Abstract

Labor productivity in construction has fallen behind other industries in most of the world and has declined continuously for decades in the United States. To change this, the construction industry needs to know where to focus. This research aims to show how important craftsmen efficiency is for national construction labor productivity (CLP) development. Statistical analysis was used to compare craftsmen efficiency and CLP data from North America (NA) in the period 1972–2010. Craftsmen efficiency data were extracted from published work that measured direct work (DW) through work sampling, and CLP data were extracted from national databases. A statistically significant relationship between DW and CLP was established. This revealed that adding 36 s of DW to every work hour could yield a yearly return of 5.4 billion USD to the NA gross domestic product (GDP). Results show that more focus on activity and project level efficiency is crucial for changing the trends of national CLP. Industry leaders and policy makers now have a solid foundation for taking corrective actions for an industry plagued by low productivity.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Data generated or analyzed during the study are available from the corresponding author by reasonable request. Information about the journal’s data-sharing policy can be found here: https://ascelibrary.org/doi/10.1061/(ASCE)CO.1943-7862.0001263.

Acknowledgments

This research is part of the REVALUE research project that focuses on the refurbishment of social housing buildings. The study was sponsored by the Innovation Fund Denmark. The authors are responsible for the content of this publication.

References

Abdel-Wahab, M., and B. Vogl. 2011. “Trends of productivity growth in the construction industry across Europe, US and Japan.” J. Constr. Manage. Econ. 29 (6): 635–644. https://doi.org/10.1080/01446193.2011.573568.
Adrian, J. J. 2004. Construction productivity and improvement. Champaign, IL: Stipes Publishing L.L.C.
Agbulos, A., and S. M. AbouRizk. 2003. “An application of lean concepts and simulation for drainage operations maintenance crews.” In Proc., 35th Conf. on Winter Simulation: Driving Innovation: Winter Simulation Conf. New York: IEEE.
Alarcón, L. F. 1993. “Modeling waste and performance in construction.” In Proc., 1st Annual Conf. of the Int. Group for Lean Construction. Espoo, Finland: International Group for Lean Construction.
Al-Ghamdi, M. A. M. 1995. “Evaluation of work sampling as an indicator of construction labor productivity.” M.Sc. thesis, Faculty of the college of graduate studies, King Fahd Univ. of Petroleum and Minerals.
Alinaitwe, H., J. Mwakali, and B. Hansson. 2006. “Efficiency of craftsmen on building sites–studies in Uganda.” In Proc., Int. Conf. on Advances in Engineering and Technology. Amsterdam, Netherlands: Elsevier.
Allen, S. G. 1985. Why construction industry productivity is declining. Cambridge, MA: National Bureau of Economic Research.
Allmon, E., C. T. Haas, J. D. Borcherding, and P. M. Goodrum. 2000. “US construction labor productivity trends, 1970–1998.” J. Constr. Eng. Manage. 126 (2): 97–104. https://doi.org/10.1061/(ASCE)0733-9364(2000)126:2(97).
Arditi, D., and K. Mochtar. 2000. “Trends in productivity improvement in the US construction industry.” J. Constr. Manage. Econ. 18 (1): 15–27. https://doi.org/10.1080/014461900370915.
Ballard, G. 2000. “The last planner system of production control.” Ph.D. dissertation, School of Civil Engineering, Univ. of Birmingham.
Baxendale, A. 1987. “Measuring site productivity by work sampling.” In Proc., CIB W-65 The Organisation and Management of Construction—5th Int. Symp. Berkshire, UK: Chartered Institute of Building.
BEA (US Bureau of Economic Analysis). 2019. “Table 5.4.4. Price indexes for private fixed investment in structures by type.” Accessed July 19, 2019. https://apps.bea.gov/iTable/iTable.cfm?reqid=19&step=2#reqid=19&step=2&isuri=1&1921=survey.
Björkman, L., P.-E. Josephson, and R. Kling. 2010. Arbetstidens använding vid VVS-montage - en fråga om struktur och ledarskab [The use of working hours in plumbing installation - A matter of structure and leadership]. Svenska Byggbranschens Utvecklingsfond [The Swedish Construction Development Fund] and VVS-företagen [Association of Plumbing Companies]. Stockholm, Sweden: Svenska Byggbranschens Utvecklingsfond.
BLS (US Bureau of Labor Statistics). 2019. “Current employment statistics—CES (National).” Accessed July 19, 2019. https://www.bls.gov/ces/data/home.htm.
Buchan, R., F. Fleming, and J. R. Kelly. 1991. Estimating for builders and quantity surveyors. London: Butterworth- Heinemann.
Caldas, C. H., J.-Y. Kim, C. T. Haas, P. M. Goodrum, and D. Zhang. 2015. “Method to assess the level of implementation of productivity practices on industrial projects.” J. Constr. Eng. Manage. 141 (1): 04014061. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000919.
CB (US Census Bureau). 2019a. “Construction spending 1964–2002—Historical C30 value of construction put in place data—Annual value of construction put in place in millions of dollars.” Accessed July 18, 2019. https://www.census.gov/construction/c30/oldtc.html.
CB (US Census Bureau). 2019b. “Construction spending 1993–2018—Historical put in place—annual.” Accessed July 18, 2019. https://www.census.gov/construction/c30/historical_data.html.
Chan, D. W. M., and M. M. Kumaraswamy. 1995. “A study of the factors affecting construction durations in Hong Kong.” J. Constr. Manage. Econ. 13 (4): 319–333. https://doi.org/10.1080/01446199500000037.
Chang, S., J.-S. Yi, and J. Son. 2015. “The productivity improvement for steel framing work efficiency by work sampling and 5-minute rating technique.” J. Constr. Eng. Project Manage. 5 (1): 40–46. https://doi.org/10.6106/JCEPM.2015.5.1.040.
Changali, S., A. Mohammad, and M. V. Nieuwland. 2015. The construction productivity imperative. McKinsey Productivity Sciences Center.
Chitla, V. R., and T. S. Abdelhamid. 2003. “Comparing process improvement initiatives based on percent plan complete and labour utilization factors.” In Proc., 11th Annual Conf. of the Int. Group for Lean Construction. Cusco, Peru: International Group for Lean Construction.
Choy, E., and J. Y. Ruwanpura. 2006. “Predicting construction productivity using situation-based simulation models.” Can. J. Civ. Eng. 33 (12): 1585–1600. https://doi.org/10.1139/l06-088.
Christian, J., and D. Hachey. 1995. “Effects of delay times on production rates in construction.” J. Constr. Eng. Manage. 121 (1): 20–26. https://doi.org/10.1061/(ASCE)0733-9364(1995)121:1(20).
CII (Construction Industry Institute). 2010. Guide to activity analysis. Austin, TX: Univ. of Texas.
Cohen, J. 1988. Statistical power analysis for the behavioral sciences. Mahwah, NJ: Lawrence Erlbaum Associates.
Cohen, J. 1992. “A power primer.” Psychol. Bull. 112 (1): 155–159. https://doi.org/10.1037/0033-2909.112.1.155.
Cramer, D. 2003. Fundamental statistics for social research: Step-by-step calculations and computer techniques using SPSS for windows. London: Routledge.
Cramer, D., and D. L. Howitt. 2004. The Sage dictionary of statistics: A practical resource for students in the social sciences. London: Sage Publications.
Da Silva, S. F. P. 2006. “Developing planning best practices to improve construction productivity.” M.Sc. thesis, Dept. of Civil Engineering, Univ. of Calgary.
DCAA (Defence Contract Audit Agency). 2012. Defence contract audit manual. Fort Belvoir, VA: DCAA.
Doane, D. P., and L. E. Seward. 2011. “Measuring skewness: A forgotten statistic?” J. Stat. Educ. 19 (2): 1–18. https://doi.org/10.1080/10691898.2011.11889611.
Dozzi, S. P., and S. M. AbouRizk. 1993. Productivity in construction. Ottawa: Institute for Research in Construction—National Research Council.
Enshassi, A., K. A. Al-Halaq, and Z. Abu Mustafa. 2011. “Labor productivity measurement in building projects.” Islamic Univ. J. (Ser. Nat. Stud. Eng.) 19 (1): 103–119.
Field, A. 2018. Discovering statistics using IBM SPSS statistics. Thousand Oaks, CA: Sage Publications.
Fischer, M., A. Khanzode, D. Reed, and H. W. Ashcraft. 2017. Integrating project delivery. Hoboken, NJ: Wiley.
Forsberg, A., and L. Saukkoriipi. 2007. “Measurement of waste and productivity in relation to lean thinking.” In Proc., 15th Annual Conf. of the Int. Group for Lean Construction. Cusco, Peru: International Group for Lean Construction.
Forsythe, P. 2018. “Extending and operationalizing construction productivity measurement on building projects.” J. Constr. Manage. Econ. 36 (12): 683–699. https://doi.org/10.1080/01446193.2018.1480834.
Géron, A. 2017. Hands-on machine learning with Scikit-Learn and TensorFlow: Concepts, tools, and techniques to build intelligent systems. Newton, MA: O’Reilly Media Inc.
Gilleard, J. D. 1992. “The creation and use of labor productivity standards among specialist subcontractors in the construction industry.” J. Cost Eng. 34 (4): 11–16.
Gong, J., J. D. Borcherding, and C. H. Caldas. 2011. “Effectiveness of craft time utilization in construction projects.” J. Constr. Manage. Econ. 29 (7): 737–751. https://doi.org/10.1080/01446193.2011.595013.
Gonzalez, V., L. F. Alarcon, and F. Mundaca. 2008. “Investigating the relationship between planning reliability and project performance.” Prod. Plann. Control 19 (5): 461–474. https://doi.org/10.1080/09537280802059023.
Goodfellow, I., Y. Bengio, and A. Courville. 2016. Deep learning. Cambridge, MA: MIT Press.
Gouett, M. C. 2010. “Activity analysis for continuous productivity improvement in construction.” M.Sc. thesis, Dept. of Civil and Environmental Engineering, Univ. of Waterloo.
Gouett, M. C., C. T. Haas, P. M. Goodrum, and C. H. Caldas. 2011. “Activity analysis for direct-work rate improvement in construction.” J. Constr. Eng. Manage. 137 (12): 1117–1124. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000375.
Hajikazemi, S., B. Andersen, and J. A. Langlo. 2017. “Analyzing electrical installation labor productivity through work sampling.” Int. J. Prod. Perform. Manage. 66 (4): 539–553. https://doi.org/10.1108/IJPPM-06-2016-0122.
Handa, V., H. Thomas, and R. Horner. 1990. “International collaborative field study of masonry productivity.” In Proc., Int. Symp. on Value in Building Economics and Construction Management. Abingdon, UK: Taylor & Francis.
Handa, V. K., and O. Abdalla. 1989. “Forecasting productivity by work sampling.” J. Constr. Manage. Econ. 7 (1): 19–28. https://doi.org/10.1080/01446198900000003.
Harrison, P. 2007. Can measurement error explain the weakness of productivity growth in the Canadian construction industry?. Ottawa: Centre for the Study of Living Standards.
Heinz, K. G. R. 1984. “Performance measures by means of activity sampling.” Trans. Am. Assoc. Cost Eng. 4: 1–8.
Hewage, K. N., and J. Y. Ruwanpura. 2006. “Carpentry workers issues and efficiencies related to construction productivity in commercial construction projects in Alberta.” Can. J. Civ. Eng. 33 (8): 1075–1089. https://doi.org/10.1139/l06-050.
Horner, M., and R. Duff. 2001. More for less: A contractor’s guide to improving productivity in construction. London: Construction Industry Research and Information Association.
Horner, R., B. Talhouni, and R. Whitehead. 1987. “Measurement of factors affecting labour productivity on construction sites.” In Proc., Managing Construction World Wide, Volume II: “Productivity and Human Factors in Construction”. New York: E. and F.N. Spon.
Hwang, B.-G., P. Krishnankutty, L. Zhu, C. H. Caldas, A. Shounak, and S. Mulva. 2018. “Improving labour productivity in process construction maintenance and shutdown/turnaround projects.” Int. J. Constr. Manage. 1–15. https://doi.org/10.1080/15623599.2018.1492664.
Jenkins, J. L., and D. L. Orth. 2004a. “Mechanical and general construction productivity results.” J. Cost Eng. 46 (3): 33–36.
Jenkins, J. L., and D. L. Orth. 2004b. “Productivity improvement through work sampling.” J. Cost Eng. 46 (3): 27–32.
Jensen, A. P. H., and C. E. J. Martiny. 2016. “Leanværktøjer ved ledningsarbejder [Lean tools applied to pipework].” B.Sc. thesis, DTU Management Engineering, Denmarks Technical Univ.
Josephson, P. E., and L. Björkman. 2013. “Why do work sampling studies in construction? The case of plumbing work in Scandinavia.” J. Eng. Constr. Archit. Manage. 20 (6): 589–603. https://doi.org/10.1108/ECAM-12-2011-0108.
Kalsaas, B. T. 2010. “Work-time waste in construction.” In Proc., 20th Annual Conf. of the Int. Group for Lean Construction. Cusco, Peru: International Group for Lean Construction.
Kalsaas, B. T., M. Gundersen, and T. O. Berge. 2014. “To measure workflow and waste: A concept for continuous improvement.” In Proc., 22nd Annual Conf. of the Int. Group for Lean Construction. Cusco, Peru: International Group for Lean Construction.
Kaming, P. F., P. O. Olomolaiye, G. D. Holt, and F. C. Harris. 1997. “Factors influencing craftsmen’s productivity in Indonesia.” Int. J. Project Manage. 15 (1): 21–30. https://doi.org/10.1016/S0263-7863(96)00019-1.
Kenley, R., and O. Seppänen. 2010. Location-based management for construction—Planning, scheduling and control. London: Spoon Press.
Kisi, K. P. 2015. “Estimation of optimal productivity in labor-intensive construction operations.” Ph.D. thesis, Faculty of the Graduate College, Univ. of Nebraska-Lincoln.
Kumar, Y., G. H. Kumar, S. B. Mynemi, and C. S. Charan. 2014. “Productivity analysis of small construction projects in India.” Asian J. Appl. Sci. 7 (4): 262–267. https://doi.org/10.3923/ajaps.2014.262.267.
Laufer, A., and G. D. Jenkins. 1982. “Motivating construction workers.” J. Constr. Div. 108 (4): 531–545.
Lema, N., and A. Price. 1996. “Construction process performance variability: Focus on labour productivity.” Build. Res. Inf. 24 (6): 339–350. https://doi.org/10.1080/09613219608727554.
Liou, F.-S., and J. D. Borcherding. 1986. “Work sampling can predict unit rate productivity.” J. Constr. Eng. Manage. 112 (1): 90–103. https://doi.org/10.1061/(ASCE)0733-9364(1986)112:1(90).
Liu, M., G. Ballard, and W. Ibbs. 2011. “Work flow variation and labor productivity: Case study.” J. Manage. Eng. 27 (4): 236–242. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000056.
Logcher, R. D., and W. W. Collins. 1978. “Management impacts on labor productivity.” J. Constr. Div. 104 (4): 447–461.
Maarof, A., and S. Easeph. 2017. “Construction labour productivity, Botrygg case studies.” M.Sc. thesis, Dept. of Architecture and Civil Engineering, Chalmers Univ. of Technology.
Mani, N. 2015. “A framework for estimating labor productivity frontiers.” Ph.D. thesis, Faculty of the Graduate College, Univ. of Nebraska.
Muralidharan, S., P. Krishnankutty, B.-G. Hwang, C. Caldas, and S. Mulva. 2018. “Enhancing labour productivity in petrochemical construction and maintenance projects.” In Proc., 26th Annual Conf. of the Int. Group for Lean Construction. Cusco, Peru: International Group for Lean Construction.
Nasir, H., H. Ahmed, C. Haas, and P. M. Goodrum. 2014. “An analysis of construction productivity differences between Canada and the United States.” J. Constr. Manage. Econ. 32 (6): 595–607. https://doi.org/10.1080/01446193.2013.848995.
Nasir, H., C. T. Haas, C. H. Caldas, and P. M. Goodrum. 2016. “An integrated productivity-practices implementation index for planning the execution of infrastructure projects.” J. Infrastruct. Syst. 22 (2): 04015022. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000275.
Neve, H., and S. Wandahl. 2018. “Towards identifying making-do as lead waste in refurbishment projects.” In Proc., 26th Annual Conf. of the Int. Group for Lean Construction. Cusco, Peru: International Group for Lean Construction.
Neve, H., S. Wandahl, and J. Lerche. 2019. “Feedback loop: The missing link in activity analysis.” In Proc., 10th Int. Conf. on Engineering, Project, and Production Management. Singapore: Springer.
Nielsen, A. C. S., and E. L. Kristensen. 2002. “Plan byg - Effektivisering af byggeprocessen visualiseret ved spillet plan byg [Plan build - Optimsing the construction process by visualisation in the game plan build].” M.Sc. thesis, Dept. of Production, Aalborg Univ.
Noor, I. 1998. “Measuring construction labor productivity by daily visits.” AACE Int. Trans. 1–6.
OECD (Organisation for Economic Co-operation and Development). 2019. “Purchasing power parities (PPP).” Accessed July 18, 2019. https://data.oecd.org/conversion/purchasing-power-parities-ppp.htm.
Oglesby, C. H., H. W. Parker, and G. A. Howell. 1989. Productivity improvement in construction. New York: McGraw-Hill College.
Olomolaiye, P., A. Jayawardane, and F. Harris. 1998. Construction productivity management. Harlow, UK: Longman.
Olomolaiye, P. O. 1990. “An evaluation of the relationships between bricklayers’ motivation and productivity.” J. Constr. Manage. Econ. 8 (3): 301–313. https://doi.org/10.1080/01446199000000025.
Olomolaiye, P. O., K. A. Wahab, and A. D. F. Price. 1987. “Problems influencing craftsmen’s productivity in Nigeria.” Build. Environ. 22 (4): 317–323. https://doi.org/10.1016/0360-1323(87)90024-2.
Parker, N., N. Lema, and G. Mlingwa. 1987. “An analysis of labour productivity in Tanzania.” In Proc., 5th CIB W65 Int. Symp. on the Organisation and Management of Construction: Managing Construction Worldwide. New York: E. & F. N. Spon.
Peer, S. 1986. “An improved systematic activity sampling technique for work study.” J. Constr. Manage. Econ. 4 (2): 151–159. https://doi.org/10.1080/01446198600000012.
Picard, H. E. 2002. “Construction process measurement and improvement.” In Proc., 10th Annual Conf. of the Int. Group for Lean Construction. Cusco, Peru: International Group for Lean Construction.
Pradeepkumar, C., and S. Loganathan. 2015. “A study on minimization of construction waste through work sampling.” Int. J. Sci. Eng. Res. 3 (4): 5687–5691.
Richardson, W. J. 1976. Cost improvement, work sampling, and short interval scheduling. Reston, VA: Reston Publishing Company.
Rogge, D. F., and R. L. Tucker. 1982. “Foreman-delay surveys: Work sampling and output.” J. Constr. Div. 108 (4): 592–604.
Salim, M., and L. E. Bernold. 1994. “Effects of design-integrated process planning on productivity in rebar placement.” J. Constr. Eng. Manage. 120 (4): 720–738. https://doi.org/10.1061/(ASCE)0733-9364(1994)120:4(720).
SC (Statistics Canada). 2019a. “Key information on Canada’s economy, society and environment.” Accessed July 18, 2019. https://www.statcan.gc.ca/eng/start.
SC (Statistics Canada). 2019b. “Table 36-10-0434-01, Gross domestic product (GDP) at basic prices, by industry, monthly (x 1,000,000).” Accessed July 18, 2019. https://www150.statcan.gc.ca/t1/tbl1/en/tv.action?pid=3610043401.
SC (Statistics Canada). 2019c. “Table 36-10-0375-01, Gross domestic product (GDP) at factor cost in 1992 constant prices, by Standard Industrial Classification, 1980 (SIC), annual (x 1,000,000).” Accessed July 18, 2019. https://www150.statcan.gc.ca/t1/tbl1/en/cv.action?pid=3610037501#timeframe.
SC (Statistics Canada). 2019d. “Table 36-10-0480-01, Labour productivity and related measures by business sector industry and by non-commercial activity consistent with the industry accounts.” Accessed July 18, 2019. https://www150.statcan.gc.ca/t1/tbl1/en/cv.action?pid=3610048001.
SC (Statistics Canada). 2019e. “Table 36-10-0303-01, Labour productivity and related variables, by industry according to the Canadian System of National Accounts (x 1,000,000).” Accessed July 18, 2019. https://www150.statcan.gc.ca/t1/tbl1/en/cv.action?pid=3610030301.
Serpell, A., A. Venturi, and J. Contreras. 1995. “Characterization of waste in building construction projects.” In Proc., 3rd Annual Conf. of the Int. Group for Lean Construction. Boston: International Group for Lean Construction.
Shahtaheri, M. 2012. “Setting target rates for construction activity analysis categories.” M.Sc. thesis, Univ. of Waterloo.
Shahtaheri, M., H. Nasir, and C. T. Haas. 2015. “Setting baseline rates for on-site work categories in the construction industry.” J. Constr. Eng. Manage. 141 (5): 04014097. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000959.
Shehata, M. E., and K. M. El-Gohary. 2011. “Towards improving construction labor productivity and projects’ performance.” Alexandria Eng. J. 50 (4): 321–330. https://doi.org/10.1016/j.aej.2012.02.001.
Sheikh, N. A. 2016. “Benchmarking the labor productivity: An activity analysis on semi high rise building projects in Pakistan.” M.Sc. thesis, Dept. of Construction Engineering and Management, National Univ. of Sciences and Technology.
Sheikh, N. A., F. Ullah, B. Ayub, and M. J. Thaheem. 2017. “Labor productivity assessment using activity analysis on semi high-rise building projects in Pakistan.” Eng. J. 21 (4): 273–286. https://doi.org/10.4186/ej.2017.21.4.273.
Siriwardana, C. S., R. Titov, and J. Ruwanpura. 2017. “A study to investigate the relationship between work sampling categories and productivity for concrete slab formwork.” In Proc., 8th Int. Conf. on Structural Engineering and Construction Management. Peradeniya, Sri Lanka: Univ. of Peradeniya.
Skovbogaard, J. 2017. “Creating a baseline of productivity in the refurbishment sector and identifying potential improvements using lean tools.” M.Sc. thesis, Dept. of Engineering, Aarhus Univ.
Stathakis, N. 1988. “Productivity in construction: An issue of analysis and measurement.” M.Sc. thesis, Massachusetts Institute of Technology.
Stevens, A. 1987. “Housebuilding productivity in the UK—Results of case studies.” In Vol. 2 of Proc., 5th CIB W65 Int. Symp. on the Organisation and Management of Construction: Managing Construction Worldwide, 697–708. London: International Council for Building.
Stevenson, W. J. 2011. Operations management. New York: McGraw-Hill/Irwin.
Strandberg, J., and P.-E. Josephson. 2005. “What do construction workers do? Direct observations in housing projects.” In Proc., 11th Joint CIB Int. Symp. Combining Forces, Advancing Facilities Management and Construction through Innovation. Helsinki, Finland: Association of Finnish Civil Engineers.
Sveikauskas, L., S. Rowe, J. Mildenberger, J. Price, and A. Young. 2016. “Productivity growth in construction.” J. Constr. Eng. Manage. 142 (10): 04016045. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001138.
Teicholz, P., P. M. Goodrum, and C. T. Haas. 2001. “US construction labor productivity trends, 1970–1998.” J. Constr. Eng. Manage. 127 (5): 427–429. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:5(427).
Teicholz, P. M. 2013. “Labor-productivity declines in the construction industry: Causes and remedies (a second look).” In AECbytes viewpoint. Santa Clara, CA: AECbytes.
Teizer, J., H. Neve, H. Li, S. Wandahl, J. König, B. Ochner, M. König, and J. Lerche. 2020. “Construction resource efficiency improvement by Long Range Wide Area Network tracking and monitoring.” Autom. Constr. 116: 103245. https://doi.org/10.1016/j.autcon.2020.103245.
Terp, B. E., N. M. Christiansen, and I. M. Lindegaard. 1987. Metode Styring - Produktionsteknik [Method Management - Production Technology]. Copenhagen, Denmark: Erhversskolernes Forlag.
Thomas, H. R., Jr. 1981. “Can work sampling lower construction costs.” J. Constr. Div. 107 (2): 263–278.
Thomas, H. R. 1991. “Labor productivity and work sampling: The bottom line.” J. Constr. Eng. Manage. 117 (3): 423–444. https://doi.org/10.1061/(ASCE)0733-9364(1991)117:3(423).
Thomas, H. R., and J. Daily. 1983. “Crew performance measurement via activity sampling.” J. Constr. Eng. Manage. 109 (3): 309–320. https://doi.org/10.1061/(ASCE)0733-9364(1983)109:3(309).
Thomas, H. R., J. M. Guevara, and C. T. Gustenhoven. 1984. “Improving productivity estimates by work sampling.” J. Constr. Eng. Manage. 110 (2): 178–188. https://doi.org/10.1061/(ASCE)0733-9364(1984)110:2(178).
Thomas, H. R., and M. P. Holland. 1980. “Work sampling programs: Comparative analysis.” J. Constr. Div. 106 (4): 519–534.
Thomas, H. R., M. P. Holland, and C. T. Gustenhoven. 1982. “Games people play with work sampling.” J. Constr. Div. 108 (1): 13–22.
Thomas, H. R., W. F. Maloney, R. M. W. Horner, G. R. Smith, V. K. Handa, and S. R. Sanders. 1990. “Modeling construction labor productivity.” J. Constr. Eng. Manage. 116 (4): 705–726. https://doi.org/10.1061/(ASCE)0733-9364(1990)116:4(705).
Thomas, H. R., and C. T. Mathews. 1986. An analysis of the methods for measuring construction productivity. Austin, TX: Construction Industry Institute, Univ. of Texas.
Thune-Holm, E., and K. Johansen. 2006. Produktivitetsmålinger i Skanska [Productivty Measurement in Skanska]. Stockholm, Sweden: Skanska.
Tsehayae, A. A., and A. R. Fayek. 2012. “A research framework for work sampling and its application in developing comparative direct and support activity proportions for different trades.” In Proc., Construction Research Congress 2012: Construction Challenges in a Flat World. Reston, VA: ASCE.
Tsehayae, A. A., and A. R. Fayek. 2016. “System model for analysing construction labour productivity.” J. Constr. Innovation 16 (2): 203–228. https://doi.org/10.1108/CI-07-2015-0040.
Wandahl, S., and J. Skovbogaard. 2017. “Towards improving productivity on refurbishment projects.” In Proc., 33rd Annual ARCOM Conf. Cambridge, UK: Association of Researchers in Construction Management.
WEF and BCG (World Economic Forum and Boston Consulting Group). 2016. Shaping the future of construction: A breakthrough in mindset and technology. Cologny, Switzerland: WEF.
Winch, G., and B. Carr. 2001. “Benchmarking on-site productivity in France and the UK: A CALIBRE approach.” J. Constr. Manage. Econ. 19 (6): 577–590. https://doi.org/10.1080/01446190110062465.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 146Issue 9September 2020

History

Received: Nov 18, 2019
Accepted: Mar 13, 2020
Published online: Jun 29, 2020
Published in print: Sep 1, 2020
Discussion open until: Nov 29, 2020

Permissions

Request permissions for this article.

Authors

Affiliations

Ph.D. Student, Dept. of Engineering, Aarhus Univ., Inge Lehmanns Gade 10, Aarhus 8000, Denmark (corresponding author). ORCID: https://orcid.org/0000-0003-2311-3529. Email: [email protected]
Professor, Dept. of Engineering, Aarhus Univ., Inge Lehmanns Gade 10, Aarhus 8000, Denmark. ORCID: https://orcid.org/0000-0001-8708-6035. Email: [email protected]
Associate Professor, Dept. of the Built Environment, Aalborg Univ., Thomas Manns Vej 23, Aalborg 9220, Denmark. ORCID: https://orcid.org/0000-0001-8959-1262. Email: [email protected]
Jochen Teizer [email protected]
Associate Professor, Dept. of Engineering, Aarhus Univ., Inge Lehmanns Gade 10, Aarhus 8000, Denmark. Email: [email protected]
Ph.D. Student, Dept. of Business Development and Technology, Aarhus Univ., Birk Centerpark 15, Herning 7400, Denmark. ORCID: https://orcid.org/0000-0001-7076-9630. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share