In construction, the most relevant systems used for project management (PM) and project production management (PPM) in the planning and control phases are critical path method (CPM), last planner system (LPS), and location-based techniques (LB). Studies have addressed these systems, mostly in isolated fashions. This study aims to compare and contrast their use in terms of PM and PPM and clarify industry benefits in order to eliminate potential misunderstandings about their use. A survey was administered to construction professionals in Brazil, China, Finland, and the United States. No single system addresses all needs of PM and PPM. CPM is the dominant system when considering the following characteristics: primary industry types, type of organization, size of organization, professional position within the organization, and area of work. Contributions to knowledge include that CPM is a contract requirement with perceived benefits associated with critical path analysis; LB and LPS have perceived benefits regarding continuous flow and use of resources, treatment of interferences, and improving production control. All systems were found to have a similar level of benefits for management of contracts, delay and change, and evaluation of the root causes of delays. The industry can benefit from aligning project scheduling methods with project needs.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Data generated or analyzed during the study are available from the corresponding author by request. Information about the Journal’s data-sharing policy can be found here: http://ascelibrary.org/doi/10.1061/(ASCE)CO.1943-7862.0001263.

Acknowledgments

The authors would like Dominique Hawkins for her assistance with the data when preparing this manuscript.

References

Al-Reshaid, K., N. Kartam, N. Tewari, and H. Al-Bader. 2005. “A project control process in pre-construction phases: Focus on effective methodology.” Eng. Constr. Archit. Manage. 12 (4): 351–372. https://doi.org/10.1108/09699980510608811.
Alsehaimi, A. O., P. T. Fazenda, and L. Koslela. 2014. “Improving construction management practice with the last planner system: A case study.” Eng. Constr. Archit. Manage. 21 (1): 51–64. https://doi.org/10.1108/ECAM-03-2012-0032.
Antill, J. M., and R. W. Woodhead. 1990. Critical path methods in construction practice. New York: Wiley.
Arditi, D., and T. Pattanakitchamroon. 2006. “Selecting a delay analysis method in resolving construction claims.” Int. J. Project Manage. 24 (2): 145–155. https://doi.org/10.1016/j.ijproman.2005.08.005.
Arditi, D., O. B. Tokdemir, and K. Suh. 2002. “Challenges in line-of-balance scheduling.” J. Constr. Eng. Manage. 128 (6): 545–556. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:6(545).
Ballard, H. G. 1997. “Look ahead planning, the missing link to production control.” In Proc., 5th Annual Conf. of the Int. Group for Lean Construction, 13–26. International Group for Lean Construction.
Ballard, H. G. 2000. “The last planner system of production control.” Ph.D. thesis, School of Civil Engineering, Univ. of Birmingham.
Ballard, H. G., and A. Howell. 1998. “Shielding production: Essential step in production control.” J. Constr. Eng. Manage. 124 (1): 11–17. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:1(11).
Benjaoran, V., W. Tabyang, and N. Sooksil. 2015. “Precedence relationship options for the resource levelling problem using a genetic algorithm.” Constr. Manage. Econ. 33 (9): 711–723. https://doi.org/10.1080/01446193.2015.1100317.
Bragadin, M. A., and K. Kähkönen. 2016. “Schedule health assessment of construction projects.” Constr. Manage. Econ. 34 (12): 875–897. https://doi.org/10.1080/01446193.2016.1205751.
Brown, J. W. 1985. “Evaluation of projects using critical path analysis and earned value in combination.” Project Manage. J. 16 (3): 59–63.
Burns, S. A., L. Liu, and C. W. Feng. 1996. “The LP/IP hybrid method for construction time-cost trade-off analysis.” Constr. Manage. Econ. 14 (3): 265–276. https://doi.org/10.1080/014461996373511.
Edum-Fotwe, F. T., and R. McCaffer. 2000. “Developing project management competency: Perspectives from the construction industry.” Int. J. Project Manage. 18 (2): 111–124. https://doi.org/10.1016/S0263-7863(98)90075-8.
Fernandez-Solis, J. L., V. Porwal, S. Lavy, A. Shafaat, Z. K. Rybkowski, K. Son, and N. Lagoo. 2013. “Survey of motivations, benefits, and implementation challenges of last planner system users.” J. Constr. Eng. Manage. 139 (4): 354–360. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000606.
Fiallo, C. M., and P. H. V. Revelo. 2002. “Applying the last planner system to a construction project: Case study in Quito, Ecuador.” In Proc., 10th Annual Conf. of the Int. Group for Lean Construction. International Group for Lean Construction.
Forza, C. 2002. “Survey research in operations management: A process-based perspective.” Int. J. Oper. Prod. Manage. 22 (2): 152–194. https://doi.org/10.1108/01443570210414310.
Frandson, A., K. Berghede, and I. D. Tommelein. 2013. “Takt time planning for construction of exterior cladding.” In Proc., 21st Annual Conf. of the Int. Group for Lean Construction. International Group for Lean Construction.
Galloway, P. D. 2006. “Survey of the construction industry relative to the use of CPM scheduling for construction projects.” J. Constr. Eng. Manage. 132 (7): 697–711. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:7(697).
Hamzeh, F., G. Ballard, and I. D. Tommelein. 2012. “Rethinking lookahead planning to optimize construction workflow.” Lean Constr. J. 1 (1): 15–34.
Hamzeh, F., E. Kankoul, and C. Rouhana. 2015. “How can ‘tasks made ready’ during lookahead planning impact reliable workflow and project duration?” Constr. Manage. Econ. 33 (4): 243–258. https://doi.org/10.1080/01446193.2015.1047878.
Harris, R. B., and P. G. Ioannou. 1998. “Scheduling projects with repeating activities.” J. Constr. Eng. Manage. 124 (4): 269–278. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:4(269).
Hegazy, T. 2005. “Computerized system for efficient scheduling of highway construction.” Transp. Res. Rec. 1907 (1): 8–14. https://doi.org/10.1177/0361198105190700102.
Hegazy, T., and W. Menesi. 2010. “Critical path segments scheduling technique.” J. Constr. Eng. Manage. 136 (10): 1078–1085. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000212.
Howell, G., and G. Ballard. 1994. “Lean production theory: Moving beyond ‘Can-do’.” In Proc., 2nd Annual Conference of the International Group for Lean Construction (IGLC-2), edited by L. F. Alarcón. Rotterdam, Netherlands: A.A. Balkema.
Huber, B., and P. Reiser. 2003. “The marriage of CPM and lean construction.” In Proc., 11th Annual Conf. of the Int. Group for Lean Construction. International Group for Lean Construction.
Johnston, D. W. 1981. “Linear scheduling method for highway construction.” J. Constr. Div. 107 (2): 247–261.
Kelley, J. E., and M. Walker. 1959. “Critical path planning and scheduling.” In Proc., Eastern Joint IRE-AIEE-ACM Computer Conf, 160–173. New York: Association for Computing Machinery.
Kemmer, S. L., L. F. M. Heineck, and T. C. L. Alves. 2008. “Using the line-of-balance for production system design.” In Proc., 16th Annual Conf. of the Int. Group for Lean Construction. International Group for Lean Construction.
Kenley, R., and O. Seppänen. 2010. Location-based management for construction: Planning, scheduling and control. Abingdon: Spon Press.
Khanh, H. D., and S. Y. Kim. 2016. “A survey on production planning system in construction projects based on last planner system.” KSCE J. Civ. Eng. 20 (1): 1–11. https://doi.org/10.1007/s12205-015-1412-y.
Kim, W., D. Ryu, and Y. Jung. 2014. “Application of linear scheduling method (LSM) for nuclear power plant (NPP) construction.” Nucl. Eng. Des. 270 (Apr): 65–75. https://doi.org/10.1016/j.nucengdes.2013.12.053.
Kim, Y. W., C. Park, and G. Ballard. 2007. “A case study on rebar supply chain management by GS E&C.” In Proc., 15th Annual Conf. of the Int. Group for Lean Construction. International Group for Lean Construction.
Koskela, L., and G. Howell. 2002. “The underlying theory of project management is obsolete.” In Proc., PMI Research Conf., 293–302. Newtown Square, PA: Project Management Institute.
Koskela, L., G. Howell, E. Pikas, and B. Dave. 2014. “If CPM is so bad, why have we been using it so long?” In Proc., 22nd Annual Conf. of the Int. Group for Lean Construction. International Group for Lean Construction.
Koskela, L., R. Startton, and A. Koskenvesa. 2010. “Last planner and critical chain in construction management: Comparative analysis.” In Proc., 18th Annual Conf. of the Int. Group for Lean Construction. International Group for Lean Construction.
Laufer, A., and R. L. Tucker. 1987. “Is construction project planning really doing its job? A critical examination of focus, role and process.” Constr. Manage. Econ. 5 (3): 243–266. https://doi.org/10.1080/01446198700000023.
Levin, P. 1998. Construction contract claims, changes and dispute resolution. Reston, VA: ASCE.
Lucko, G., T. C. L. Alves, and V. L. Angelim. 2014. “Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling.” Constr. Manage. Econ. 32 (6): 575–594. https://doi.org/10.1080/01446193.2013.845305.
Lumsden, P. 1968. The line of balance method. London: Pergamon Press.
Mattila, K. G., and A. Park. 2003. “Comparison of linear scheduling model and repetitive scheduling method.” J. Constr. Eng. Manage. 129 (1): 56–64. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:1(56).
Meredith, J. R., and S. J. Mantel. 2012. Project management: A managerial approach. Danvers, MA: Wiley.
Olano, R. M., L. F. Alarcón, and C. Razuri. 2009. “Understanding the relationship between planning reliability and schedule performance: A case study.” In Proc., 17th Annual Conf. of the Int. Group for Lean Construction. International Group for Lean Construction.
Olawale, Y., and M. Sun. 2015. “Construction project control in the UK: Current practice, existing problems and recommendations for future improvement.” Int. J. Project Manage. 33 (3): 623–637. https://doi.org/10.1016/j.ijproman.2014.10.003.
Olivieri, H., O. Seppänen, and A. D. Granja. 2018. “Improving workflow and resource usage in construction schedules through location-based management system (LBMS).” Constr. Manage. Econ. 36 (2): 109–124. https://doi.org/10.1080/01446193.2017.1410561.
Orouji, H., O. B. Haddad, E. Fallah-Meddipour, and M. A. Marino. 2014. “Extraction of decision alternatives in project management: Application of hybrid PSO-SFLA.” J. Manage. Eng. 30 (1): 50–59. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000186.
Patton, M. Q. 1990. Qualitative evaluation and research methods. Thousand Oaks, CA: Sage Publications.
PMI (Project Management Institute). 2013. A guide to the project management body of knowledge: PMBOK guide. Newtown Square, PA: PMI.
Rossi, P. H., J. D. Wright, and A. B. Anderson. 2013. Handbook of survey research. San Diego: Academic Press.
Russell, A. D., and W. C. M. Wong. 1993. “New generation of planning structures.” J. Constr. Eng. Manage. 119 (2): 196–214. https://doi.org/10.1061/(ASCE)0733-9364(1993)119:2(196).
Schmenner, R. W. 1993. Production/operations management, 825. Englewood Cliffs, NJ: Prentice Hall.
Sears, S. K., G. A. Sears, R. H. Clough, J. L. Rounds, and R. O. Segner. 2015. Construction project management. Hoboken, NJ: Wiley.
Shi, Q., and T. Blomquist. 2012. “A new approach for project scheduling using fuzzy dependency structure matrix.” Int. J. Project Manage. 30 (4): 503–510. https://doi.org/10.1016/j.ijproman.2011.11.003.
Tavakoli, A., and R. Riachi. 1990. “CPM use in ENR top 400 contractors.” J. Manage. Eng. 6 (3): 282–295. https://doi.org/10.1061/(ASCE)9742-597X(1990)6:3(282).
Wickwire, J. M., and R. F. Smith. 1974. “The use of critical path method techniques in contract claims.” Public Contract Law J. 7 (1): 1–45.
Willis, C., and D. Friedman. 1998. Building the empire state building. New York: Norton.
Yang, J. B., and C. K. Kao. 2012. “Critical path effect based delay analysis method for construction projects.” Int. J. Project Manage. 30 (3): 385–397. https://doi.org/10.1016/j.ijproman.2011.06.003.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 145Issue 12December 2019

History

Received: Mar 23, 2018
Accepted: Aug 9, 2019
Published online: Sep 28, 2019
Published in print: Dec 1, 2019
Discussion open until: Feb 28, 2020

Permissions

Request permissions for this article.

Authors

Affiliations

Hylton Olivieri [email protected]
Formerly, Postdoctoral Fellow, School of Engineering, Dept. of Civil Engineering, Aalto Univ., Espoo 00076, Finland. Email: [email protected]
Professor of Practice, School of Engineering, Dept. of Civil Engineering, Aalto Univ., Espoo 00076, Finland. ORCID: https://orcid.org/0000-0002-2008-5924. Email: [email protected]
Thais da C. L. Alves, A.M.ASCE [email protected]
Associate Professor, Dept. of Civil, Construction and Environmental Engineering, San Diego State Univ., San Diego, CA 92182 (corresponding author). Email: [email protected]
Associate Professor, Dept. of eBusiness and Technology Management, Towson Univ., Towson, MD 21252. ORCID: https://orcid.org/0000-0003-2851-134X. Email: [email protected]
Vincent Schiavone [email protected]
Graduate Assistant, Towson Univ., Towson, MD 21252. Email: [email protected]
Associate Professor, Dept. of Civil, Construction and Environmental Engineering, North Carolina State Univ., Raleigh, NC 27695. ORCID: https://orcid.org/0000-0002-3070-7109. Email: [email protected]
Associate Professor, Dept. of Architecture and Building, Univ. of Campinas, Campinas, São Paulo 13083-852, Brazil. ORCID: https://orcid.org/0000-0002-2964-5609. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share