Selection of the most appropriate contractor is critical for a successful project. There has been no practical analytic model for objective determination of the most appropriate contractor selection method (CSM) before the tendering evaluation. Most existing models adopt the posttendering bidding data for a specific procurement project rather than those from all potential bidders who may enter the procurement market. To resolve the long-unsolved problem of the existing models, this paper proposes a pretendering contractor selection analysis model (PreCSAM) based on historical procurement data, which can determine the most appropriate of the three prevailing contractor selection methods, e.g., lowest tender (LT), best value (BV), and prequalified lowest tender (PQLT). The three-stage model validation of the proposed method revealed that the proposed PreCSAM is able to suggest a CSM with 100% correctness compared with those reported in literature; it also achieved a high precision rate (94.12%) of market range prediction for a retrospective analysis of 23 public building construction projects from 2012 to 2018 procurements by the Construction and Planning Agency of the Ministry of Interior, Taiwan. Most importantly, the proposed PreCSAM overcomes the limitations of posttendering analysis of all existing methods in determining CSM.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Data generated or analyzed during the study are available from the corresponding author by request.

References

Abdelrahman, M., T. Zayed, and A. Elyamany. 2008. “Best-value model based on project specific characteristics.” J. Constr. Eng. Manage. 134 (3): 179–188. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:3(179).
Bagwell, K., C. P. Bown, and R. W. Staiger. 2016. “Is the WTO passé?” J. Econ. Lit. 54 (4): 1125–1231. https://doi.org/10.1257/jel.20151192.
Chamberlin, E. H. 1974. The theory of monopolistic competition: A re-orientation of the theory of value. 8th ed. Cambridge, MA.: Harvard Univ.
Chen, H. J. 2008. “The implementation analysis of awarding principles in government procurement act.” [In Chinese.] M.S. thesis, Dept. of Civil Engineering, National Taiwan Univ.
Cole, M. T., R. B. Davies, and T. Kaplan. 2017. “Protection in government procurement auctions.” J. Int. Econ. 106 (May): 134–142. https://doi.org/10.1016/j.jinteco.2017.03.003.
Feldman, M. 2006. Best value in publicly funded projects: Contractor selection in two county gob projects. Miami, FL: Enter for Labor Research and Studies, Florida International Univ.
Gale, B. T., and D. J. Swire. 2006. “Customer value accounting for value-based pricing.” J. Prof. Pricing 15 (3): 30–33.
Gransberg, D. D., and M. A. Ellicott. 1997. “Best-value contracting criteria.” Cost Eng. J. AACE Int. 39 (6): 31–34.
Hillebrandt, P. M. 1974. Economic theory and the construction industry. London: Macmillan.
Hsu, Y. Y., S. T. Cheng, W. D. Yu, H. K. Chang, and K. Wang. 2019. “Determination of the contractor selection method for the heterogeneous procurement projects based on historical bidding data.” [In Chinese.] J. Technol. 34 (4): 173–185.
Molenaar, K. R., and D. D. Gransberg. 2001. “Design-builder selection for small highway projects.” J. Manage. Eng. 17 (4): 214–223. https://doi.org/10.1061/(ASCE)0742-597X(2001)17:4(214).
Oo, B. L., D. S. Drew, and H. P. Lo. 2010. “Modeling the heterogeneity in contractors’ mark-up behavior.” J. Constr. Eng. Manage. 17 (4): 720–729. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000186.
PCC (Public Construction Commission). 2006. Submission notes for pre-qualified tender procurement. Taiwan, Republic of China: Public Construction Commission, Executive Yuan.
PCC (Public Construction Commission). 2016. “Government procurement act.” Accessed September 19, 2019. http://lawweb.pcc.gov.tw/EngLawContent.aspx?lan=E&id=49.
Runeson, G., and J. Raftery. 1998. “Neo-classical microeconomics as an analytical tool for construction price determination.” J. Constr. Procurement 4 (2): 116–131.
Scherer, F. M., and D. Ross. 1991. Industrial market structure and economic performance. Boston: Houghton Mifflin.
Su, T. Y. 2010. “The research of the lowest bid mechanism of heterogeneous procurement in public sectors: A case study of the water resources agency.” [In Chinese.] M.S. thesis, Executive Master Program of Public Affairs, Tung Hai Univ.
Wang, K. W., Y. Y. Hsu, W. D. Yu, and S. T. Cheng. 2018. “Determination of project procurement method with a graphical analytic model.” Sustainability 10 (10): 103583. https://doi.org/10.3390/su10103583.
Wang, K. W., and W. D. Yu. 2011. “Model for analysis of heterogeneity in product acquisition procurement.” [In Chinese.] J. Chin. Inst. Eng. 34 (7): 877–887. https://doi.org/10.1080/02533839.2011.591917.
Wang, K. W., and W. D. Yu. 2014. “A graphical model for analysis of heterogeneous procurement.” [In Chinese.] J. Technol. 29 (1): 1–15.
Wang, W. C., W. D. Yu, I. T. Yang, and C. C. Lin. 2012. “Applying the AHP to support the best-value contractor selection—Lessons learned from two case studies in Taiwan.” J. Civ. Eng. Manage. 19 (1): 24–36. https://doi.org/10.3846/13923730.2012.734851.
WTO (World Trade Organization). 2014. “Agreement on government procurement.” Accessed September 19, 2019. https://www.wto.org/english/docs_e/legal_e/gpr-94_e.pdf.
Yu, W. D., and K. W. Wang. 2012. “Best value or lowest bid? A quantitative perspective.” J. Constr. Eng. Manage. 138 (1): 128–134. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000414.
Yu, W. D., K. W. Wang, and M. T. Wang. 2013. “Pricing strategy for best value tender.” J. Constr. Eng. Manage. 139 (6): 675–684. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000635.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 146Issue 11November 2020

History

Received: Oct 8, 2019
Accepted: May 29, 2020
Published online: Sep 7, 2020
Published in print: Nov 1, 2020
Discussion open until: Feb 7, 2021

Permissions

Request permissions for this article.

Authors

Affiliations

Professor, Dept. of Construction Engineering, Chaoyang Univ. of Technology, Taichung 41349, Taiwan. ORCID: https://orcid.org/0000-0002-4724-4745
Postdoctoral Researcher, Dept. of Construction Engineering, Chaoyang Univ. of Technology, Taichung 41349, Taiwan (corresponding author). ORCID: https://orcid.org/0000-0003-3442-0444. Email: [email protected]
Yuan-Yu Hsu, Ph.D.
Dept. of Civil Engineering, Chung Hua Univ., Hsinchu 300, Taiwan.
Shao-Tsai Cheng, Ph.D.
Professor, Dept. of Construction Management, Chung Hua Univ., Hsinchu 300, Taiwan.
Kwo-Wuu Wang, Ph.D.
Assistant Professor, Dept. of Law, National Defense Univ., Taoyuan 334, Taiwan.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share