Technical Papers
Apr 28, 2018

Automating the Use of Learning Curve Models in Construction Task Duration Estimates

Publication: Journal of Construction Engineering and Management
Volume 144, Issue 7

Abstract

Standard scheduling tools for construction projects with repetitive tasks assume that labor productivity remains constant throughout the project lifetime. None of these tools accommodate the dynamics of learning throughout the project. This paper introduces a tool that uses nonlinear optimization to integrate learning curve concepts into task duration estimates for construction project scheduling. The tool, featuring a graphical user interface, mines past data to select the most appropriate learning model from a suite of existing models. Testing the tool on data obtained from five published case studies with varying sizes and locations suggests that the tool offers accurate estimates for task completion times, even when the size or quality of the input data is minimal. Directives for use of this tool and an estimate of potential savings in practice are also provided through an example based on real-world data. These savings amounted to 28% of the overall labor costs within the real-world project. The contribution of this paper is a tool to estimate construction task durations in such a way that learning is incorporated. The tool uses nonlinear optimization to select and calibrate the best learning model making the tool of value to practitioners working across a variety of linear and nonlinear repetitive projects in a range of geographical regions.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Data generated or analyzed during the study are available from the corresponding author by request. Information about the Journal’s data-sharing policy can be found here: http://ascelibrary.org/doi/10.1061/%28ASCE%29CO.1943-7862.0001263.

Acknowledgments

This work was funded by the American University of Beirut University Research Board through Grant 103187. The authors gratefully acknowledge the work of an anonymous reviewer whose recommendations made this manuscript significantly stronger.

References

Al Sarraj, Z. M. 1990. “Formal development of line-of-balance technique.” J. Constr. Eng. Manage. 116 (4): 689–704. https://doi.org/10.1061/(ASCE)0733-9364(1990)116:4(689).
Ammar, M. A. 2013. “LOB and CPM integrated method for scheduling repetitive projects.” J. Constr. Eng. Manage. 139 (1): 44–50. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000569.
Anzanello, M. J., and F. S. Fogliatto. 2011. “Learning curve models and applications: Literature review and research directions.” Int. J. Ind. Ergon. 41 (5): 573–583. https://doi.org/10.1016/j.ergon.2011.05.001.
Couto, J., and J. Teixeira. 2005. “Using linear model for learning curve effect on highrise floor construction.” Constr. Manage. Econ. 23 (4): 355–364. https://doi.org/10.1080/01446190500040505.
Damci, A., D. Arditi, and G. Polat. 2013. “Multiresource leveling in line-of-balance scheduling.” J. Constr. Eng. Manage. 139 (9): 1108–1116. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000716.
Eshtehardian, E., R. Abbasnia, and A. Afshar. 2008. “Optimization of uncertain construction time-cost trade-off problem.” In Vol. 1 of Proc., First Int. Conf. on Construction in Developing Countries (ICCIDC–I), Advancing and Integrating Construction Education, Research & Practice, 192–200. Karachi, Pakistan.
Everett, J. G., and S. Farghal. 1994. “Learning curve predictors for construction field operations.” J. Constr. Eng. Manage. 120 (3): 603–616. https://doi.org/10.1061/(ASCE)0733-9364(1994)120:3(603).
Everett, J. G., and S. H. Farghal. 1997. “Data representation for predicting performance with learning curves.” J. Constr. Eng. Manage. 123 (1): 46–52. https://doi.org/10.1061/(ASCE)0733-9364(1997)123:1(46).
Faghihi, V., A. Nejat, K. F. Reinschmidt, and J. H. Kang. 2015. “Automation in construction scheduling: A review of the literature.” Int. J. Adv. Manuf. Technol. 81 (9): 1845–1856. https://doi.org/10.1007/s00170-015-7339-0.
Fini, A. A. F., T. H. Rashidi, A. Akbarnezhad, and S. T. Waller. 2016. “Incorporating multiskilling and learning in the optimization of crew composition.” J. Constr. Eng. Manage. 142 (5): 04015106. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001085.
Georgy, M. E. 2008. “Evolutionary resource scheduler for linear projects.” Autom. Constr. 17 (5): 573–583. https://doi.org/10.1016/j.autcon.2007.10.005.
Gładysz, B. 2016. “Fuzzy-probabilistic PERT.” Ann. Oper. Res. 258 (2): 1–16.
Harris, R., and P. Ioannou. 1998. “Scheduling projects with repeating activities.” J. Constr. Eng. Manage. 124 (4): 269–278. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:4(269).
Hijazi, A. M., S. M. AbouRizk, and D. W. Halpin. 1992. “Modeling and simulating learning development in construction.” J. Constr. Eng. Manage. 118 (4): 685–700. https://doi.org/10.1061/(ASCE)0733-9364(1992)118:4(685).
Hinze, J. W. 2011. Construction planning and scheduling. Upper Saddle River, NJ: Pearson Prentice Hall.
Jaber, M. Y. 2016. Learning curves: Theory, models, and applications. Boca Raton, FL: Taylor & Francis Group.
Jarkas, A., and M. Horner. 2011. “Revisiting the applicability of learning curve theory to formwork labour productivity.” Constr. Manage. Econ. 29 (5): 483–493. https://doi.org/10.1080/01446193.2011.562911.
Jarkas, A. M. 2010. “Critical investigation into the applicability of the learning curve theory to rebar fixing labor productivity.” J. Constr. Eng. Manage. 136 (12): 1279–1288. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000236.
Kazaz, A., E. Manisali, and S. Ulubeyli. 2008. “Effect of basic motivational factors on construction workforce productivity in Turkey.” J. Civ. Eng. Manage. 14 (2): 95–106. https://doi.org/10.3846/1392-3730.2008.14.4.
Khamooshi, H., and D. F. Cioffi. 2013. “Uncertainty in task duration and cost estimates: Fusion of probabilistic forecasts and deterministic scheduling.” J. Constr. Eng. Manage. 139 (5): 488–497. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000616.
Lattouf, M. G., F. J. Srour, and I. M. Srour. 2014. “Construction workforce management strategies to reduce absenteeism: A survey study.” In Proc., Construction Research Congress 2014: Construction in a Global Network, 827–836. Reston, VA: ASCE.
Lee, B., H.-S. Lee, M. Park, and H. Kim. 2015. “Influence factors of learning-curve effect in high-rise building constructions.” J. Constr. Eng. Manage. 141 (8): 04015019. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000997.
Liu, S.-S., and C.-J. Wang. 2012. “Optimizing linear project scheduling with multi-skilled crews.” Autom. Constr. 24: 16–23. https://doi.org/10.1016/j.autcon.2011.12.009.
Long, L. D., and A. Ohsato. 2009. “A genetic algorithm-based method for scheduling repetitive construction projects.” Autom. Constr. 18 (4): 499–511. https://doi.org/10.1016/j.autcon.2008.11.005.
Maravas, A., and J.-P. Pantouvakis. 2011. “Fuzzy repetitive scheduling method for projects with repeating activities.” J. Constr. Eng. Manage. 137 (7): 561–564. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000319.
Ng, S. T., and Y. Zhang. 2008. “Optimizing construction time and cost using ant colony optimization approach.” J. Constr. Eng. Manage. 134 (9): 721–728. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:9(721).
Panas, A., and J. P. Pantouvakis. 2014. “Simulation-based and statistical analysis of the learning effect in floating caisson construction operations.” J. Constr. Eng. Manage. 140 (1): 04013033. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000782.
Pawan, P., and P. Lorterapong. 2016. “A fuzzy-based integrated framework for assessing time contingency in construction projects.” J. Constr. Eng. Manage. 142 (3): 04015083. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001073.
Selinger, S. 1980. “Construction planning for linear projects.” Am. Soc. Civ. Eng. J. Constr. Div. 106 (2): 195–205.
Senouci, A. B., and K. K. Naji. 2006. “A computerized system for scheduling and cost optimization of nonserial linear projects.” Surv. Built Environ. 17 (2): 49–62.
Srour, F. J., D. Kiomjian, and I. M. Srour. 2015. “Learning curves in construction: A critical review and new model.” J. Constr. Eng. Manage. 140 (1): 06015004.
Thomas, H. R., C. T. Mathews, and J. G. Ward. 1986. “Learning curve models of construction productivity.” J. Constr. Eng. Manage. 112 (2): 245–258. https://doi.org/10.1061/(ASCE)0733-9364(1986)112:2(245).
UN Economic Commission for Europe. 1965. “Effect of repetition on building operations and processes on site: Report of an enquiry.” Accessed April 16, 2018. http://books.google.com.lb/books?id=5cV8QgAACAAJ.
Xiong, Y., and Y. Kuang. 2008. “Applying an ant colony optimization algorithm-based multiobjective approach for time-cost trade-off.” J. Constr. Eng. Manage. 134 (2): 153–156. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:2(153).
Zhou, J., P. E. D. Love, X. Wang, K. L. Teo, and Z. Irani. 2013. “A review of methods and algorithms for optimizing construction scheduling.” J. Oper. Res. Soc. 64 (8): 1091–1105. https://doi.org/10.1057/jors.2012.174.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 144Issue 7July 2018

History

Received: May 29, 2017
Accepted: Jan 23, 2018
Published online: Apr 28, 2018
Published in print: Jul 1, 2018
Discussion open until: Sep 28, 2018

Permissions

Request permissions for this article.

Authors

Affiliations

Assistant Professor, Dept. of Information Technology and Operations Management, Adnan Kassar School of Business, Lebanese American Univ., P.O. Box 13-5053, Chouran, Beirut 1102 2801, Lebanon (corresponding author). ORCID: https://orcid.org/0000-0001-7623-723X. Email: [email protected]
Daoud Kiomjian [email protected]
Ph.D. Candidate, Dept. of Civil and Environmental Engineering, American Univ. of Beirut, P.O. Box 1107-2020, Beirut, Lebanon. Email: [email protected]
Issam M. Srour, A.M.ASCE [email protected]
Associate Professor, Dept. of Civil and Environmental Engineering, American Univ. of Beirut, P.O. Box 1107-2020, Beirut, Lebanon. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share