Free access
In Memoriam
Aug 6, 2020

In Memoriam: Gregory Alvin Howell

Publication: Journal of Construction Engineering and Management
Volume 146, Issue 10
First page of PDF

Formats available

You can view the full content in the following formats:

References

Ballard, G., and G. Howell. 1998. “Shielding production: Essential step in production control.” J. Constr. Eng. Manage. 124 (1): 11–17. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:1(11).
Howell, G. A. 1999. “What is lean construction—1999.” In Vol. 7 of Proc., Annual Conf. on Lean Construction, 1. Berkeley, CA: International Group for Lean Construction.
Howell, G. A., and G. Ballard. 1996. Managing uncertainty in the piping function. Austin: Univ. of Texas at Austin.
Howell, G. A., G. Ballard, T. S. Abdelhamid, and P. Mitropoulos. 2002. “Working near the edge: A new approach to construction safety.” In Vol. 10 of Proc., Annual Conf. on Lean Construction, 49–60. Berkeley, CA: International Group for Lean Construction.
Howell, G. A., G. Ballard, and S. Demirkesen. 2017. “Why lean projects are safer.” In Proc., 25th Annual Conf. of the Int. Group for Lean Construction, 4–12. Berkeley, CA: International Group for Lean Construction.
Howell, G. A., G. Ballard, and J. Hall. 2001. “Capacity utilization and wait time: A primer for construction.” In Proc., 9th Annual Meeting of the Int. Group for Lean Construction, 6–8. Berkeley, CA: International Group for Lean Construction.
Howell, G. A., G. Ballard, and I. Tommelein. 2011. “Construction engineering—Reinvigorating the discipline.” J. Constr. Eng. Manage. 137 (10): 740–744. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000276.
Koskela, L. J., and G. Howell. 2002. “The underlying theory of project management is obsolete.” In Proc., PMI Research Conf., 293–302. Newtown Square, PA: Project Management Institute.
Macomber, H., and G. A. Howell. 2003. “Linguistic action: Contributing to the theory of Lean construction.” In Proc., 11th Annual Conf. of the Int. Group for Lean Construction. Berkeley, CA: International Group for Lean Construction.
Matthews, O., and G. A. Howell. 2005. “Integrated project delivery: An example of relational contracting” Lean Constr. J. 2 (1): 46–61.
Oglesby, C. H., H. W. Parker, and G. A. Howell. 1989. Productivity improvement in construction. New York: McGraw-Hill College.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 146Issue 10October 2020

History

Received: Jul 21, 2020
Accepted: Jul 24, 2020
Published online: Aug 6, 2020
Published in print: Oct 1, 2020
Discussion open until: Jan 6, 2021

Permissions

Request permissions for this article.

Authors

Affiliations

Researcher, Project Production Systems Laboratory, Univ. of California, Berkeley, Berkeley, CA 94619. ORCID: https://orcid.org/0000-0002-0948-8861. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share