Drivers of Road Sector Public-Private Partnership Adoption in New and Inexperienced Markets
Publication: Journal of Construction Engineering and Management
Volume 147, Issue 3
Abstract
Newly emerging (inexperienced) public-private partnership (PPP) markets require private sector participation to change the current situation in which governments are the only entity responsible for funding and supporting infrastructure projects. The decision to implement a PPP approach in an inexperienced market requires identification of potential PPP solutions to mitigate the problems associated with the public delivery of road projects. However, this issue of identification has not been addressed in previous studies. Therefore, the present study aims to develop a framework that identifies potential PPP solutions to public delivery problems. To address this issue, documents that provide first-hand PPP experiences were collected from five toll roads and bridge projects in Senegal, Ghana, Nigeria, Mozambique, and Cote d’Ivoire. Furthermore, the authors conducted interviews with the key stakeholders of toll road projects in Ethiopia—a newly emerging, inexperienced PPP market. The resulting data were analyzed to explore the potential drivers of PPP adoption through a concept-mapping technique, along with case study aggregation. Based on the findings, a framework was developed that consisted of nine PPP-associated factors acting as a solution to 12 public delivery-associated problems. The results demonstrate that fostering economic development with the help of the private sector to raise project financing and constructing roads that can ease traffic congestion are the main potential drivers of PPP implementation in inexperienced PPP markets. This reveals that PPP implementation motives in the inexperienced PPP markets of developing countries are different from the motives in the experienced PPP markets of developing countries. The study findings would help inexperienced PPP markets to find PPP solutions to the problems associated with public delivery.
Get full access to this article
View all available purchase options and get full access to this article.
Data Availability Statement
Some or all data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.
References
Antillon, E. I., K. R. Molenaar, and A. Javernick-Will. 2017. “Evaluating the effect of contract timing on lifecycle-design innovation in public–private partnerships: Comparative case study of highway projects.” J. Constr. Eng. Manage. 143 (4): 05016023. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001239.
Ashuri, B., and K. Mostaan. 2015. “State of private financing in development of highway projects in the United States.” J. Manage. Eng. 31 (6): 04015002. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000362.
Badu, E., D. G. Owusu-Manu, D. J. Edwards, and G. D. Holt. 2013. “Analysis of strategic issues underpinning the innovative financing of infrastructure within developing countries.” J. Constr. Eng. Manage. 139 (6): 726–737. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000641.
Cai, J., S. Li, and H. Cai. 2019. “Empirical analysis of capital structure determinants in infrastructure projects under public-private partnerships.” J. Constr. Eng. Manage. 145 (5): 04019032. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001658.
Carter, L. 2015. “5 lessons from sub-Saharan Africa’s first public-private road.” Accessed March 20, 2019. https://www.weforum.org/agenda/2015/06/5-lessons-from-sub-saharan-africas-first-public-private-road/.
Chan, A. P. C., P. T. I. Lam, D. W. M. Chan, E. Cheung, and Y. Ke. 2009. “Drivers for adopting public-private partnerships: Empirical comparison between China and Hong Kong special administrative region.” J. Constr. Eng. Manage. 135 (11): 1115–1124. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000088.
Chen, C., and H. Doloi. 2008. “BOT application in China: Driving and impeding factors.” Int. J. Project Manage. 26 (4): 388–398. https://doi.org/10.1016/j.ijproman.2007.07.002.
Cherkos, F. D., K. N. Jha, and A. Singh. 2020. “Framework to select public-private partnership modalities.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (4): 04520034. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000425.
Cheung, E., A. P. C. Chan, and S. Kajewski. 2009. “Reasons for implementing public private partnership projects: Perspectives from Hong Kong, Australian and British practitioners.” J. Property Invest. Finance 27 (1): 81–95. https://doi.org/10.1108/14635780910926685.
Chou, J. S., and D. Pramudawardhani. 2015. “Cross-country comparisons of key drivers, critical success factors and risk allocation for public-private partnership projects.” Int. J. Project Manage. 33 (5): 1136–1150. https://doi.org/10.1016/j.ijproman.2014.12.003.
Eisenhardt, K. M. 1989. “Building theories from case study research.” Acad. Manage. Rev. 14 (4): 532–550. https://doi.org/10.5465/amr.1989.4308385.
Farlam, P. 2005. Working together: Assessing public-private partnerships in Africa. Pretoria, South Africa: The South African Institute of International Affairs.
Fellows, R. F., and A. M. Liu. 2015. Research methods for construction, 93–117. Oxford, UK: Wiley.
Feng, K., W. Xiong, S. Wang, C. Wu, and Y. Xue. 2017. “Optimizing an equity capital structure model for public–private partnership projects involved with public funds.” J. Constr. Eng. Manage. 143 (9): 04017067. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001349.
Gainer, M., and S. Chan. 2016. “A new route to development: Senegal’s toll highway public-private partnership, 2003–2013, Innovations for successful societies.” Accessed October 18, 2019. https://successfulsocieties.princeton.edu/publications/development-senegal-toll-highway-public-private-partnership.
Gomm, R., M. Hammersley, and P. Foster, eds. 2000. Case study method: Key issues, key texts. London: SAGE.
Gustafsson, J. 2017. “Single case studies vs. multiple case studies: A comparative study.” Accessed February 19, 2019. http://www.diva-portal.org/smash/get/diva2:1064378/FULLTEXT01.pdf.
Hayes, N. 2017. “Public-private partnerships in emerging markets.” Accessed June 25, 2019. https://blogs.lse.ac.uk/internationaldevelopment/2017/05/08/ppps-in-emerging-markets/.
IMF (International Monetary Fund). 2018. “The federal democratic republic of Ethiopia: IMF country report no. 18/18.” Accessed November 10, 2019. https://www.tralac.org/images/docs/12636/ethiopia-article-iv-consultation-imf-country-report-no-18-18-january-2018.pdf.
Ismail, S. 2014. “Driving forces for implementation of public private partnerships (PPP) in Malaysia and a comparison with the United Kingdom.” J. Econ. Administrative Sci. 30 (2): 82–95. https://doi.org/10.1108/JEAS-06-2013-0019.
Kwak, Y. H., Y. Chih, and C. W. Ibbs. 2009. “Towards a comprehensive understanding of public-private partnerships for infrastructure development.” Calif. Manage. Rev. 51 (2): 51–78. https://doi.org/10.2307/41166480.
Laboul, A., and R. Della Croce. 2014. “Private financing and government support to promote long-term investments in infrastructure.” Accessed September 10, 2019. https://www.oecd.org/daf/fin/private-pensions/Private-financing-and-government-support-to-promote-LTI-in-infrastructure.pdf.
Liu, T., and S. Wilkinson. 2011. “Adopting innovative procurement techniques: Obstacles and drivers for adopting public private partnerships in New Zealand.” Constr. Innovation 11 (4): 452–469. https://doi.org/10.1108/14714171111175918.
Mazher, K. M., A. P. Chan, H. Zahoor, M. I. Khan, and E. E. Ameyaw. 2018. “Fuzzy integral—Based risk-assessment approach for public-private partnership infrastructure projects.” J. Constr. Eng. Manage. 144 (12): 04018111. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001573.
Mushir, A., and M. Hailemariam. 2015. “Geographical analysis of road transportation of Ethiopia.” Ethiopian J. Environ. Studies Manage. 8 (1): 846–854. https://doi.org/10.4314/ejesm.v8i1.12.
OECD (Organization for Economic Co-Operation and Development). 2008. “Transport infrastructure investment: Options for efficiency.” Accessed October 10, 2019. https://www.researchgate.net/publication/288402791_Transport_infrastructure_investment_Options_for_efficiency.
Osei-Kyei, R., and A. P. C. Chan. 2016. “Developing transport infrastructure in sub Saharan Africa through public private partnerships policy practice and implications.” Transp. Rev. 36 (2): 170–186. https://doi.org/10.1080/01441647.2015.1077288.
PPIAF (Public-Private Infrastructure Advisory Facility). 2009. “Toolkit for public-private partnership in roads and highways.” Accessed September 20, 2019. https://ppiaf.org/sites/ppiaf.org/files/documents/toolkits/highwaystoolkit/6/pdf-version/toolKit_ppp_roads&highways.zip.
Robert, O. K., A. Dansoh, and J. K. Ofori-Kuragu. 2014. “Reasons for adopting public-private partnership for construction projects in Ghana.” Int. J. Constr. Manage. 14 (4): 227–238. https://doi.org/10.1080/15623599.2014.967925.
Robinson, R., U. Danielson, and M. Snaith. 1998. Road maintenance management: Concepts and systems, 79–92. London: MacMillan Press.
Rowley, J. 2002. “Using case studies in research.” Manage. Res. News 25 (1): 16–27. https://doi.org/10.1108/01409170210782990.
Shakir, M. 2002. “The selection of case studies: Strategies and their applications to IS implementation cases studies.” Res. Lett. Inf. Math. Sci. 3: 191–198.
South Africa. 2017. “Public finance management act no. 1 of 1999.” Accessed December 20, 2019. http://www.treasury.gov.za/legislation/pfma/PFMA1999asamendedMarch2017.pdf.
Stevens, B., P.-A. Schieb, and A. Gibson. 2011. Strategic transport infrastructure needs to 2030: International futures programme, main findings. OECD futures project on transcontinental infrastructure needs to 2030/50. Paris: Organization for Economic Co-Operation and Development Publications.
Touran, A., D. D. Gransberg, K. R. Molenaar, and K. Ghavamifar. 2011. “Selection of project delivery method in transit: Drivers and objectives.” J. Manage. Eng. 27 (1): 21–27. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000027.
UNCTAD (United Nations Conference on Trade and Development). 2014. World investment report 2014: Investing in the SDGs: Action plan. Geneva: UNCTAD.
Wildemuth, B. M. 2016. Qualitative analysis of content: Applications of social research methods to questions in information and library science. 2nd ed. 318–323. Santa Barbara, CA: Libraries Unlimited.
World Bank. 2017. PPP reference guide. Washington, DC: World Bank.
WPR (World Population Review). 2018. “Ethiopia population 2018-12-08.” Accessed December 17, 2019. http://worldpopulationreview.com/countries/ethiopia-population/.
Yescombe, E. R. 2017. Public-private partnerships in sub-Saharan Africa: Case studies for policymakers. Dar es Salaam, Tanzania: UONGOZI Institute.
Yin, R. 2013. Case study research: Design and methods, 69–71. Thousand Oaks, CA: SAGE.
Yuan, J. F., M. J. Skibniewski, Q. Li, and J. Shan. 2010. “The driving factors of China’s public-private partnership projects in metropolitan transportation systems: Public sector’s viewpoint.” J. Civ. Eng. Manage. 16 (1): 5–18. https://doi.org/10.3846/jcem.2010.01.
Zheng, S., and R. L. Tiong. 2010. “First public-private-partnership application in Taiwan’s wastewater treatment sector: Case study of the Nanzih BOT wastewater treatment project.” J. Constr. Eng. Manage. 136 (8): 913–922. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000196.
Information & Authors
Information
Published In
Copyright
© 2020 American Society of Civil Engineers.
History
Received: Mar 25, 2020
Accepted: Oct 5, 2020
Published online: Dec 30, 2020
Published in print: Mar 1, 2021
Discussion open until: May 30, 2021
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.