Development and Application of a Production-Rate Resource for Contract Time Determination
Publication: Journal of Construction Engineering and Management
Volume 144, Issue 12
Abstract
Work item production rates are essential for contract time determination (CTD) procedures as they are used to estimate the duration of activities needed to complete a highway construction project. For this reason, varied sources and estimation systems provide production-rate data for a variety of work items. Yet these data sources are disjointed and do not provide for any side-by-side comparison of data. This research focuses on the development of an integrated Production Rate Resource, a single, easy-to-use reference of production-rate data gathered from publicly available sources. The resource was developed by gathering production-rate information from multiple sources and organizing the found data into a well-assembled Excel workbook. A proposed process for conducting CTD using the resource is included. The gathered information was tested by estimating the contract time of highway projects using the recommended process. Findings from the application led to significant improvements to the resource. The final version of the Production Rate Resource provides integrated production-rate data for 59 highway construction work items and a recommended process for conducting contract time estimation.
Get full access to this article
View all available purchase options and get full access to this article.
Data Availability Statement
Data generated or analyzed during the study are available from the corresponding author by request. Information about the Journal’s data-sharing policy can be found here: http://ascelibrary.org/doi/10.1061/(ASCE)CO.1943-7862.0001263.
Acknowledgments
The authors would like to thank the Texas Department of Transportation and the Center for Transportation Research. This study would not have been possible without their support.
References
Atreya, S. K. 2007. “Development of an improved system for contract time determination.” Accessed April 23, 2017. http://digital.library.okstate.edu/etd/umi-okstate-2292.pdf.
Federal Highway Administration Legislations and Regulations. 2002. “FHWA guide for construction contract time determination procedures (TA 5080.15).” Accessed April 22, 2017. http://www.fhwa.dot.gov/construction/contracts/t508015.cfm.
Florida DOT (Florida Department of Transportation). 2010. “Guidelines for establishing construction contract duration.” Accessed April 22, 2017. http://www.fdot.gov/construction/SchedulingEng/GuidellinesForEstablishingContractDuration.pdf.
Hale, D., et al. 2015. RSMeans heavy construction cost data 2016. 30th Annual ed. Rockland, MA: Gordian Group.
Hancher, D. E., W. McFarland, and R. T. Alabay. 1992. Construction contract time determination. San Antonio: Texas Transportation Institute, Texas A&M Univ. System.
Hancher, D. E., and R. F. Werkmeister. 2000. Kentucky contract time determination system. Lexington, KY: Kentucky Transportation Center, Univ. of Kentucky Research Foundation.
Herbsman, Z. J., and R. Ellis. 1995. Determination of contract time for highway construction projects. Washington, DC: Transportation Research Board, National Research Council.
Idaho Transportation Department. 2011. “Contract time determination in project development.” Accessed April 5, 2017. https://apps.itd.idaho.gov/apps/manuals/ContractTime/files/ContractTimePrintable.pdf.
Illinois Department of Transportation. 2010. “Contract processing.” Accessed April 5, 2017. https://idot.illinois.gov/Assets/uploads/files/Doing-Business/Manuals-Split/Design-And-Environment/BDE-Manual/Chapter%2066%20Contract%20Processing.pdf.
Iowa Department of Transportation. 2016. “Letting guidelines.” Accessed April 5, 2017. http://www.iowadot.gov/contracts/LettingGuidelines.pdf.
Jeong, H. S., G. D. Oberlender, S. K. Atreya, and V. Akella. 2008. Development of an improved system for contract time determination. Stillwater, OK: Oklahoma Dept. of Transportation, Oklahoma State Univ.
O’Connor, J. T., W. K. Chong, Y. Huh, and Y. Kuo. 2004. Development of improved information for estimating construction time. Austin, TX: Univ. of Texas at Austin, Center for Transportation Research, Texas Dept. of Transportation.
Oklahoma Department of Transportation Transportation Commission. 2009. “2009 standard specifications book.” Accessed April 22, 2017. http://www.odot.org/c_manuals/specbook/oe_ss_2009.pdf.
Wisconsin Department of Transportation. 2015. “Chapter 19 Section 10.” Accessed April 5, 2017. http://wisconsindot.gov/rdwy/fdm/fd-19-10.pdf#fd19-10-1.
Information & Authors
Information
Published In
Copyright
©2018 American Society of Civil Engineers.
History
Received: Jul 28, 2017
Accepted: Jun 12, 2018
Published online: Sep 25, 2018
Published in print: Dec 1, 2018
Discussion open until: Feb 25, 2019
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.