How PPP Renegotiation Behaviors Evolve with Traffic Changes: Evolutionary Game Approach
Publication: Journal of Construction Engineering and Management
Volume 147, Issue 5
Abstract
High risk in actual traffic demand often causes a serious imbalance in interests between the public and private sectors in transportation public–private partnership (PPP) projects. The party who suffers has the incentive to breach the contract and hopes to make up for their loss by renegotiating the PPP concessions. The high frequency of such concession renegotiations has raised questions about the viability of the PPP approach. To study how concession renegotiation behaviors evolve when actual traffic volume is lower or higher than expected, this study introduces traffic changes as a quantitative financial indicator. Moreover, it develops two evolutionary game models in which the private and public sectors initiate the renegotiation. The thresholds for renegotiation by the private and public sectors can be defined based on the models and provide decision support for the governance of concession renegotiation behaviors in transportation PPP projects to reduce the incidence and incentives to renegotiate PPP contracts.
Get full access to this article
View all available purchase options and get full access to this article.
Data Availability Statement
Some or all data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.
Acknowledgments
This study is financially supported by the National Natural Science Foundation of China (Project No. 71701028) and Humanities and Social Science Fund of Ministry of Education of China (Project No. 15YJCZH105).
References
Albalate, D., and G. Bel. 2009. “Regulating concessions of toll motorways: An empirical study on fixed vs. variable term contracts.” Transp. Res. Part A: Policy Pract. 43 (2): 219–229. https://doi.org/10.1016/j.tra.2008.11.008.
Bain, R., and M. Wilkins. 2002. The credit implications of traffic risk in start-up toll facilities. London: Standard & Poor’s.
Bajari, P., S. Houghton, and S. Tadelis. 2014. “Bidding for incomplete contracts: An empirical analysis of adaptation costs.” Am. Econ. Rev. 104 (4): 1288–1319. https://doi.org/10.1257/aer.104.4.1288.
Bennett, J., and E. Iossa. 2006. “Building and managing facilities for public services.” J. Public Econ. 90 (10–11): 2143–2160. https://doi.org/10.1016/j.jpubeco.2006.04.001.
Carpintero, S., J. M. Vassallo, and A. S. Soliño. 2015. “Dealing with traffic risk in Latin American toll roads.” J. Manage. Eng. 31 (2): 05014016. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000266.
Colín, F. C., A. S. Soliño, and A. L. Lara Galera. 2017. “Default and abandonment option in motorway concessions.” J. Infrastruct. Syst. 23 (1): 04016022. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000309.
Cruz, C. O., and R. C. Marques. 2013a. “Flexible contracts to cope with uncertainty in public–private partnerships.” Int. J. Project Manage. 31 (3): 473–483. https://doi.org/10.1016/j.ijproman.2012.09.006.
Cruz, C. O., and R. C. Marques. 2013b. “Using the economic and financial reequilibrium model to decrease infrastructure contract incompleteness.” J. Infrastruct. Syst. 19 (1): 58–66. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000110.
Cruz, C. O., R. C. Marques, and P. Cardoso. 2015. “Empirical evidence for renegotiation of PPP contracts in the road sector.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 7 (2): 05014003. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000151.
de Brux, J. 2010. “The dark and bright sides of renegotiation: An application to transport concession contracts.” Util. Policy 18 (2): 77–85. https://doi.org/10.1016/j.jup.2009.07.003.
De Clerck, D., and E. Demeulemeester. 2016. “Creating a more competitive PPP procurement market: Game theoretical analysis.” J. Manage. Eng. 32 (6): 04016015. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000440.
Demirel, H. Ç., L. Volker, W. Leendertse, and M. Hertogh. 2019. “Dealing with contract variations in PPPs: Social mechanisms and contract management in infrastructure projects.” J. Constr. Eng. Manage. 145 (11): 04019073. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001714.
Domingues, S., and J. M. Sarmento. 2016. “Critical renegotiation triggers of European transport concessions.” Transp. Policy. 48 (May): 82–91. https://doi.org/10.1016/j.tranpol.2016.02.016.
Eid, M. S., I. H. El-Adaway, and K. T. Coatney. 2015. “Evolutionary stable strategy for postdisaster insurance: Game theory approach.” J. Manage. Eng. 31 (6): 04015005. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000357.
Engel, E. M. R. A., R. Fischer, and A. Galetovic. 2019. “Soft budgets and endogenous renegotiations in transport PPPs: An equilibrium analysis.” Econ. Transp. 17 (May): 40–50. https://doi.org/10.1016/j.ecotra.2018.12.003.
Feng, Z., Y. Zhang, S. Zhang, and J. Song. 2018. “Contracting and renegotiating with a loss-averse private firm in BOT road projects.” Transp. Res. Part B: Methodol. 112 (Jun): 40–72. https://doi.org/10.1016/j.trb.2018.04.004.
Geddes, R. 2011. The road to renewal: Private investment in the U.S. transportation infrastructure. Washington, DC: AEI Press.
Guasch, J. L. 2004. Granting and renegotiating infrastructure concessions: Doing it right. Washington, DC: World Bank.
Guasch, J. L., D. Benitez, and I. Portabales, and L. Flor. 2014. “The renegotiation of PPP contracts: An overview of its recent evolution in Latin America.” In Proc., Int. Transport Forum, Discussion Paper No. 2014-18. Paris: OECD Publishing.
Guasch, J. L., J. J. Laffont, and S. Straub. 2003. Renegotiation of concession contracts in Latin America. Washington, DC: World Bank.
Guasch, J. L., J. J. Laffont, and S. Straub. 2007. “Concessions of infrastructure in Latin America: Government-led renegotiation.” J. Appl. Econ. 22 (7): 1267–1294. https://doi.org/10.1002/jae.987.
Guasch, J. L., J. J. Laffont, and S. Straub. 2008. “Renegotiation of concession contracts in Latin America: Evidence from the water and transport sectors.” Int. J. Ind. Organ. 26 (2): 421–442. https://doi.org/10.1016/j.ijindorg.2007.05.003.
Guasch, J. L., and S. Straub. 2006. “Renegotiation of infrastructure concession: An overview.” Ann. Public Cooperative Econ. 77 (4): 479–493. https://doi.org/10.1111/j.1467-8292.2006.00316.x.
Guasch, J. L., and S. Straub. 2009. “Corruption and concession renegotiations: Evidence from the water and transport sectors in Latin America.” Util. Policy 17 (2): 185–190. https://doi.org/10.1016/j.jup.2008.07.003.
Harris, C., J. Hodges, and M. Schur. 2003. Infrastructure projects: A review of canceled private projects. Washington, DC: World Bank.
Hart, O. 2003. “Incomplete contracts and public ownership: Remarks, and an application to public-private partnerships.” Econ. J. 113 (486): 69–76. https://doi.org/10.1111/1468-0297.00119.
Hart, O. D., and J. Moore. 1987. “Incomplete contracts and renegotiation.” Econometrica 56 (4): 755–785. https://doi.org/10.2307/1912698.
Hendrikse, G. 2003. Economics and management of organizations: Coordination, motivation and strategy. 1st ed. London: McGraw-Hill.
Ho, S. P. 2009. “Government policy on PPP financial issues: Bid compensation and financial renegotiation.” In Policy, finance & management for public-private partnerships. Hoboken, NJ: Wiley.
Ho, S. P., and Y. Hsu. 2014. “Bid compensation theory and strategies for projects with heterogeneous bidders: A game theoretic analysis.” J. Manage. Eng. 30 (5): 04014022. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000212.
Ho, S. P., R. Levitt, C.-W. Tsui, and Y. Hsu. 2015. “Opportunism-focused transaction cost analysis of public-private partnerships.” J. Manage. Eng. 31 (6): 04015007. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000361.
Ho, S. P., and L. Y. Liu. 2004. “Analytical model for analyzing construction claims and opportunistic bidding.” J. Constr. Eng. Manage. 130 (1): 94–104. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:1(94).
Jang, W., G. Yu, W. Jung, D. Kim, and S. H. Han. 2018. “Financial conflict resolution for public-private partnership projects using a three-phase game framework.” J. Constr. Eng. Manage. 144 (3): 05017022. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001442.
Lara Galera, A., A. Sánchez Soliño, and B. G. Abad. 2018. “Sharing risks in toll motorway concessions: Subsidies as real options on traffic volume.” J. Infrastruct. Syst. 24 (4): 06018001. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000453.
Liu, J., R. Gao, C. Y. J. Cheah, and J. Luo. 2016. “Evolutionary game of investors’ opportunistic behaviour during the operational period in PPP projects.” Constr. Manage. Econ. 35 (3): 137–153. https://doi.org/10.1080/01446193.2016.1237033.
Lv, J., G. Ye, W. Liu, L. Shen, and H. Wang. 2015. “Alternative model for determining the optimal concession period in managing BOT transportation projects.” J. Manage. Eng. 31 (4): 04014066. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000291.
Marques, R. C., and S. Berg. 2011. “Public-private partnership contracts: A tale of two cities with different contractual arrangements.” Public Admin. 89 (4): 1585–1603. https://doi.org/10.1111/j.1467-9299.2011.01944.x.
Medda, F. 2007. “A game theory approach for the allocation of risks in transport public private partnerships.” Int. J. Project Manage. 25 (3): 213–218. https://doi.org/10.1016/j.ijproman.2006.06.003.
Myerson, R. B. 1991. Game theory: Analysis of conflict. Cambridge, MA: Harvard University Press.
Rosas, A. 2010. “Evolutionary game theory meets social science: Is there a unifying rule for human cooperation?” J. Theor. Biol. 264 (2): 450–456. https://doi.org/10.1016/j.jtbi.2010.02.015.
Smith, J. M., and G. R. Price. 1973. “Theo logic of animal conflict.” Nature 246 (5427): 15–18. https://doi.org/10.1038/246015a0.
Song, J., Y. Hu, and Z. Feng. 2018. “Factors influencing early termination of PPP projects in China.” J. Manage. Eng. 34 (1): 05017008. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000572.
Taylor, P. D., and L. B. Jonker. 1978. “Evolutionarily stable strategy and game dynamics.” Math. Biosci. 40 (1–2): 145–156. https://doi.org/10.1016/0025-5564(78)90077-9.
Weibull, J. 1995. Evolutionary game theory. Princeton, NJ: Princeton University Press.
Xiong, W., and X. Zhang. 2014. “Concession renegotiation models for projects developed through public-private partnerships.” J. Constr. Eng. Manage. 140 (5): 04014008. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000843.
Xiong, W., X. Zhao, and H. Wang. 2018. “Information asymmetry in renegotiation of public-private partnership projects.” J. Comput. Civ. Eng. 32 (4): 04018028. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000763.
Yang, X., J. Zhang, G. Q. Shen, and Y. Yan. 2019. “Incentives for green retrofits: An evolutionary game analysis on public-private-partnership reconstruction of buildings.” J. Cleaner Prod. 232 (Sep): 1076–1092. https://doi.org/10.1016/j.jclepro.2019.06.014.
Information & Authors
Information
Published In
Copyright
© 2021 American Society of Civil Engineers.
History
Received: Feb 11, 2020
Accepted: Nov 6, 2020
Published online: Feb 26, 2021
Published in print: May 1, 2021
Discussion open until: Jul 26, 2021
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.