Improving Information Sharing in Major Construction Projects through OC and POC: RDT Perspective

Publication: Journal of Construction Engineering and Management
Volume 146, Issue 7

Abstract

A vast amount of information is produced in each phase of major construction projects. However, extensive project lifespans and complex organizational relationships may contribute to significant information loss, attenuation, and separation during the transmission process. Consequently, some important information (i.e., regarding costs, schedules, materials, facilities, properties, etc.) may be suspended or interrupted when being passed to corresponding organizations; this seriously affects project management performance. One effective solution is to increase the amount of information sharing (IS). This study was aimed at exploring the mechanism of how organization change (OC) and process operation capability (POC) influence IS in major construction projects from the perspective of resource dependence theory (RDT). The relationships between IS, OC, and POC were examined using 444 questionnaires collected from managers working in major construction projects across Jiangsu, China. On this basis, indicators to measure OC, POC, and IS in the context of major construction projects were established. In addition, the effects of strategies that improve IS from OC and POC were quantified by combining the structural equation model (SEM) with a fuzzy cognitive map (FCM). The results showed that (1) both OC and POC have a positive impact on IS, and POC serves to mediate the influence of OC; (2) the indicators for measuring IS, OC, and POC demonstrate good reliability and validity; and (3) with mediation of POC, the effects of improvements to IS can be doubled when OC is increased, relative to implementing POC alone. This research contributes to the IS literature by demonstrating and quantifying the positive effects of OC and POC on IS from the perspective of RDT. Moreover, the identified indicators provide major construction projects with a promising tool for assessing IS, OC, and POC. Practical strategies for improving IS and managerial implications of the indicators are also discussed in the context of major construction projects.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or code generated or used during the study are available from the corresponding author by request.

Acknowledgments

The authors gratefully acknowledge all survey participants and reviewers of the paper and financial support from the National Natural Science Foundation of China (Grant Nos. NSFC-71671042 and 71472037), the National Key Research and Development Program (Grant No. 2016YFC0702001-06), the Social Science Foundation of China (Grant No. 14AJY013), the Postgraduate Research & Practice Innovation Program of Jiangsu Province (Grant No. KYLX15_0095), and the Fundamental Research Funds for the Central Universities, China.

References

Abduh, M., B. W. Soemardi, and R. D. Wirahadikusumah. 2012. “Indonesian construction supply chains cost structure and factors: A case study of two projects.” J. Civ. Eng. Manage. 18 (2): 209–216. https://doi.org/10.3846/13923730.2012.671259.
Ahn, Y. H., Y. H. Kwak, and S. J. Suk. 2015. “Contractors’ transformation strategies for adopting building information modeling.” J. Manage. Eng. 32 (1): 5015005. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000390.
Alashwal, A. M., and P. S.-W. Fong. 2015. “Empirical study to determine fragmentation of construction projects.” J. Constr. Eng. Manage. 141 (7): 4015016. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000986.
Arif, F., S. H. Lodi, and N. Azhar. 2015. “Factors influencing accuracy of construction project cost estimates in Pakistan: Perception and reality.” Int. J. Constr. Manage. 15 (1): 59–70. https://doi.org/10.1080/15623599.2015.1012141.
Bahoque, E., O. Gómez, and L. Pietrosemoli. 2007. “Knowledge management in the construction industry: Study of a case.” Venezuelan Mag. Manage. 12 (39): 393–409.
Baron, R. M., and D. A. Kenny. 1986. “The moderator–mediator variable distinction in social psychological research: Conceptual, strategic, and statistical considerations.” J. Personality Soc. Psychol. 51 (6): 1173. https://doi.org/10.1037/0022-3514.51.6.1173.
Barratt, M., and R. Barratt. 2011. “Exploring internal and external supply chain linkages: Evidence from the field.” J. Oper. Manage. 29 (5): 514–528. https://doi.org/10.1016/j.jom.2010.11.006.
Barratt, M., and A. Oki. 2007. “Antecedents of supply chain visibility in retail supply chains: A resource-based theory perspective.” J. Oper. Manage. 25 (6): 1217–1233.
Barua, A., S. Ravindran, and A. B. Whinston. 2007. “Enabling information sharing within organizations.” Inf. Technol. Manage. 8 (1): 31–45. https://doi.org/10.1007/s10799-006-0001-7.
Bercovitz, J., and M. Feldman. 2008. “Academic entrepreneurs: Organizational change at the individual level.” Organ. Sci. 19 (1): 69–89. https://doi.org/10.1287/orsc.1070.0295.
Bode, C., S. M. Wagner, K. J. Petersen, and L. M. Ellram. 2011. “Understanding responses to supply chain disruptions: Insights from information processing and resource dependence perspectives.” Acad. Manage. J. 54 (4): 833–856. https://doi.org/10.5465/amj.2011.64870145.
Bollen, K. A., and J. Pearl. 2013. “Eight myths about causality and structural equation models.” In Handbook of causal analysis for social research, 301–328. Berlin: Springer.
Browne, M. W., R. Cudeck, K. A. Bollen, and J. S. Long. 1993. “Alternative ways of assessing model fit.” Testing Struct. Equation Models 154 (1): 136.
Bunderson, J. S., and K. M. Sutcliffe. 2002. “Comparing alternative conceptualizations of functional diversity in management teams: Process and performance effects.” Acad. Manage. J. 45 (5): 875–893. https://doi.org/10.5465/3069319.
Burnes, B. 2004. “Emergent change and planned change–competitors or allies? The case of XYZ construction.” Int. J. Oper. Prod. Manage. 24 (9): 886–902. https://doi.org/10.1108/01443570410552108.
Burnes, B. 2005. “Complexity theories and organizational change.” Int. J. Manage. Rev. 7 (2): 73–90. https://doi.org/10.1111/j.1468-2370.2005.00107.x.
By, R. T., and C. Dale. 2008. “The successful management of organisational change in tourism SMEs: Initial findings in UK visitor attractions.” Int. J. Tourism Res. 10 (4): 305–313. https://doi.org/10.1002/jtr.663.
Cao, D., H. Li, and G. Wang. 2017. “Impacts of building information modeling (BIM) implementation on design and construction performance: A resource dependence theory perspective.” Front. Eng. Manage. 4 (1): 20–34. https://doi.org/10.15302/J-FEM-2017010.
Casciaro, T., and M. J. Piskorski. 2005. “Power imbalance, mutual dependence, and constraint absorption: A closer look at resource dependence theory.” Administrative Sci. Q. 50 (2): 167–199. https://doi.org/10.2189/asqu.2005.50.2.167.
Castrogiovanni, G. J., and B. A. Macy. 1990. “Organizational information-processing capabilities and degree of employee participation: A longitudinal field experiment.” Group Organ. Stud. 15 (3): 313–336. https://doi.org/10.1177/105960119001500306.
Cheikhrouhou, N., M. Pouly, and G. Madinabeitia. 2013. “Trust categories and their impacts on information exchange processes in vertical collaborative networked organisations.” Int. J. Computer Integr. Manuf. 26 (1–2): 87–100. https://doi.org/10.1080/0951192X.2012.681913.
Chen, C.-S., Y.-K. Tsui, R.-J. Dzeng, and W.-C. Wang. 2015. “Application of project-based change management in construction: A case study.” J. Civ. Eng. Manage. 21 (1): 107–118. https://doi.org/10.3846/13923730.2013.802712.
Chen, Y. Q., Y. B. Zhang, J. Y. Liu, and P. Mo. 2011. “Interrelationships among critical success factors of construction projects based on the structural equation model.” J. Manage. Eng. 28 (3): 243–251. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000104.
Cheng, E. W. L., N. Ryan, and S. Kelly. 2012. “Exploring the perceived influence of safety management practices on project performance in the construction industry.” Saf. Sci. 50 (2): 363–369. https://doi.org/10.1016/j.ssci.2011.09.016.
Cheng, H., X. Li, and Y. Qian. 2005. “Integrated modelling of process operation systems using the agent-oriented approach.” Can. J. Chem. Eng. 83 (2): 291–299. https://doi.org/10.1002/cjce.5450830215.
Cheng, J.-H., S.-W. Chen, and F.-Y. Chen. 2013. “Exploring how inter-organizational relational benefits affect information sharing in supply chains.” Inf. Technol. Manage. 14 (4): 283–294. https://doi.org/10.1007/s10799-013-0165-x.
Conrado, D. J., M. O. Karlsson, K. Romero, C. Sarr, and J. J. Wilkins. 2017. “Open innovation: Towards sharing of data, models and workflows.” Eur. J. Pharm. Sci. 109 (Nov): S65–S71. https://doi.org/10.1016/j.ejps.2017.06.035.
Crowston, K. 1997. “A coordination theory approach to organizational process design.” Organ. Sci. 8 (2): 157–175. https://doi.org/10.1287/orsc.8.2.157.
Crowther, K. G. 2014. “Understanding and overcoming information sharing failures.” J. Homeland Secur. Emergency Manage. 11 (1): 131–154. https://doi.org/10.1515/jhsem-2013-0055.
Davis, F. D. 1993. “User acceptance of information technology: System characteristics, user perceptions and behavioral impacts.” Int. J. Man Mach. Stud. 38 (3): 475–487. https://doi.org/10.1006/imms.1993.1022.
Dutt, N., and J. Joseph. 2019. “Regulatory uncertainty, corporate structure, and strategic agendas: Evidence from the US renewable electricity industry.” Acad. Manage. J. 62 (3): 800–827. https://doi.org/10.5465/amj.2016.0682.
Dwyer, L., and R. Mellor. 1991. “Organizational environment, new product process activities, and project outcomes.” J. Product Innovation Manage. 8 (1): 39–48. https://doi.org/10.1111/1540-5885.810777.
Edum-Fotwe, F. T., and R. McCaffer. 2000. “Developing project management competency: Perspectives from the construction industry.” Int. J. Project Manage. 18 (2): 111–124. https://doi.org/10.1016/S0263-7863(98)90075-8.
Elg, U., and U. Johansson. 1997. “Decision making in inter-firm networks as a political process.” Organ. Stud. 18 (3): 361–384. https://doi.org/10.1177/017084069701800302.
Erdogan, B., C. J. Anumba, D. Bouchlaghem, and Y. Nielsen. 2013. “Collaboration environments for construction: Management of organizational changes.” J. Manage. Eng. 30 (3): 4014002. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000231.
Errichiello, L., and T. Pianese. 2016. “Organizational control in the context of remote work arrangements: A conceptual framework.” Stud. Managerial Financial Accounting 31 (Jul): 273–305. https://doi.org/10.1108/S1479-351220160000031009.
Faniran, O. O., and G. Caban. 1998. “Minimizing waste on construction project sites.” Eng. Constr. Archit. Manage. 5 (2): 182–188. https://doi.org/10.1108/eb021073.
Flores, W. R., E. Antonsen, and M. Ekstedt. 2014. “Information security knowledge sharing in organizations: Investigating the effect of behavioral information security governance and national culture.” Comput. Secur. 43 (Jun), 90–110.
Fox, J., and G. Monette. 2002. An R and S-Plus companion to applied regression. Thousand Oaks, CA: Sage.
Frank, K. A., W. R. Penuel, and A. Krause. 2015. “What is a ‘good’ social network for policy implementation? The flow of know-how for organizational change.” J. Policy Anal. Manage. 34 (2): 378–402. https://doi.org/10.1002/pam.21817.
Garbarino, E., and M. S. Johnson. 1999. “The different roles of satisfaction, trust, and commitment in customer relationships.” J. Marketing 63 (2): 70–87. https://doi.org/10.1177/002224299906300205.
Glueck, W. F. 1969. “Organization change in business and government.” Acad. Manage. J. 12 (4): 439–449. https://doi.org/10.5465/254732.
Griffith, A. D., H. S. Lee, C. Seob Yeo, and R. Calantone. 2014. “Marketing process adaptation: Antecedent factors and new product performance implications in export markets.” Int. Marketing Rev. 31 (3): 308–334. https://doi.org/10.1108/IMR-06-2013-0113.
Guo, F., Y. Chang-Richards, S. Wilkinson, and T. C. Li. 2014. “Effects of project governance structures on the management of risks in major infrastructure projects: A comparative analysis.” Int. J. Project Manage. 32 (5): 815–826. https://doi.org/10.1016/j.ijproman.2013.10.001.
Guo, H. L., H. Li, and M. Skitmore. 2009. “Life-cycle management of construction projects based on virtual prototyping technology.” J. Manage. Eng. 26 (1): 41–47. https://doi.org/10.1061/(ASCE)0742-597X(2010)26:1(41).
Haponava, T., and S. Al-Jibouri. 2009. “Identifying key performance indicators for use in control of pre-project stage process in construction.” Int. J. Productivity Perform. Manage. 58 (2): 160–173. https://doi.org/10.1108/17410400910928743.
Hartmann, A. 2006. “The context of innovation management in construction firms.” Constr. Manage. Econ. 24 (6): 567–578. https://doi.org/10.1080/01446190600790629.
Henry, R. A. 1995. “Improving group judgment accuracy: Information sharing and determining the best member.” Organ. Behav. Human Dec. Processes 62 (2): 190–197. https://doi.org/10.1006/obhd.1995.1042.
Hillman, A. J., C. Shropshire, and A. A. Cannella Jr. 2007. “Organizational predictors of women on corporate boards.” Acad. Manage. J. 50 (4): 941–952. https://doi.org/10.5465/amj.2007.26279222.
Hillman, A. J., M. C. Withers, and B. J. Collins. 2009. “Resource dependence theory: A review.” J. Manage. 35 (6): 1404–1427. https://doi.org/10.1177/0149206309343469.
Hu, L., and P. M. Bentler. 1999. “Cutoff criteria for fit indexes in covariance structure analysis: Conventional criteria versus new alternatives.” Struct. Equation Modell. Multidiscip. J. 6 (1): 1–55. https://doi.org/10.1080/10705519909540118.
Huang, S.-C., S.-L. Lo, and Y.-C. Lin. 2013. “Application of a fuzzy cognitive map based on a structural equation model for the identification of limitations to the development of wind power.” Energy Policy 63 (Dec): 851–861. https://doi.org/10.1016/j.enpol.2013.09.012.
Hwang, B.-G., M. Shan, and K.-Y. Looi. 2018a. “Key constraints and mitigation strategies for prefabricated prefinished volumetric construction.” J. Cleaner Prod. 183 (May): 183–193. https://doi.org/10.1016/j.jclepro.2018.02.136.
Hwang, B.-G., X. Zhao, and K. W. Yang. 2018b. “Effect of BIM on rework in construction projects in Singapore: Status quo, magnitude, impact, and strategies.” J. Constr. Eng. Manage. 145 (2): 4018125. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001600.
Irgens, E. J. 2009. “Institutional bridging: Change projects as creators and carriers of knowledge.” Knowl. Manage. Res. Pract. 7 (2): 162–171. https://doi.org/10.1057/kmrp.2008.38.
Jiang, J. J., G. Klein, J. C.-A. Tsai, and Y. Li. 2018. “Managing multiple-supplier project teams in new software development.” Int. J. Project Manage. 36 (7): 925–939. https://doi.org/10.1016/j.ijproman.2018.07.002.
Kaipia, R., J. Holmström, J. Småros, and R. Rajala. 2017. “Information sharing for sales and operations planning: Contextualized solutions and mechanisms.” J. Oper. Manage. 52 (1): 15–29. https://doi.org/10.1016/j.jom.2017.04.001.
Kang, I., S. Lee, and J. Choi. 2004. “Using fuzzy cognitive map for the relationship management in airline service.” Expert Syst. Appl. 26 (4): 545–555. https://doi.org/10.1016/j.eswa.2003.10.012.
Kim, J. H., and H. J. Lee. 2012. “Extraction of user profile based on workflow and information flow.” Expert Syst. Appl. 39 (5): 5478–5487. https://doi.org/10.1016/j.eswa.2011.11.075.
Kobayashi, T., M. Tamaki, and N. Komoda. 2003. “Business process integration as a solution to the implementation of supply chain management systems.” Inf. Manage. 40 (8): 769–780. https://doi.org/10.1016/S0378-7206(02)00102-7.
Kwak, Y. H., H. Sadatsafavi, J. Walewski, and N. L. Williams. 2015. “Evolution of project based organization: A case study.” Int. J. Project Manage. 33 (8): 1652–1664. https://doi.org/10.1016/j.ijproman.2015.05.004.
Lam, C. K., X. Huang, and S. C. H. Chan. 2015. “The threshold effect of participative leadership and the role of leader information sharing.” Acad. Manage. J. 58 (3): 836–855. https://doi.org/10.5465/amj.2013.0427.
Larson, D. B., K. J. Strauss, and D. J. Podberesky. 2015. “Toward large-scale process control to enable consistent CT radiation dose optimization.” Am. J. Roentgenol. 204 (5): 959–966. https://doi.org/10.2214/AJR.14.13918.
Le, Q. T., D. Y. Lee, and C. S. Park. 2014. “A social network system for sharing construction safety and health knowledge.” Autom. Constr. 46 (Oct): 30–37. https://doi.org/10.1016/j.autcon.2014.01.001.
Lee, S., and H. Ahn. 2009. “Fuzzy cognitive map based on structural equation modeling for the design of controls in business-to-consumer e-commerce web-based systems.” Expert Syst. Appl. 36 (7): 10447–10460. https://doi.org/10.1016/j.eswa.2009.01.070.
Lee, S., B. G. Kim, and K. Lee. 2004. “Fuzzy cognitive map-based approach to evaluate EDI performance: A test of causal model.” Expert Syst. Appl. 27 (2): 287–299. https://doi.org/10.1016/j.eswa.2004.02.003.
Li, Q., Z. Yin, H.-Y. Chong, and Q. Shi. 2018. “Nexus of interorganizational trust, principled negotiation, and joint action for improved cost performance: Survey of Chinese megaprojects.” J. Manage. Eng. 34 (6): 4018036. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000634.
Li, S., and B. Lin. 2006. “Accessing information sharing and information quality in supply chain management.” Decis. Support Syst. 42 (3): 1641–1656. https://doi.org/10.1016/j.dss.2006.02.011.
Lin, L. H. 2014. “Organizational structure and acculturation in acquisitions: Perspectives of congruence theory and task interdependence.” J. Manage. 40 (7): 1831–1856. https://doi.org/10.1177/0149206312442385.
Liao, L., and E. A. L. Teo. 2019. “Managing critical drivers for building information modelling implementation in the Singapore construction industry: An organizational change perspective.” Int. J. Constr. Manage. 19 (3): 240–256. https://doi.org/10.1080/15623599.2017.1423165.
Lindhard, S., and J. K. Larsen. 2016. “Identifying the key process factors affecting project performance.” Eng. Constr. Archit. Manage. 23 (5): 657–673. https://doi.org/10.1108/ECAM-08-2015-0123.
Lines, B. C., A. J. Perrenoud, K. T. Sullivan, D. T. Kashiwag, and A. Pesek. 2016. “Implementing project delivery process improvements: Identification of resistance types and frequencies.” J. Manage. Eng. 33 (1): 4016031. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000480.
Lines, B. C., and P. K. Reddy Vardireddy. 2017. “Drivers of organizational change within the AEC industry: Linking change management practices with successful change adoption.” J. Manage. Eng. 33 (6): 4017031. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000548.
Liu, B., Y. Li, B. Xue, Q. Li, P. X. W. Zou, and L. Li. 2018. “Why do individuals engage in collective actions against major construction projects?—An empirical analysis based on Chinese data.” Int. J. Project Manage. 36 (4): 612–626. https://doi.org/10.1016/j.ijproman.2018.02.004.
Lu, Y., L. Luo, H. Wang, Y. Le, and Q. Shi. 2015. “Measurement model of project complexity for large-scale projects from task and organization perspective.” Int. J. Project Manage. 33 (3): 610–622. https://doi.org/10.1016/j.ijproman.2014.12.005.
MacKinnon, D. P., A. J. Fairchild, and M. S. Fritz. 2007. “Mediation analysis.” Annu. Rev. Psychol. 58 (1): 593–614. https://doi.org/10.1146/annurev.psych.58.110405.085542.
Malone, T. W., and K. Crowston. 1994. “The interdisciplinary study of coordination.” ACM Comput. Surv. (CSUR) 26 (1): 87–119.https://doi.org/10.1145/174666.174668.
Mesmer-Magnus, J. R., and L. A. DeChurch. 2009. “Information sharing and team performance: A meta-analysis.” J. Appl. Psychol. 94 (2): 535. https://doi.org/10.1037/a0013773.
Michel, A. 2014. “The mutual constitution of persons and organizations: An ontological perspective on organizational change.” Organ. Sci. 25 (4): 1082–1110. https://doi.org/10.1287/orsc.2013.0887.
Min, J. U., and H. C. Bjornsson. 2008. “Agent-based construction supply chain simulator (CS2) for measuring the value of real-time information sharing in construction.” J. Manage. Eng. 24 (4): 245–254. https://doi.org/10.1061/(ASCE)0742-597X(2008)24:4(245).
Miranda, S. M., and C. S. Saunders. 2003. “The social construction of meaning: An alternative perspective on information sharing.” Inf. Syst. Res. 14 (1): 87–106. https://doi.org/10.1287/isre.14.1.87.14765.
Mohamed, S. 2002. “Safety climate in construction site environments.” J. Constr. Eng. Manage. 128 (5): 375–384. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:5(375).
Mok, K. Y., G. Q. Shen, and J. Yang. 2015. “Stakeholder management studies in mega construction projects: A review and future directions.” Int. J. Project Manage. 33 (2): 446–457. https://doi.org/10.1016/j.ijproman.2014.08.007.
Mone, E. M., B. Price, and C. Eisinger. 2011. “Performance management: Process perfection or process utility?” Ind. Organ. Psychol. 4 (2): 184–187. https://doi.org/10.1111/j.1754-9434.2011.01322.x.
Neumann, S., and E. Segev. 1979. “A case study of user evaluation of information characteristics for systems improvement.” Inf. Manage. 2 (6): 271–278. https://doi.org/10.1016/0378-7206(79)90025-9.
Ng, S. T., K. P. Cheng, and R. M. Skitmore. 2005. “A framework for evaluating the safety performance of construction contractors.” Build. Environ. 40 (10): 1347–1355. https://doi.org/10.1016/j.buildenv.2004.11.025.
Nielsen, Y., and O. Koseoglu. 2007. “Wireless networking in tunnelling projects.” Tunnelling Underground Space Technol. 22 (3): 252–261. https://doi.org/10.1016/j.tust.2006.08.004.
Olanipekun, A. O., B. Xia, C. Hon, and A. Darko. 2017. “Effect of motivation and owner commitment on the delivery performance of green building projects.” J. Manage. Eng. 34 (1): 4017039. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000559.
Ozorhon, B. 2012. “Analysis of construction innovation process at project level.” J. Manage. Eng. 29 (4): 455–463. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000157.
Pai, F.-Y., and T.-M. Yeh. 2014. “The effects of information sharing and interactivity on the intention to use social networking websites.” Qual. Quantity 48 (4): 2191–2207. https://doi.org/10.1007/s11135-013-9886-5.
Parker, R. J., and L. Kyj. 2006. “Vertical information sharing in the budgeting process.” Accounting Organ. Soc. 31 (1): 27–45. https://doi.org/10.1016/j.aos.2004.07.005.
Preacher, K. J., and A. F. Hayes. 2004. “SPSS and SAS procedures for estimating indirect effects in simple mediation models.” Behav. Res. Methods Instr. Comput. 36 (4): 717–731. https://doi.org/10.3758/BF03206553.
Puranam, P., M. Raveendran, and T. Knudsen. 2012. “Organization design: The epistemic interdependence perspective.” Acad. Manage. Rev. 37 (3): 419–440. https://doi.org/10.5465/amr.2010.0535.
Qian, S., D. Ma, and C. Miao. 2016. “Deciding to discover entrepreneurial opportunities: A multi-level investigation based on informational economics and resource dependence theory.” J. Develop. Entrepreneurship 21 (02): 1650009. https://doi.org/10.1142/S1084946716500096.
Qin, C., and B. Fan. 2016. “Factors that influence information sharing, collaboration, and coordination across administrative agencies at a Chinese university.” Inf. Syst. e-Bus. Manage. 14 (3): 637–664. https://doi.org/10.1007/s10257-015-0298-z.
Radujković, M., M. Vukomanović, and I. B. Dunović. 2010. “Application of key performance indicators in south-eastern European construction.” J. Civ. Eng. Manage. 16 (4): 521–530. https://doi.org/10.3846/jcem.2010.58.
Rapp, R. R. 2001. “Evolution, not revolution.” J. Manage. Eng. 17 (3): 166–175. https://doi.org/10.1061/(ASCE)0742-597X(2001)17:3(166).
Rezgui, Y., and G. Cooper. 2002. “A proposed open infrastructure for construction project document sharing.” J. Inf. Technol. Constr. 3 (2): 11–25.
Rijnhart, J. J. M., J. W. R. Twisk, M. J. M. Chinapaw, M. R. de Boer, and M. W. Heymans. 2017. “Comparison of methods for the analysis of relatively simple mediation models.” Contemp. Clin. Trials Commun. 7 (Sep): 130–135. https://doi.org/10.1016/j.conctc.2017.06.005.
Rogan, M., and H. R. Greve. 2014. “Resource dependence dynamics: Partner reactions to mergers.” Organ. Sci. 26 (1): 239–255. https://doi.org/10.1287/orsc.2014.0897.
Romm, N. R. A. 2013. “Employing questionnaires in terms of a constructivist epistemological stance: Reconsidering researchers’ involvement in the unfolding of social life.” Int. J. Qual. Methods 12 (1): 652–669. https://doi.org/10.1177/160940691301200136.
Rowe, C., J. G. Birnberg, and M. D. Shields. 2008. “Effects of organizational process change on responsibility accounting and managers’ revelations of private knowledge.” Accounting Organ. Soc. 33 (2–3): 164–198. https://doi.org/10.1016/j.aos.2006.12.002.
Ryu, S.-J., T. Tsukishima, and H. Onari. 2009. “A study on evaluation of demand information-sharing methods in supply chain.” Int. J. Prod. Econ. 120 (1): 162–175. https://doi.org/10.1016/j.ijpe.2008.07.030.
Saleem, M., P. W. H. Chung, S. Fatima, and W. Dai. 2014. “A cross organisation compatible workflows generation and execution framework.” Knowledge-Based Syst. 56 (Jan): 1–14. https://doi.org/10.1016/j.knosys.2013.08.022.
Sandhu, M. 2005. Managing project business development: An inter-organizational and intra-organizational perspective (summary section only). Helsinki, Finland: Svenska handelshögskolan.
Sarkar, M. B., P. S. Aulakh, and A. Madhok. 2009. “Process capabilities and value generation in alliance portfolios.” Organ. Sci. 20 (3): 583–600. https://doi.org/10.1287/orsc.1080.0390.
Schalock, R. L., T. Lee, M. Verdugo, K. Swart, C. Claes, J. van Loon, and C.-S. Lee. 2014. “An evidence-based approach to organization evaluation and change in human service organizations evaluation and program planning.” Eval. Program Plann. 45 (Aug): 110–118. https://doi.org/10.1016/j.evalprogplan.2014.03.012.
Schreiber, J. B., A. Nora, F. K. Stage, E. A. Barlow, and J. King. 2006. “Reporting structural equation modeling and confirmatory factor analysis results: A review.” J. Edu. Res. 99 (6): 323–338. https://doi.org/10.3200/JOER.99.6.323-338.
Sheriff, A., D. Bouchlaghem, A. El-Hamalawi, and S. Yeomans. 2011. “Information management in UK-based architecture and engineering organizations: Drivers, constraining factors, and barriers.” J. Manage. Eng. 28 (2): 170–180. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000085.
Shu, E., and A. Y. Lewin. 2017. “A resource dependence perspective on low-power actors shaping their regulatory environment: The case of Honda.” Organ. Stud. 38 (8): 1039–1058. https://doi.org/10.1177/0170840616670432.
Singh, A., and M. M. Shoura. 1999. “Assessment of organizational change for public construction organizations.” J. Manage. Eng. 15 (4): 59–70. https://doi.org/10.1061/(ASCE)0742-597X(1999)15:4(59).
Steinwachs, K. 1999. “Information and culture-the impact of national culture on information processes.” J. Inf. Sci. 25 (3): 193–204. https://doi.org/10.1177/016555159902500303.
Tai, Y.-M., and C.-F. Ho. 2010. “Effects of information sharing on customer relationship intention.” Ind. Manage. Data Syst. 110 (9): 1385–1401. https://doi.org/10.1108/02635571011087446.
Tillquist, J. 2002. “Rules of the game: Constructing norms of influence, subordination and constraint in IT planning.” Inf. Organ. 12 (1): 39–70. https://doi.org/10.1016/S1471-7727(01)00014-8.
Tsironis, L. C., D. S. Sfiris, and B. K. Papadopoulos. 2009. “Fuzzy performance evaluation of workflow stochastic petri nets by means of block reduction.” IEEE Trans. Syst. Man Cybern. 40 (2): 352–362. https://doi.org/10.1109/TSMCA.2009.2035303.z.
Van de Ven, A. H., and K. Sun. 2011. “Breakdowns in implementing models of organization change.” Acad. Manage. Perspect. 25 (3): 58–74. https://doi.org/10.5465/amp.25.3.zol58.
Viljamaa, E., and I. Peltomaa. 2014. “Intensified construction process control using information integration.” Autom. Constr. 39 (Apr): 126–133. https://doi.org/10.1016/j.autcon.2013.08.015.
Wakaisuka-Isingoma, J., J. Aduda, G. Wainaina, and C. I. Mwangi. 2016. “Corporate governance, firm characteristics, external environment and performance of financial institutions in Uganda: A review of literature.” Cogent Bus. Manage. 3 (1): 1261526. https://doi.org/10.1080/23311975.2016.1261526.
Walsh, E., Y. Shou, J. Han, and J. K. Brinker. 2018. “Development and validation of a Chinese language version of the ruminative thought styles questionnaire.” J. Psychoeducational Assess. 36 (6): 604–615. https://doi.org/10.1177/0734282917696937.
Wang, D., S. Fang, and H. Fu. 2019. “The effectiveness of evolutionary governance in mega construction projects: A moderated mediation model of relational contract and transaction cost.” J. Civ. Eng. Manage. 25 (4): 340–352. https://doi.org/10.3846/jcem.2019.9621.
Wang, R., D. Zhong, Y. Zhang, J. Yu, and M. Li. 2015. “A multidimensional information model for managing construction information.” J. Ind. Manage. Optim. 11 (4): 1285–1300. https://doi.org/10.3934/jimo.2015.11.1285.
Wang, Y., Q. Han, B. De Vries, and J. Zuo. 2016. “How the public reacts to social impacts in construction projects? A structural equation modeling study.” Int. J. Project Manage. 34 (8): 1433–1448. https://doi.org/10.1016/j.ijproman.2016.07.008.
Wong, P. S. P., C. Zwar, and E. Gharaie. 2017. “Examining the drivers and states of organizational change for greater use of prefabrication in construction projects.” J. Constr. Eng. Manage. 143 (7): 4017020. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001309.
Wood, R. E., J. S. Goodman, N. Beckmann, and A. Cook. 2008. “Mediation testing in management research: A review and proposals.” Organ. Res. Methods 11 (2): 270–295. https://doi.org/10.1177/1094428106297811.
Xia, N., R. Zhong, X. Wang, and R. Tiong. 2018. “Cross-domain negative effect of work-family conflict on project citizenship behavior: Study on Chinese project managers.” Int. J. Project Manage. 36 (3): 512–524. https://doi.org/10.1016/j.ijproman.2017.11.005.
Xiang, P., J. Zhou, X. Zhou, and K. Ye. 2012. “Construction project risk management based on the view of asymmetric information.” J. Constr. Eng. Manage. 138 (11): 1303–1311. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000548.
Yang, R. J., S. Jayasuriya, C. Gunarathna, M. Arashpour, X. Xue, and G. Zhang. 2018. “The evolution of stakeholder management practices in Australian mega construction projects.” Eng. Constr. Archit. Manage. 25 (6): 690–706. https://doi.org/10.1108/ECAM-07-2016-0168.
Yang, T.-M., and T. A. Maxwell. 2011. “Information-sharing in public organizations: A literature review of interpersonal, intra-organizational and inter-organizational success factors.” Government Inf. Q. 28 (2): 164–175. https://doi.org/10.1016/j.giq.2010.06.008.
Yap, J. B. H., H. Abdul-Rahman, and C. Wang. 2018. “Preventive mitigation of overruns with project communication management and continuous learning: PLS-SEM approach.” J. Constr. Eng. Manage. 144 (5): 4018025. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001456.
Yim, B., and B. Leem. 2013. “The effect of the supply chain social capital.” Ind. Manage. Data Syst. 113 (3): 324–349. https://doi.org/10.1108/02635571311312640.
Yuan, J., W. Li, X. Zheng, and M. J. Skibniewski. 2018. “Improving operation performance of public rental housing delivery by PPPs in China.” J. Manage. Eng. 34 (4): 4018015. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000615.
Yuan, J., C. Wang, M. J. Skibniewski, and Q. Li. 2011. “Developing key performance indicators for public-private partnership projects: Questionnaire survey and analysis.” J. Manage. Eng. 28 (3): 252–264. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000113.
Zeng, Q., S. X. Sun, H. Duan, C. Liu, and H. Wang. 2013. “Cross-organizational collaborative workflow mining from a multi-source log.” Decis. Support Syst. 54 (3): 1280–1301. https://doi.org/10.1016/j.dss.2012.12.001.
Zhang, L., A. J. A. Chettupuzha, H. Chen, X. Wu, and S. M. AbouRizk. 2017. “Fuzzy cognitive maps enabled root cause analysis in complex projects.” Appl. Soft Comput. 57 (Aug): 235–249. https://doi.org/10.1016/j.asoc.2017.04.020.
Zhao, N., and S. An. 2016. Collaborative management of complex major construction projects: Anylogic-based simulation modelling.” Discrete Dyn. Nat. Soc. 2016 (1): 1–18. https://doi.org/10.1155/2016/6195673.
Zhao, X., B.-G. Hwang, and S. Pheng Low. 2014. “Enterprise risk management implementation in construction firms: An organizational change perspective.” Manage. Decis. 52 (5): 814–833. https://doi.org/10.1108/MD-02-2014-0082.
Zhou, H., and W. C. Benton Jr. 2007. “Supply chain practice and information sharing.” J. Oper. Manage. 25 (6): 1348–1365. https://doi.org/10.1016/j.jom.2007.01.009.
Zou, P. X. W., Y. Chen, and T.-Y. Chan. 2009. “Understanding and improving your risk management capability: Assessment model for construction organizations.” J. Constr. Eng. Manage. 136 (8): 854–863. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000175.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 146Issue 7July 2020

History

Received: May 15, 2019
Accepted: Dec 17, 2019
Published online: Apr 23, 2020
Published in print: Jul 1, 2020
Discussion open until: Sep 23, 2020

Permissions

Request permissions for this article.

Authors

Affiliations

Ph.D. Candidate, Dept. of Construction and Real Estate, School of Civil Engineering, Southeast Univ., Nanjing 211189, PR China. Email: [email protected]
Jingfeng Yuan [email protected]
Professor, Dept. of Construction and Real Estate, School of Civil Engineering, Southeast Univ., Nanjing 211189, PR China (corresponding author). Email: [email protected]
Lecturer, Dept. of Construction and Real Estate, School of Civil Engineering, Southeast Univ., Nanjing 211189, PR China. Email: [email protected]
Ahmed Bouferguene [email protected]
Professor, Dept. of Civil and Environmental Engineering, Univ. of Alberta, Edmonton, AB, Canada T6G 1H9. Email: [email protected]
Mohamed Al-Hussein, S.M.ASCE [email protected]
Professor, Dept. of Civil and Environmental Engineering, Univ. of Alberta, Edmonton, AB, Canada T6G 2W2. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share