Examining the Effect of Material Management Issues on the Schedule and Cost Performance of Construction Projects Based on a Structural Equation Model: Survey of Indian Experiences
Publication: Journal of Construction Engineering and Management
Volume 146, Issue 9
Abstract
An effective material management system is key to the success of construction projects. However, the Indian construction industry suffers from many material management issues that lead to ineffectiveness in the material management system. Previous studies in the field have not comprehensively examined the issues affecting the schedule and cost performance of construction projects. To address this gap, this study identified a total of 33 material management issues from the existing literature and conducted interviews with 15 material management experts with more than of experience in material management. The data were collected through the use of a questionnaire survey completed by 86 procurement professionals. The results revealed six factors with a significant positive influence on the disruption of projects’ schedule and cost performances. Improper delivery of materials is the most critical material management factor, followed by inadequate planning of materials, lack of information and communication, financial issues in procurement, changes in scope of materials, and difficulty in transportation. The findings of this study enable construction practitioners to effectively focus on the few critical factors to improve the material management system and thereby enhancing projects’ schedule and cost performances.
Get full access to this article
View all available purchase options and get full access to this article.
Data Availability Statement
Data generated or analyzed during the study are available from the corresponding author by request. Information about the Journal’s data-sharing policy can be found here: http://ascelibrary.org/doi/10.1061/(ASCE)CO.1943-7862.0001263.
References
Ahuja, V., J. Yang, and R. Shankar. 2009. “Study of ICT adoption for building project management in the Indian construction industry.” Autom. Constr. 18 (4): 415–423. https://doi.org/10.1016/j.autcon.2008.10.009.
Aibinu, A. A., F. Y. Y. Ling, and G. Ofori. 2011. “Structural equation modelling of organizational justice and cooperative behaviour in the construction project claims process: Contractors’ perspectives.” Constr. Manage. Econ. 29 (5): 463–481. https://doi.org/10.1080/01446193.2011.564195.
Arijeloye, B. T., and F. O. Akinradewo. 2016. “Assessment of materials management on building projects in Ondo State, Nigeria.” World Sci. News 55: 168–185.
Bandyopadhyay, A., and J. Dimilia. 2002. “A study on materials procurement and management for small companies.” In Proc., American Society for Engineering Education Annual Conf. and Exposition, 1–7. Washington, DC: American Society for Engineering Education.
Bell, L. C., and G. Stukhart. 1986. “Attributes of materials management systems.” J. Constr. Eng. Manage. 112 (1): 14–21. https://doi.org/10.1061/(ASCE)0733-9364(1986)112:1(14).
Caldas, C. H., J. Y. Kim, C. T. Haas, P. M. Goodrum, and D. Zhang. 2014a. “Method to assess the level of implementation of productivity practices on industrial projects.” J. Constr. Eng. Manage. 141 (1): 04014061. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000919.
Caldas, C. H., C. L. Menches, P. M. Reyes, L. Navarro, and D. M. Vargas. 2014b. “Materials management practices in the construction industry.” Pract. Period. Struct. Des. Constr. 20 (3): 1–8. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000238.
Chan, I. Y., A. M. Liu, and R. Fellows. 2013. “Role of leadership in fostering an innovation climate in construction firms.” J. Manage. Eng. 30 (6): 06014003. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000271.
Chen, Y. Q., Y. B. Zhang, J. Y. Liu, and P. Mo. 2012. “Interrelationships among critical success factors of construction projects based on the structural equation model.” J. Manage. Eng. 28 (3): 243–251. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000104.
Das, P. 2005. “Reduction in delay in procurement of materials using Six Sigma philosophy.” Total Qual. Manage. Bus. Excellence 16 (5): 645–656. https://doi.org/10.1080/14783360500077583.
Dey, P. K. 2001. “Re-engineering materials management: A case study on an Indian refinery.” Bus. Process Manage. J. 7 (5): 394–408. https://doi.org/10.1108/EUM0000000006002.
Doloi, H., K. C. Iyer, and A. Sawhney. 2011. “Structural equation model for assessing impacts of contractor’s performance on project success.” Int. J. Project Manage. 29 (6): 687–695. https://doi.org/10.1016/j.ijproman.2010.05.007.
Doloi, H., A. Sawhney, K. C. Iyer, and S. Rentala. 2012. “Analysing factors affecting delays in Indian construction projects.” Int. J. Project Manage. 30 (4): 479–489. https://doi.org/10.1016/j.ijproman.2011.10.004.
Eriksson, P. E., and O. Pesamaa. 2007. “Modelling procurement effects on cooperation.” Constr. Manage. Econ. 25 (8): 893–901. https://doi.org/10.1080/01446190701468844.
Fellows, R. F., and A. M. Liu. 2015. Research methods for construction. Hoboken, NJ: Wiley.
GoI (Government of India). 2019. “Make in India: Construction.” Accessed November 10, 2019. http://www.makeinindia.com/sector/construction.
Gurmu, A. T. 2018. “Construction materials management practices enhancing labour productivity in multi-storey building projects.” Int. J. Constr. Manage. 20 (1): 1–11. https://doi.org/10.1080/15623599.2018.1462447.
Hadikusumo, B. H. W., S. Petchpong, and C. Charoenngam. 2005. “Construction material procurement using internet-based agent system.” Autom. Constr. 14 (6): 736–749. https://doi.org/10.1016/j.autcon.2005.01.004.
Hair, J. F., W. C. Black, B. J. Babin, and R. E. Anderson. 2014. Multivariate data analysis. London: Pearson.
Iacobucci, D. 2010. “Structural equations modeling: Fit indices, sample size, and advanced topics.” J. Consum. Psychol. 20 (1): 90–98. https://doi.org/10.1016/j.jcps.2009.09.003.
Isabelle, Y. S. C., A. M. M Liu, and R. Fellows. 2014. “Role of leadership in fostering an innovation climate in construction firms.” J. Manage. Eng. 30 (6): 06014003. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000271.
Isik, Z., D. Arditi, I. Dikmen, and M. T. Birgonul. 2009. “Impact of corporate strengths/weaknesses on project management competencies.” Int. J. Project Manage. 27 (6): 629–637. https://doi.org/10.1016/j.ijproman.2008.10.002.
Islam, M. M., and O. O. Faniran. 2005. “Structural equation model of project planning effectiveness.” Constr. Manage. Econ. 23 (2): 215–223. https://doi.org/10.1080/0144619042000301384.
Islam, M. M., M. W. Murad, A. J. McMurray, and T. S. Abalala. 2017. “Aspects of sustainable procurement practices by public and private organisations in Saudi Arabia: An empirical study.” Int. J. Sustainable Dev. World Ecol. 24 (4): 289–303. https://doi.org/10.1080/13504509.2016.1209794.
Jha, K. N. 2015. “Construction material management.” In Construction project management: Theory and practices. 2nd ed., 427–453. London: Pearson.
Jha, K. N., and M. N. Devaya. 2008. “Modelling the risks faced by Indian construction companies assessing international projects.” Constr. Manage. Econ. 26 (4): 337–348. https://doi.org/10.1080/01446190801953281.
Ji, G. 2010. “Analysis of barrier factors affecting government procurement based on ISM.” In Logistics for sustained economic development: Infrastructure, information, integration, 934–943. Reston, VA: ASCE.
Jusoh, Z. M., and N. Kasim. 2017a. “Influential factors affecting materials management in construction projects.” Manage. Prod. Eng. Rev. 8 (4): 82–90. https://doi.org/10.1515/mper-2017-0039.
Jusoh, Z. M., and N. Kasim. 2017b. “A review on implication of material management to project performance.” In Vol. 87 of Proc., MATEC Web of Conf., 01012. Les Ulis, France: EDP Sciences. https://doi.org/10.1051/matecconf/20178701012.
Kasim, N. B. 2010. “Towards a framework for ICT-enabled materials management in complex projects.” J. Techno-Social 2 (1): 11–22.
Kim, S. B. 2014. “Assessment of CII best practices usage in the construction industry.” J. Civ. Eng. 18 (5): 1228–1238. https://doi.org/10.1007/s12205-014-0221-z.
Koushki, P. A., and N. Kartam. 2004. “Impact of construction materials on project time and cost in Kuwait.” Eng. Constr. Archit. Manage. 11 (2): 126–132. https://doi.org/10.1108/09699980410527867.
KPMG. 2016. “Urban Indian real estate.” Accessed September 25, 2018. https://assets.kpmg.com/content/dam/kpmg/in/pdf/2016/08/Urban_Indian_real_estate.pdf.
Kulkarni, V., R. Sharma, and M. Hote. 2017. “Factors affecting material management on construction site.” J. Eng. Technol. 4 (1): 474–478.
Marzouk, M., and A. Amin. 2013. “Predicting construction materials prices using fuzzy logic and neural networks.” J. Constr. Eng. Manage. 139 (9): 1190–1198. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000707.
Navon, R., and O. Berkovich. 2006. “An automated model for materials management and control.” Constr. Manage. Econ. 24 (6): 635–646. https://doi.org/10.1080/01446190500435671.
Ozorhon, B., D. Arditi, I. Dikmen, and M. T. Birgonul. 2011. “Toward a multidimensional performance measure for international joint ventures in construction.” J. Constr. Eng. Manage. 137 (6): 403–411. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000314.
Patel, D. A., and K. N. Jha. 2016. “Structural equation modeling for relationship-based determinants of safety performance in construction projects.” J. Manage. Eng. 32 (6): 05016017. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000457.
Patel, K. V., and C. M. Vyas. 2011. “Construction material management on project sites.” In Proc., National Conf. on Recent Trends in Engineering and Technology, 1–5. Gujrat, India: B.V.M. Engineering College.
Polat, G., and D. Arditi. 2005. “The JIT materials management system in developing countries.” Constr. Manage. Econ. 23 (7): 697–712. https://doi.org/10.1080/01446190500041388.
Ren, Z., C. J. Anumba, and J. Tah. 2011. “RFID-facilitated construction materials management (RFID-CMM)—A case study of water-supply project.” Adv. Eng. Inf. 25 (2): 198–207. https://doi.org/10.1016/j.aei.2010.02.002.
Safa, M., A. Shahi, C. T. Haas, and K. W. Hipel. 2014. “Supplier selection process in an integrated construction materials management model.” Autom. Constr. 48 (Dec): 64–73. https://doi.org/10.1016/j.autcon.2014.08.008.
Saunders, M., P. Lewis, and A. Thornhill. 2007. Research methods for business students. London: Pearson.
Silver, E. A. 1988. “Materials management in large-scale construction projects: Some concerns and research issues.” Eng. Costs Prod. Econ. 15 (May): 223–229. https://doi.org/10.1016/0167-188X(89)90129-8.
Tabish, S. Z. S., and K. N. Jha. 2012. “Success traits for a construction project.” J. Constr. Eng. Manage. 138 (10): 1131–1138. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000538.
Tripathi, K. K., and K. N. Jha. 2018. “Determining success factors for a construction organization: A structural equation modeling approach.” J. Manage. Eng. 34 (1): 04017050. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000569.
Tripathi, K. K., and K. N. Jha. 2019. “An empirical study on factors leading to the success of construction organizations in India.” Int. J. Constr. Manage. 19 (3): 222–239. https://doi.org/10.1080/15623599.2017.1423162.
Viswanathan, S. K., K. K. Tripathi, and K. N. Jha. 2020. “Influence of risk mitigation measures on international construction project success criteria—A survey of Indian experiences.” Constr. Manage. Econ. 38 (3): 207–222. https://doi.org/10.1080/01446193.2019.1577987.
Wong, P. S. P., and S. Cheung. 2005. “Structural equation model of trust and partnering success.” J. Manage. Eng. 21 (2): 70–80. https://doi.org/10.1061/(ASCE)0742-597X(2005)21:2(70).
Information & Authors
Information
Published In
Copyright
© 2020 American Society of Civil Engineers.
History
Received: Dec 5, 2019
Accepted: May 12, 2020
Published online: Jul 10, 2020
Published in print: Sep 1, 2020
Discussion open until: Dec 10, 2020
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.