Abstract

Timely identification and removal of constraints is critical for improving workflow reliability. Construction project managers need to spend a significant amount of working time in various types of planning meetings to discuss, analyze, and remove constraints. However, the amount of uncertainty associated with each constraint, mutual information shared among constraints, and any information gained by addressing those constraints are not necessarily known with any great accuracy or precision. This research used a bridge construction project as a case study to collect empirical data on detailed weekly meeting minutes over 18 weeks and the planned and actual starting and finish times of 475 activities. An information-theoretic approach was used to develop a framework to measure the amount of uncertainty and information sharing among constraint discussions. A Chow–Liu tree was then developed to help project managers optimize the sequence of topics discussed so that meeting time may be spent more productively. Results from this particular study indicate that weekly planning meetings need to strategically address issues of equipment availability, design and working method clarification, and prerequisite work readiness since removing those constraints could improve workflow reliability by 5.6%, 4.9%, and 3.6%, respectively. The contribution to the body of knowledge of this research was the development of a framework to utilize an information theoretic–based approach to measure information exchange, uncertainty, and sharing in construction planning meetings. The method can be applied to other construction projects, and the findings can help project managers plan and run meetings more effectively.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Data generated or analyzed during the study are available from the corresponding author by request. Information about the Journal’s data-sharing policy can be found here: http://ascelibrary.org/doi/10.1061/(ASCE)CO.1943-7862.0001263.

References

Abbasian-Hosseini, S. A., M. Liu, and G. Howell. 2017. “Investigating the cost-benefit trade-off of additional planning using parade game simulation.” J. Manage. Eng. 34 (2): 04017066. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000580.
Abebe, A. J., and R. K. Price. 2004. “Information theory and neural networks for managing uncertainty in flood routing.” J. Comput. Civ. Eng. 18 (4): 373–380. https://doi.org/10.1061/(ASCE)0887-3801(2004)18:4(373).
Ballard, G. 2000. “The last planner system of production control.” Ph.D. dissertation, Dept. of Civil Engineering, Univ. of Birmingham.
Ballard, G., and G. Howell. 2003. “An update on last planner.” In Proc., 11th Int. Group for Lean Construction Conf. Blacksburg, VA: Virginia Tech.
Blokh, D., and I. Stambler. 2017. “The use of information theory for the evaluation of biomarkers of aging and physiological age.” Mech. Ageing Dev. 163 (Apr): 23–29. https://doi.org/10.1016/j.mad.2017.01.003.
Carlsson, B., P. E. Josephson, and B. Larson. 2001. “Communication in building projects; empirical results and future needs.” In Proc., CIB World Building Congress: Performance in Product and Practice. Wellington, New Zealand: BRANZ.
Chang, A. S., and F. Y. Shen. 2014. “Effectiveness of coordination methods in construction projects.” J. Manage. Eng. 30 (3): 04014008. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000222.
Chang, M. C., S. G. Shih, and G. Schmitt. 2017. “Information theory-based approach for constructability assessment in truss structural systems.” Autom. Constr. 82 (Oct): 84–102. https://doi.org/10.1016/j.autcon.2017.06.010.
Chow, C., and C. Liu. 1968. “Approximating discrete probability distributions with dependence trees.” IEEE Trans. Inf. Theory 14 (3): 462–467. https://doi.org/10.1109/TIT.1968.1054142.
Cover, T. M., and J. A. Thomas. 2006. Elements of information theory. 2nd ed. New York: Wiley.
Gazula, H., C. C. Chang, M. L. Lu, and S. M. Hsiang. 2015. “Using mutual information to capture major concerns of postural control in a tossing activity.” J. Biomech. 48 (6): 1105–1111. https://doi.org/10.1016/j.jbiomech.2015.01.022.
Gorse, C. A., and S. Emmitt. 2007. “Communication behaviour during management and design team meetings: A comparison of group interaction.” Constr. Manage. Econ. 25 (11): 1197–1213. https://doi.org/10.1080/01446190701567413.
Gorse, C. A., and S. Emmitt. 2009. “Informal interaction in construction progress meetings.” Constr. Manage. Econ. 27 (10): 983–993. https://doi.org/10.1080/01446190903179710.
Gorse, C. A., S. Emmitt, and M. Lowis. 1999. “Problem solving and appropriate communication medium.” In Proc., ARCOM, 15th Annual Conf., 511–517. Liverpool, UK: John Moores Univ.
Hamzeh, F., E. Zankoul, and F. El Sakka. 2016. “Removing constraints to make tasks ready in weekly work planning.” Procedia Eng. 164 (4): 68–74. https://doi.org/10.1016/j.proeng.2016.11.593.
Hamzeh, F., E. Zankoul, and C. Rouhana. 2015. “How can ‘tasks made ready’ during lookahead planning impact reliable workflow and project duration?” Constr. Manage. Econ. 33 (4): 243–258. https://doi.org/10.1080/01446193.2015.1047878.
Ibbs, W., and M. Liu. 2011. “An improved methodology for selecting similar working days for measured mile analysis.” Int. J. Project. Manage. 29 (6): 773–780. https://doi.org/10.1016/j.ijproman.2010.07.006.
Jalayer, F., J. L. Beck, and F. Zareian. 2012. “Analyzing the sufficiency of alternative scalar and vector intensity measures of ground shaking based on information theory.” J. Eng. Mech. 138 (3): 307–316. https://doi.org/10.1061/(ASCE)EM.1943-7889.0000327.
Jang, J. W., and Y. W. Kim. 2007. “Use of percent of constraints removal to measure the make-ready process.” In Proc., 15th Annual Conf. of the Int. Group for Lean Construction, 529–538. Manchester, UK: International Group for Lean Construction.
Jang, J. W., and Y. W. Kim. 2008. “The relationship between the make-ready process and project schedule performance.” In Proc., 16th Annual Conf. of the Int. Group for Lean Construction, 647–656. Manchester, UK: International Group for Lean Construction.
Jensen, F. V., and T. D. Nielsen. 2007. Bayesian networks and decision graphs. New York: Springer.
Kelleher, J. D., B. Mac Namee, and A. D’Arcy. 2015. Fundamentals of machine learning for predictive data analytics: Algorithms, worked examples, and case studies. Cambridge, MA: MIT Press.
Koskela, L. 1999. “Management of production in construction: A theoretical view.” In Proc., 7th Annual Conf. of the Int. Group for Lean Construction, 241–252. Berkeley, CA: Univ. of California.
Li, M., and P. Vitanyi. 1997. An introduction to Kolmogorov complexity and its applications. 2nd ed. New York: Springer.
Lindhard, S., and S. Wandahl. 2011. “Handling soundness and quality to improve reliability in LPS—A case study of an offshore construction site in Denmark.” In Proc., RICS Construction and Property Conf.: COBRA 2011, edited by L. Ruddock and P. Chynoweth, 1408–1418. Salford, UK: Royal Institution of Chartered Surveyors.
Lindhard, S., and S. Wandahl. 2012. “Improving the making ready process—Exploring the preconditions to work tasks in construction.” In Proc., 20th Annual Conf. of the Int. Group for Lean Construction, 451–460. San Diego: International Group for Lean Construction.
Linoff, G. S., and M. J. Berry. 2011. Data mining techniques: For marketing, sales and customer relationship management. 3rd ed. Indianapolis: Wiley.
Liu, M., G. Ballard, and W. Ibbs. 2011. “Workflow variation and labor productivity: Case study.” J. Manage. Eng. 27 (4): 236–242. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000056.
MacQueen, J. B. 1967. “Some methods for classification and analysis of multivariate observations.” In Vol. 1 of Proc., 5th Berkeley Symp. on Mathematical Statistics and Probability, 281–297. Berkeley, CA: Univ. of California Press.
Mincks, W. R., and H. Johnston. 2010. Construction jobsite management. New York: Delmar Cengage Learning.
Schaffernicht, E., V. Stephan, and M. Grob. 2007. “An efficient search strategy for feature selection using Chow–Liu trees.” In Vol. 4669 of Proc., Artificial Neural Networks, 190–199. Berlin: Springer.
Schwartzman, H. 1989. The meeting: Gatherings in organizations and communities. New York: Springer.
Shannon, C. E. 1948. “A mathematical theory of communication.” Bell Syst. Tech. J. 27 (3): 379–423. https://doi.org/10.1002/j.1538-7305.1948.tb01338.x.
Steimer, A., F. Zubler, and K. Schindler. 2015. “Chow–Liu trees are sufficient predictive models for reproducing key features of functional networks of periictal EEG time-series.” NeuroImage 118 (Sep): 520–537. https://doi.org/10.1016/j.neuroimage.2015.05.089.
Stone, J. V. 2015. Information theory: A tutorial introduction. New York: Sebtel Press.
Van Gassel, F. J. M., T. Láscaris-Comneno, and G. J. Maas. 2014. “The conditions for successful automated collaboration in construction.” Autom. Constr. 39 (Apr): 85–92. https://doi.org/10.1016/j.autcon.2013.12.001.
Wang, J., W. Shou, X. Wang, and P. Wu. 2016. “Developing and evaluating a framework of total constraint management for improving workflow in liquefied natural gas construction.” Constr. Manage. Econ. 34 (12): 859–874. https://doi.org/10.1080/01446193.2016.1227460.
Xiao-Mei, G., and L. Xiao-Jun. 2011. “Application of entropy measurement in risk assessment of the engineering project of construction-agent system.” Syst. Eng. Procedia 1: 244–249. https://doi.org/10.1016/j.sepro.2011.08.038.
Xu, L., T. Y. Lee, and H. W. Shen. 2010. “An information-theoretic framework for flow visualization.” IEEE Trans. Visual Comput. Graphics 16 (6): 1216–1224. https://doi.org/10.1109/TVCG.2010.131.
Xu, P., et al. 2017. “A two-phase copula entropy-based multiobjective optimization approach to hydrometeorological gauge network design.” J. Hydrol. 555 (Dec): 228–241. https://doi.org/10.1016/j.jhydrol.2017.09.046.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 146Issue 4April 2020

History

Received: Feb 12, 2019
Accepted: Sep 9, 2019
Published online: Jan 21, 2020
Published in print: Apr 1, 2020
Discussion open until: Jun 21, 2020

Permissions

Request permissions for this article.

Authors

Affiliations

Ashtad Javanmardi [email protected]
Ph.D. Candidate, Dept. of Civil, Construction, and Environmental Engineering, North Carolina State Univ., Raleigh, NC 27695. Email: [email protected]
S. Alireza Abbasian-Hosseini [email protected]
Research Associate, Dept. of Civil, Construction, and Environmental Engineering, North Carolina State Univ., Raleigh, NC 27695. Email: [email protected]
Associate Professor, Dept. of Civil, Construction, and Environmental Engineering, North Carolina State Univ., Raleigh, NC 27695 (corresponding author). ORCID: https://orcid.org/0000-0002-3070-7109. Email: [email protected]
Simon M. Hsiang [email protected]
Professor and Department Chair, Dept. of Systems Engineering and Engineering Management, Univ. of North Carolina at Charlotte, Charlotte, NC 28223. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share