studies.” Eng. Const. Archit. Manage. 26 (1): 104–117. https://doi.org/10.1108/ECAM-05-2018-0196.
Abotaleb, I. S., and I. H. El-Adaway. 2018. “Managing construction projects through dynamic modeling: Reviewing the existing body of knowledge and deriving future research directions.” J. Manage. Eng. 34 (6): 04018033. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000633.
Adegbembo, T. F., O. P. Bamisaye, and D. O. Aghimien. 2016. “Assessment of lean construction practice in the Nigerian construction industry.” In Proc., Joint Int. Conf. (JIC), on 21st Century Habitat: Issues, Sustainability and Development, 21–24. Akure, Nigeria: Federal Univ. of Technology.
Ahuja, V., J. Yang, M. Skitmore, and R. Shankar. 2010. “An empirical test of causal relationships of factors affecting ICT adoption for building project management: An Indian SME case study.” Constr. Innovation 10 (2): 164–180. https://doi.org/10.1108/14714171011037174.
Akintoye, A., and J. Main. 2007. “Collaborative relationships in construction: The UK contractors’ perception.” Eng. Constr. Archit. Manage. 14 (6): 597–617. https://doi.org/10.1108/09699980710829049.
AlSehaimi, A. O., P. T. Fazenda, and L. Koskela. 2014. “Improving construction management practice with the last planner system: A case study.” Eng. Constr. Archit. Manage. 21 (1): 51–64. https://doi.org/10.1108/ECAM-03-2012-0032.
Alshawi, M., and I. Faraj. 2002. “Integrated construction environments: Technology and implementation.” Accessed February 14, 2020. https://www.ingentaconnect.com/content/mcb/ci/2002/00000002/00000001/art00004.
Anderson, S., J. S. Shane, and C. Schexnayder. 2011. “Strategies for planned project acceleration.” J. Constr. Eng. Manage. 137 (5): 372–381. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000289.
Anumba, C. J., J. Pan, R. R. A. Issa, and I. Mutis. 2008. “Collaborative project information management in a semantic web environment.” Eng. Constr. Archit. Manage. 15 (1): 78–94. https://doi.org/10.1108/09699980810842089.
Arnold, P., and A. Javernick-Will. 2013. “Projectwide access: Key to effective implementation of construction project management software systems.” J. Constr. Eng. Manage. 139 (5): 510–518. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000596.
Aspin, R. 2007. “Supporting collaboration, in colocated 3D visualization, through the use of remote personal interfaces.” J. Comput. Civ. Eng. 21 (6): 393–401. https://doi.org/10.1061/(ASCE)0887-3801(2007)21:6(393).
Assaad, R., and I. H. El-Adaway. 2020. “Enhancing the knowledge of construction business failure: A social network analysis approach.” J. Constr. Eng. Manage. 146 (6): 04020052. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001831.
Assaad, R., I. H. El-Adaway, and I. S. Abotaleb. 2020a. “Predicting project performance in the construction industry.” J. Constr. Eng. Manage. 146 (5): 04020030. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001797.
Assaad, R., A. Elsayegh, G. Ali, M. Abdul Nabi, and I. H. El-Adaway. 2020b. “Back-to-back relationship under standard subcontract agreements: Comparative study.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (3): 04520020. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000406.
Azari, R., and Y. W. Kim. 2016. “Integration evaluation framework for integrated design teams of green buildings: Development and validation.” J. Manage. Eng. 32 (3): 04015053. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000416.
Bresnen, M., and N. Marshall. 2000a. “Motivation, commitment and the use of incentives in partnerships and alliances.” Construct. Manage. Econ. 18 (5): 587–598. https://doi.org/10.1080/014461900407392.
Bresnen, M., and N. Marshall. 2000b. “Building partnerships: Case studies of clientcontractor collaboration in the UK construction industry.” Construct. Manage. Econ. 18 (7): 819–832. https://doi.org/10.1080/014461900433104.
Bröchner, J., and B. Grandinson. 1992. “R&D cooperation by Swedish contractors.” J. Constr. Eng. Manage. 118 (1): 3–16. https://doi.org/10.1061/(ASCE)0733-9364(1992)118:1(3).
Chan, S.-L., and N.-N. Leung. 2004. “Prototype web-based construction project management system.” J. Constr. Eng. Manage. 130 (6): 935–943. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:6(935).
Chang, C.-Y., W. Pan, and R. Howard. 2017. “Impact of building information modeling implementation on the acceptance of integrated delivery systems: Structural equation modeling analysis.” J. Constr. Eng. Manage. 143 (8): 04017044. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001335.
Chen, L., and K. Manley. 2014. “Validation of an instrument to measure governance and performance on collaborative infrastructure projects.” J. Constr. Eng. Manage. 140 (5): 04014006. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000834.
Chen, W. T., and T.-T. Chen. 2007. “Critical success factors for construction partnering in Taiwan.” Int. J. Proj. Manage. 25 (5): 475–484. https://doi.org/10.1016/j.ijproman.2006.12.003.
Choo, H. J., J. Hammond, I. D. Tommelein, S. A. Austin, and G. Ballard. 2004. “DePlan: A tool for integrated design management.” Autom. Constr. 13 (3): 313–326. https://doi.org/10.1016/j.autcon.2003.09.012.
Choo, H. J., I. D. Tommelein, G. Ballard, and T. R. Zabelle. 1999. “WorkPlan: Constraint-based database for work package scheduling.” J. Constr. Eng. Manage. 125 (3): 151–160. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:3(151).
Choudhury, N., and S. Uddin. 2016. “Time-aware link prediction to explore network effects on temporal knowledge evolution.” Scientometrics 108 (2): 745–776. https://doi.org/10.1007/s11192-016-2003-5.
Chua, D. K. H., L. J. Shen, and S. H. Bok. 2003a. “Constraint-based planning with integrated production scheduler over internet.” J. Constr. Eng. Manage. 129 (3): 293–301. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:3(293).
Chua, D. K. H., A. Tyagi, S. Ling, and S. H. Bok. 2003b. “Process-parameter-interface model for design management.” J. Constr. Eng. Manage. 129 (6): 653–663. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:6(653).
Costa, F., A. Denis Granja, A. Fregola, F. Picchi, and A. Portioli Staudacher. 2019. “Understanding relative importance of barriers to improving the customer–supplier relationship within construction supply chains using DEMATEL technique.” J. Manage. Eng. 35 (3): 04019002. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000680.
Dainty, A., D. Moore, and M. Murray. 2006. Communication in construction: Theory and practice. London: Taylor & Francis.
Daniel, E., P. Christine, and G. Dickens. 2019. “Development of approach to support construction stakeholders in implementation of the last planner system.” J. Manage. Eng. 35 (5): 04019018. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000699.
Daniel, E. I., C. Pasquire, G. Dickens, and H. G. Ballard. 2017. “The relationship between the last planner® system and collaborative planning practice in UK construction.” Eng. Constr. Archit. Manage. 24 (3): 407–425. https://doi.org/10.1108/ECAM-07-2015-0109.
Deep, S., T. Gajendran, and M. Jefferies. 2019. “A systematic review of ‘enablers of collaboration’ among the participants in construction projects.” Int. J. Construct. Manage. 2019 (Mar): 1–13. https://doi.org/10.1080/15623599.2019.1596624.
Di Marco, M. K., J. E. Taylor, and P. Alin. 2010. “Emergence and role of cultural boundary spanners in global engineering project networks.” J. Manage. Eng. 26 (3): 123–132. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000019.
Drexler, J. A., and E. W. Larson. 2000. “Partnering: Why project owner-contractor relationships change.” J. Constr. Eng. Manage. 126 (4): 293–297. https://doi.org/10.1061/(ASCE)0733-9364(2000)126:4(293).
El-Adaway, I. H., G. Ali, R. Assaad, A. Elsayegh, and I. S. Abotaleb. 2019. “Analytic overview of citation metrics in the civil engineering domain with focus on construction engineering and management specialty area and its subdisciplines.” J. Constr. Eng. Manage. 145 (10): 04019060. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001705.
Elghaish, F., S. Abrishami, S. A. Samra, M. Gaterell, M. R. Hosseini, and R. Wise. 2019. “Cash flow system development framework within integrated project delivery (IPD) using BIM tools.” Int. J. Constr. Manage. 2019 (Mar): 1–16. https://doi.org/10.1080/15623599.2019.1573477.
El-Gohary, N. M., and T. E. El-Diraby. 2010. “Dynamic knowledge-based process integration portal for collaborative construction.” J. Constr. Eng. Manage. 136 (3): 316–328. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000147.
El-Sabek, L. M., and B. Y. McCabe. 2018. “Framework for managing integration challenges of last planner system in IMPs.” J. Constr. Eng. Manage. 144 (5): 04018022. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001468.
Enegbuma, W. I., U. G. Aliagha, and K. N. Ali. 2014. “Preliminary building information modelling adoption model in Malaysia: A strategic information technology perspective.” Constr. Innovation 14 (4): 408–432. https://doi.org/10.1108/CI-01-2014-0012.
Erdogan, B., C. J. Anumba, D. Bouchlaghem, and Y. Nielsen. 2008. “Collaboration environments for construction: Implementation case studies.” J. Manage. Eng. 24 (4): 234–244. https://doi.org/10.1061/(ASCE)0742-597X(2008)24:4(234).
Erdogan, B., C. J. Anumba, D. Bouchlaghem, and Y. Nielsen. 2014. “Collaboration environments for construction: Management of organizational changes.” J. Manage. Eng. 30 (3): 04014002. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000231.
Eriksson, P. E., B. Atkin, and T. Nilsson. 2009. “Overcoming barriers to partnering through cooperative procurement procedures.” Eng. Constr. Archit. Manage. 16 (6): 598–611. https://doi.org/10.1108/09699980911002593.
Ey, W., J. Zuo, and S. Han. 2014. “Barriers and challenges of collaborative procurements: An exploratory study.” Int. J. Constr. Manage. 14 (3): 148–155. https://doi.org/10.1080/15623599.2014.922725.
Faris, H., M. Gaterell, and D. Hutchinson. 2019. “Investigating underlying factors of collaboration for construction projects in emerging economies using exploratory factor analysis.” Int. J. Constr. Manage. 2019 (Jun): 1–13. https://doi.org/10.1080/15623599.2019.1635758.
Farnsworth, C. B., R. O. Warr, J. E. Weidman, and H. D. Mark. 2016. “Effects of CM/GC project delivery on managing process risk in transportation construction.” J. Constr. Eng. Manage. 142 (3): 04015091. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001091.
Franz, B., R. Leicht, K. Molenaar, and J. Messner. 2017. “Impact of team integration and group cohesion on project delivery performance.” J. Constr. Eng. Manage. 143 (1): 04016088. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001219.
Freeman, L. C. 1978. “Centrality in social networks conceptual clarification.” Social Networks 1 (3): 215–239. https://doi.org/10.1016/0378-8733(78)90021-7.
González, V., L. F. Alarcón, S. Maturana, F. Mundaca, and J. Bustamante. 2010. “Improving planning reliability and project performance using the reliable commitment model.” J. Constr. Eng. Manage. 136 (10): 1129–1139. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000215.
Greenwood, D., and S. Wu. 2012. “Establishing the association between collaborative working and construction project performance based on client and contractor perceptions.” Construct. Manage. Econ. 30 (4): 299–308. https://doi.org/10.1080/01446193.2012.666801.
Guo, H. L., H. Li, and M. Skitmore. 2010. “Life-cycle management of construction projects based on virtual prototyping technology.” J. Manage. Eng. 26 (1): 41–47. https://doi.org/10.1061/(ASCE)0742-597X(2010)26:1(41).
Hall, D. M., A. Algiers, and R. E. Levitt. 2018. “Identifying the role of supply chain integration practices in the adoption of systemic innovations.” J. Manage. Eng. 34 (6): 04018030. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000640.
Hamzeh, F. R., I. Saab, I. D. Tommelein, and G. Ballard. 2015a. “Understanding the role of ‘tasks anticipated’ in lookahead planning through simulation.” Autom. Constr. 49 (Jan): 18–26. https://doi.org/10.1016/j.autcon.2014.09.005.
Hamzeh, F. R., E. Zankoul, and C. Rouhana. 2015b. “How can ‘tasks made ready’ during lookahead planning impact reliable workflow and project duration?” Construct. Manage. Econ. 33 (4): 243–258. https://doi.org/10.1080/01446193.2015.1047878.
Hanna, A. S. 2016. “Benchmark performance metrics for integrated project delivery.” J. Constr. Eng. Manage. 142 (9): 04016040. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001151.
Hastie, J., M. Sutrisna, and C. Egbu. 2017. “Modelling knowledge integration process in early contractor involvement procurement at tender stage—A Western Australian case study.” Constr. Innovation 17 (4): 429–456. https://doi.org/10.1108/CI-04-2016-0021.
Hauck, A. J., D. H. T. Walker, K. D. Hampson, and R. J. Peters. 2004. “Project alliancing at national museum of Australia—Collaborative process.” J. Constr. Eng. Manage. 130 (1): 143–152. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:1(143).
Heigermoser, D., B. García de Soto, E. L. S. Abbott, and D. K. H. Chua. 2019. “BIM-based last planner system tool for improving construction project management.” Autom. Constr. 104 (Aug): 246–254. https://doi.org/10.1016/j.autcon.2019.03.019.
Herazo, B., and G. Lizarralde. 2015. “The influence of green building certifications in collaboration and innovation processes.” Construct. Manage. Econ. 33 (4): 279–298. https://doi.org/10.1080/01446193.2015.1047879.
Hughes, D., T. Williams, and Z. Ren. 2012. “Differing perspectives on collaboration in construction.” Constr. Innovation 12 (3): 355–368. https://doi.org/10.1108/14714171211244613.
Ibrahim, C., I. C. Khairil, S. B. Costello, and S. Wilkinson. 2013. “Development of a conceptual team integration performance index for alliance projects.” Construct. Manage. Econ. 31 (11): 1128–1143. https://doi.org/10.1080/01446193.2013.854399.
Ibrahim, C. K. I. C., S. B. Costello, and S. Wilkinson. 2015. “Establishment of quantitative measures for team integration assessment in alliance projects.” J. Manage. Eng. 31 (5): 04014075. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000318.
Ibrahim, C. K. I. C., S. B. Costello, and S. Wilkinson. 2018. “Making sense of team integration practice through the ‘lived experience’ of alliance project teams.” Eng. Constr. Archit. Manage. 25 (5): 598–622. https://doi.org/10.1108/ECAM-09-2016-0208.
Isikdag, U., and J. Underwood. 2010. “Two design patterns for facilitating building information model-based synchronous collaboration.” Autom. Constr. 19 (5): 544–553. https://doi.org/10.1016/j.autcon.2009.11.006.
Jergeas, G., and J. V. der. Put. 2001. “Benefits of constructability on construction projects.” J. Constr. Eng. Manage. 127 (4): 281–290. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:4(281).
Kang, J. H., S. D. Anderson, and M. J. Clayton. 2007. “Empirical study on the merit of web-based 4D visualization in collaborative construction planning and scheduling.” J. Constr. Eng. Manage. 133 (6): 447–461. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:6(447).
Karlsson, M., A. Lakka, K. Sulankivi, A. S. Hanna, and B. P. Thompson. 2008. “Best practices for integrating the concurrent engineering environment into multi partner project management.” J. Constr. Eng. Manage. 134 (4): 289–299. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:4(289).
Kent, D. C., and B. Becerik-Gerber. 2010. “Understanding construction industry experience and attitudes toward integrated project delivery.” J. Constr. Eng. Manage. 136 (8): 815–825. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000188.
Kokkonen, A., and A. L. Vaagaasar. 2018. “Managing collaborative space in multi-partner projects.” Construct. Manage. Econ. 36 (2): 83–95. https://doi.org/10.1080/01446193.2017.1347268.
Koolwijk, J. S. J., C. J. van Oel, J. W. F. Wamelink, and R. Vrijhoef. 2018. “Collaboration and integration in project-based supply chains in the construction industry.” J. Manage. Eng. 34 (3): 04018001. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000592.
Koseoglu, O., M. Sakin, and Y. Arayici. 2018. “Exploring the BIM and lean synergies in the Istanbul Grand Airport construction project.” Eng. Constr. Archit. Manage. 25 (10): 1339–1354. https://doi.org/10.1108/ECAM-08-2017-0186.
Kumaraswamy, M. M., M. M. Rahman, F. Y. Ling, and S. T. Phng. 2005. “Reconstructing cultures for relational contracting.” J. Constr. Eng. Manage. 131 (10): 1065–1075. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:10(1065).
Laborde, M., and V. Sanvido. 1994. “Introducing new process technologies into construction companies.” J. Constr. Eng. Manage. 120 (3): 488–508. https://doi.org/10.1061/(ASCE)0733-9364(1994)120:3(488).
Lahdenperä, P. 2012. “Making sense of the multi-party contractual arrangements of project partnering, project alliancing and integrated project delivery.” Construct. Manage. Econ. 30 (1): 57–79. https://doi.org/10.1080/01446193.2011.648947.
Lai, H., X. Deng, and T.-Y. P. Chang. 2019. “BIM-based platform for collaborative building design and project management.” J. Comput. Civ. Eng. 33 (3): 05019001. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000830.
Leoto, R., and G. Lizarralde. 2019. “Challenges for integrated design (ID) in sustainable buildings.” Construct. Manage. Econ. 37 (11): 625–642. https://doi.org/10.1080/01446193.2019.1569249.
Liu, Y., S. Van Nederveen, and M. Hertogh. 2017. “Understanding effects of BIM on collaborative design and construction: An empirical study in China.” Int. J. Proj. Manage. 35 (4): 686–698. https://doi.org/10.1016/j.ijproman.2016.06.007.
Ma, X. Z., A. P. C. Chan, H. Q. Wu, F. Xiong, and N. Dong. 2018a. “Achieving leanness with BIM-based integrated data management in a built environment project.” 2018 (Oct): 1. https://doi.org/10.1108/CI-10-2017-0084.
Ma, Z., D. Zhang, and J. Li. 2018b. “A dedicated collaboration platform for integrated project delivery.” Autom. Constr. 86 (Feb): 199–209. https://doi.org/10.1016/j.autcon.2017.10.024.
Memon, S. A., B. H. W. Hadikusumo, and R. Y. Sunindijo. 2015. “Using social interaction theory to promote successful relational contracting between clients and contractors in construction.” J. Manage. Eng. 31 (6): 04014095. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000344.
Meng, X. 2012. “The effect of relationship management on project performance in construction.” Int. J. Proj. Manage. 30 (2): 188–198. https://doi.org/10.1016/j.ijproman.2011.04.002.
Meng, X., M. Sun, and M. Jones. 2011. “Maturity model for supply chain relationships in construction.” J. Manage. Eng. 27 (2): 97–105. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000035.
Merschbrock, C., M. R. Hosseini, I. Martek, M. Arashpour, and G. Mignone. 2018. “Collaborative role of sociotechnical components in BIM-based construction networks in two hospitals.” J. Manage. Eng. 34 (4): 05018006. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000605.
Mokhtar, A., C. Bédard, and P. Fazio. 2000. “Collaborative planning and scheduling of interrelated design changes.” J. Archit. Eng. 6 (2): 66–75. https://doi.org/10.1061/(ASCE)1076-0431(2000)6:2(66).
Oraee, M., M. R. Hosseini, D. J. Edwards, H. Li, E. Papadonikolaki, and D. Cao. 2019. “Collaboration barriers in BIM-based construction networks: A conceptual model.” Int. J. Proj. Manage. 37 (6): 839–854. https://doi.org/10.1016/j.ijproman.2019.05.004.
Osipova, E. 2015. “Establishing cooperative relationships and joint risk management in construction projects: Agency theory perspective.” J. Manage. Eng. 31 (6): 05014026. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000346.
Otte, E., and R. Rousseau. 2002. “Social network analysis: A powerful strategy, also for the information sciences.” J. Inf. Sci. 28 (6): 441–453. https://doi.org/10.1177/016555150202800601.
Ozorhon, B., I. Dikmen, and M. T. Birgonul. 2007. “Using analytic network process to predict the performance of international construction joint ventures.” J. Manage. Eng. 23 (3): 156–163. https://doi.org/10.1061/(ASCE)0742-597X(2007)23:3(156).
Palacios, J. L., V. Gonzalez, and L. F. Alarcón. 2014. “Selection of third-party relationships in construction.” J. Constr. Eng. Manage. 140 (4): B4013005. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000701.
Park, J., H. Cai, P. S. Dunston, and H. Ghasemkhani. 2017. “Database-supported and web-based visualization for daily 4D BIM.” J. Constr. Eng. Manage. 143 (10): 04017078. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001392.
Penã-Mora, F., and G. H. Dwivedi. 2002. “Multiple device collaborative and real time analysis system for project management in civil engineering.” J. Comput. Civ. Eng. 16 (1): 23–38. https://doi.org/10.1061/(ASCE)0887-3801(2002)16:1(23).
Pishdad-Bozorgi, P., R. B. Austin, and J. M. de la Garza. 2017. “Network analysis of flash-track practices.” J. Manage. Eng. 33 (1): 04016024. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000466.
Poirier, E., D. Forgues, and S. Staub-French. 2016. “Collaboration through innovation: Implications for expertise in the AEC sector.” Construct. Manage. Econ. 34 (11): 769–789. https://doi.org/10.1080/01446193.2016.1206660.
Priven, V., and R. Sacks. 2015. “Effects of the last planner system on social networks among construction trade crews.” J. Constr. Eng. Manage. 141 (6): 04015006. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000975.
Priven, V., and R. Sacks. 2016. “Impacts of the social subcontract and last planner system interventions on the trade-crew workflows of multistory residential construction projects.” J. Constr. Eng. Manage. 142 (7): 04016013. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001102.
Rahman, M. M., and M. M. Kumaraswamy. 2005. “Assembling integrated project teams for joint risk management.” Construct. Manage. Econ. 23 (4): 365–375. https://doi.org/10.1080/01446190500040083.
Ratajczak, J., C. P. Schimanski, C. Marcher, M. Riedl, and D. T. Matt. 2017. “Mobile application for collaborative scheduling and monitoring of construction works according to lean construction methods.” In Proc., Int. Conf. on Cooperative Design, Visualization and Engineering, 207–214. Berlin: Springer.
Ratajczak, J., C. P. Schimanski, C. Marcher, M. Riedl, and D. T. Matt. 2018. “Collaborative tool for the construction site to enhance lean project delivery.” In Proc., Int. Conf. on Cooperative Design, Visualization and Engineering, 192–199. Berlin: Springer.
Richey, R. G., F. G. Adams, and V. Dalela. 2012. “Technology and flexibility: Enablers of collaboration and time-based logistics quality.” J. Bus. Logist. 33 (1): 34–49. https://doi.org/10.1111/j.0000-0000.2011.01036.x.
Russell, M. M., M. Liu, G. Howell, and S. M. Hsiang. 2015. “Case studies of the allocation and reduction of time buffer through use of the last planner system.” J. Constr. Eng. Manage. 141 (2): 04014068. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000900.
Sacks, R., L. Koskela, B. A. Dave, and R. Owen. 2010a. “Interaction of lean and building information modeling in construction.” J. Constr. Eng. Manage. 136 (9): 968–980. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000203.
Sacks, R., M. Radosavljevic, and R. Barak. 2010b. “Requirements for building information modeling based lean production management systems for construction.” Autom. Constr. 19 (5): 641–655. https://doi.org/10.1016/j.autcon.2010.02.010.
Sears, K. S., G. A. Sears, and R. H. Clough. 2008. Construction project management, a practical guide to field construction management. Hoboken, NJ: Wiley.
Shelbourn, M., N. M. Bouchlaghem, C. Anumba, and P. Carrillo. 2007. “Planning and implementation of effective collaboration in construction projects.” Constr. Innovation 7 (4): 357–377. https://doi.org/10.1108/14714170710780101.
Son, J., and E. M. Rojas. 2011. “Evolution of collaboration in temporary project teams: An agent-based modeling and simulation approach.” J. Constr. Eng. Manage. 137 (8): 619–628. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000331.
Suprapto, M., H. L. M. Bakker, and H. G. Mooi. 2015a. “Relational factors in owner–contractor collaboration: The mediating role of team working.” Int. J. Project Manage. 33 (6): 1347–1363. https://doi.org/10.1016/j.ijproman.2015.03.015.
Suprapto, M., H. L. M. Bakker, H. G. Mooi, and W. Moree. 2015b. “Sorting out the essence of owner–contractor collaboration in capital project delivery.” Inter. J. Project Manage. 33 (3): 664–683.
Taggart, M., L. Koskela, and J. Rooke. 2014. “The role of the supply chain in the elimination and reduction of construction rework and defects: An action research approach.” Construct. Manage. Econ. 32 (7–8): 829–842. https://doi.org/10.1080/01446193.2014.904965.
Tayeh, B. A., K. A. Hallaq, H. Zahoor, and A. H. Al Faqawi. 2019. “Techniques and benefits of implementing the last planner system in the Gaza Strip construction industry.” Eng. Constr. Archit. Manage. 26 (7): 1424–1436. https://doi.org/10.1108/ECAM-01-2018-0039.
Waltman, L., N. J. van Eck, and E. C. M. Noyons. 2010. “A unified approach to mapping and clustering of bibliometric networks.” J. Informetrics 4 (4): 629–635. https://doi.org/10.1016/j.joi.2010.07.002.
Yeomans, S. G., N. M. Bouchlaghem, and A. El-Hamalawi. 2006. “An evaluation of current collaborative prototyping practices within the AEC industry.” Autom. Constr. 15 (2): 139–149. https://doi.org/10.1016/j.autcon.2005.02.011.
Zaneldin, E., T. Hegazy, and D. Grierson. 2001. “Improving design coordination for building projects. II: A collaborative system.” J. Constr. Eng. Manage. 127 (4): 330–336. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:4(330).
Zhang, S., F. Pan, C. Wang, Y. Sun, and H. Wang. 2017. “BIM-based collaboration platform for the management of EPC projects in hydropower engineering.” J. Constr. Eng. Manage. 143 (12): 04017087. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001403.
Zhang, X., S. Azhar, A. Nadeem, and M. Khalfan. 2018. “Using building information modelling to achieve lean principles by improving efficiency of work teams.” Int. J. Constr. Manage. 18 (4): 293–300. https://doi.org/10.1080/15623599.2017.1382083.
Zhou, W., P. Georgakis, D. Heesom, and X. Feng. 2012. “Model-based groupware solution for distributed real-time collaborative 4D planning through teamwork.” J. Comput. Civ. Eng. 26 (5): 597–611. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000153.
Zhou, W., D. Heesom, P. Georgakis, and J. H. M. Tah. 2014. “User-centred design for collaborative 4D modelling.” Constr. Innovation 14 (4): 493–517. https://doi.org/10.1108/CI-01-2014-0008.
Zimina, D., G. Ballard, and C. Pasquire. 2012. “Target value design: Using collaboration and a lean approach to reduce construction cost.” Construct. Manage. Econ. 30 (5): 383–398. https://doi.org/10.1080/01446193.2012.676658.
Zimring, C., S. Khan, D. Craig, S. U. Haq, and M. Guzdial. 2001. “CoOL Studio: Using simple tools to expand the discursive space of the design studio.” Autom. Constr. 10 (6): 675–685. https://doi.org/10.1016/S0926-5805(00)00092-3.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 147Issue 4April 2021

History

Received: Jun 17, 2020
Accepted: Nov 13, 2020
Published online: Feb 13, 2021
Published in print: Apr 1, 2021
Discussion open until: Jul 13, 2021

Permissions

Request permissions for this article.

Authors

Affiliations

Amr Elsayegh, S.M.ASCE [email protected]
Ph.D. Candidate, Dept. of Civil, Architectural, and Environmental Engineering, Missouri Univ. of Science and Technology, Rolla, MO 65409. Email: [email protected]
Hurst-McCarthy Professor of Construction Engineering and Management, Professor of Civil Engineering, and Founding Director of the Missouri Consortium of Construction Innovation, Dept. of Civil, Architectural, and Environmental Engineering, Dept. of Engineering Management and Systems Engineering, Missouri Univ. of Science and Technology, Rolla, MO 65409 (corresponding author). ORCID: https://orcid.org/0000-0002-7306-6380. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share