Abstract
A long investment cycle and complex environmental changes bring lots of uncertainty to urban rail-transit (URT) project investment, and lead to many investment risks. However, investors’ aggressive flexible management strategies may effectively avoid the risks and create greater investment benefits. In order to scientifically evaluate the potential benefits brought from flexible management, this paper systematically builds an analysis framework for investment benefits evaluation based on real options theory. Previous studies have still been confined to the single option benefits measurement and the evaluation methods assume that expected investment cost and income were constant. To fill the gap, this study takes account of the interaction effects of several real options and uses fuzzy theory to relax some parameter hypotheses, then establishes a multiple-fold compound real-option benefits evaluation model based on trapezoidal fuzzy numbers. Another contribution of this paper is that it provides a clear modeling approach for estimating the parameters of investment benefits volatility and discount rate by using historical open data in the financial market. A case study of the Changsha Metro Line 2 in China is discussed, and the empirical analysis shows that option benefits account for a large proportion of the entire investment returns. Moreover, the compound option benefits are about five times of the single option, so the implied option benefits, especially the compound option benefits, should not be ignored in the measurement of the URT project, and investors should be encouraged to actively implement flexible management strategies. Finally, this paper makes a sensitivity analysis of compound option benefits, and provides a basis for effectively reducing the government’s subsidies and achieving profitability of URT project investment.
Get full access to this article
View all available purchase options and get full access to this article.
Data Availability Statement
Data generated or analyzed during the study are available from the corresponding author by request. Information about the Journal’s data-sharing policy can be found here: http://ascelibrary.org/doi/10.1061/(ASCE)CO.1943-7862.0001263.
References
Baranov, A., and E. Muzyko. 2015. “Valuation of compound real options for investments in innovative projects in pharmaceutical industry.” Procedia Econ. Finance 27: 116–125. https://doi.org/10.1016/S2212-5671(15)00980-6.
Biancardi, M., and G. Villani. 2017. “A fuzzy approach for R&D compound option valuation.” Fuzzy Sets Syst. 310 (1): 108–121. https://doi.org/10.1016/j.fss.2016.10.013.
Carlsson, C., and R. Fullér. 2003. “A fuzzy approach to real option valuation.” Fuzzy Sets Syst. 139 (2): 297–312. https://doi.org/10.1016/S0165-0114(02)00591-2.
Cassimon, D., P. J. Engelen, L. Thomassen, and M. Van Wouwe. 2004. “The valuation of a NDA using a 6-fold compound option.” Res. Policy 33 (1): 41–51. https://doi.org/10.1016/S0048-7333(03)00089-1.
Cassimon, D., P. J. Engelen, and V. Yordanov. 2011. “Compound real option valuation with phase-specific volatility: A multi-phase mobile payments case study.” Technovation 31 (5): 240–255. https://doi.org/10.1016/j.technovation.2010.12.004.
Changsha Municipal Bureau of Statistics. 2017. Changsha investigation team of China National Bureau of Statistics, 2017. Changsha statistical yearbook. Beijing: China Statistics Press.
Da, Z., R. Guo, and R. Jagannathan. 2012. “CAPM for estimating the cost of equity capital: Interpreting the empirical evidence.” J. Financial Econ. 103 (1): 204–220. https://doi.org/10.1016/j.jfineco.2011.08.011.
Doan, P., and K. Menyah. 2013. “Impact of irreversibility and uncertainty on the timing of infrastructure projects.” J. Constr. Eng. Manage. 139 (3): 331–338. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000615.
Espinoza, R. 2014. “Separating project risk from the time value of money: A step toward integration of risk management and valuation of infrastructure investments.” Int. J. Project Manage. 32 (6): 1056–1072. https://doi.org/10.1016/j.ijproman.2013.12.006.
Gao, Y., and T. Driouchi. 2013. “Incorporating Knightian uncertainty into real options analysis: Using multiple-priors in the case of rail transit investment.” Transp. Res. Part B 55: 23–40. https://doi.org/10.1016/j.trb.2013.04.004.
Geske, R. 1979. “The valuation of compound options.” J. Financial Econ. 7 (1): 63–81.
Huang, Y., and C. Pi. 2009. “Valuation of multi-stage BOT projects involving dedicated asset investments: A sequential compound option approach.” Constr. Manage. Econ. 27 (7): 653–666. https://doi.org/10.1080/01446190903002789.
Huang, Y., and C. Pi. 2014. “Real-option valuation of build-operate-transfer infrastructure projects under performance bonding.” J. Constr. Eng. Manage. 140 (5): 04013068. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000821.
Hull, J. 2012. Options, futures, and other derivatives. 8th ed. Upper Saddle River, NJ: Prentice Hall.
Kim, K., H. Park, and H. Kim. 2017. “Real options analysis for renewable energy investment decisions in developing countries.” Renewable Sustainable Energy Rev. 75: 918–926. https://doi.org/10.1016/j.rser.2016.11.073.
Konstandatos, O. 2015. “Third order compound option valuation of flexible commodity based mining enterprises.” Arch. Bus. Res. 3 (1): 19–35. https://doi.org/10.14738/abr.31.801.
Law, S., A. Mackay, and J. Nolan. 2004. “Rail infrastructure management policy applying a real-options methodology.” Public Works Manage. Policy 9 (2): 145–153. https://doi.org/10.1177/1087724X04268697.
Li, Z., Q. Guo, W. H. Lam, and S. C. Wong. 2015. “Transit technology investment and selection under urban population volatility: A real option perspective.” Transp. Res. Part B 78: 318–340. https://doi.org/10.1016/j.trb.2015.05.006.
Liang, W., and S. Wang. 2012. “Real option for urban rapid rail transit PPP project.” [In Chinese.] J. Eng. Manage. 26 (2): 23–27.
Loncar, D., I. Milovanovic, B. Rakic, and T. Radjenovic. 2017. “Compound real options valuation of renewable energy projects: The case of a wind farm in Serbia.” Renewable Sustainable Energy Rev. 75: 354–367. https://doi.org/10.1016/j.rser.2016.11.001.
Lund, M., and J. Jensen. 2016. “A real options approach to biotechnology investment policy—The case of developing a campylobacter vaccine to poultry.” Preventive Vet. Med. 128 (1): 58–69. https://doi.org/10.1016/j.prevetmed.2016.04.006.
Lv, J., W. Liu, Q. Zou, and L. Gan. 2015. “Decision-making model on concession period for SBOT project under uncertainty.” [In Chinese.] Forecasting 34 (2): 60–65.
Martins, J., R. Marques, and C. Cruz. 2014. “Maximizing the value for money of PPP arrangements through flexibility: An application to airports.” J. Air Transp. Manage. 39: 72–80. https://doi.org/10.1016/j.jairtraman.2014.04.003.
Mirzadeh, I., and B. Birgisson. 2016. “Evaluation of highway projects under government support mechanisms based on an option-pricing framework.” J. Constr. Eng. Manage. 142 (4): 04015094. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001079.
Myers, S. 1977. “Determinants of corporate borrowing.” J. Financial Econ. 5 (2): 147–175. https://doi.org/10.1016/0304-405X(77)90015-0.
Schachter, J., and P. Mancarella. 2016. “A critical review of real options thinking for valuing investment flexibility in smart grids and low carbon energy systems.” Renewable Sustainable Energy Rev. 56: 261–271. https://doi.org/10.1016/j.rser.2015.11.071.
Tang, W., F. Zhang, and C. Ma. 2011. “The investment value of the urban rail transit project based on fuzzy real option.” [In Chinese.] Syst. Eng. 29 (12): 110–115.
Uçal, İ., and C. Kahraman. 2009. “Fuzzy real options valuation for oil investments.” Technol. Econ. Dev. Economy 15 (4): 646–669. https://doi.org/10.3846/1392-8619.2009.15.646-669.
Wang, J., and W. Hwang. 2007. “A fuzzy set approach for R&D portfolio selection using a real options valuation model.” Omega— Int. J. Manage. Sci. 35 (3): 247–257. https://doi.org/10.1016/j.omega.2005.06.002.
Wang, J., C. Wang, and C. Wu. 2015. “A real options framework for R&D planning in technology-based firms.” J. Eng. Tech. Manage. 35: 93–114. https://doi.org/10.1016/j.jengtecman.2014.12.001.
Xiong, W., and X. Zhang. 2016. “The real option value of renegotiation in public-private partnerships.” J. Constr. Eng. Manage. 142 (8): 04016021. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001130.
Yeo, K., and F. Qiu. 2003. “The value of management flexibility—A real option approach to investment evaluation.” Int. J. Project Manage. 21 (4): 243–250. https://doi.org/10.1016/S0263-7863(02)00025-X.
You, C., C. K. M. Lee, S. L. Chen, and R. J. Jiao. 2012. “A real option theoretic fuzzy evaluation model for enterprise resource planning investment.” J. Eng. Tech. Manage. 29 (1): 47–61. https://doi.org/10.1016/j.jengtecman.2011.09.005.
Zhu, X., and W. Qiu. 2011. “Analysis of investment decision in railway underground PPP project based on real option.” [In Chinese.] Syst. Eng. 29 (3): 117–120.
Information & Authors
Information
Published In
Copyright
©2018 American Society of Civil Engineers.
History
Received: Oct 18, 2017
Accepted: May 15, 2018
Published online: Oct 27, 2018
Published in print: Jan 1, 2019
Discussion open until: Mar 27, 2019
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.