Despite many advantages of precast concrete members, the conventional precast members lack in the treatment of construction waste, require concrete pour forms at joints, and their structural discontinuity leads to low redundancy in the load paths. This study aims to provide novel solutions to these problems by developing interlocking mechanical joints with fully restrained moments for the connections of both steel-concrete composite precast and reinforced concrete precast columns. In the proposed connections, a pair of steel plates was provided; each plate was installed at the bottom of the upper columns and on top of the lower columns, which were then connected monolithically via vertical column rebars passing through the metal plates, providing flexural capacity similar to that of conventional monolithic column connections. The column rebars were spliced by couplers that were manufactured to be fastened by the weight of the upper column, which was heavy enough to push the vertical rebars into the couplers in the area prepared at the lower part of the upper column, providing a monolithic joint for the connected precast columns. Throughout the erection test, it was found that conventional monolithic cast-in-place joints for assembling precast concrete frames can be replaced by the interlocking mechanical joints, offering rapid erection compared with traditional practices. The columns with proposed joints were also proved to demonstrate sufficient structural capacity. Stresses and strains were found within allowable limits on the basis of finite-element analysis considering concrete plasticity during the assembly of heavy precast frames. The erection test showed sufficient verticality ensuring rebars to be connected via couplers when the upper columns were released down to the lower columns. This novel frame did not require concrete cast at the joint, eliminating the use of concrete pour forms adopted in conventional construction methods over the last years. Effortless erection with structural efficiency was demonstrated by using the proposed assembly method, with a significant reduction in the time required to assemble precast frames, similar to that of steel frames. The novel frames proposed in this study are expected to replace the conventional concrete frames including cast-in-place frames and precast frames with traditional joints. These novel frames contribute to the concrete industry by providing rapid and dependable construction of both precast and cast-in place frames.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Data generated or analyzed during the study are available from the corresponding author by request. Information about the Journal’s data-sharing policy can be found here: http://ascelibrary.org/doi/10.1061/(ASCE)CO.1943-7862.0001263.

Acknowledgments

This work was supported by the Basic Science Research Program through the National Research Foundation of Korea (NRF), which is funded by the Ministry of Education (NRF-2016R1D1A1A02937558).

References

ABAQUS [Computer software]. Dassault Systèmes SIMULIA, Providence, RI.
Demiralp, G., Guven, G., and Ergen, E. (2012). “Analyzing the benefits of RFID technology for cost sharing in construction supply chains: A case study on prefabricated precast components.” Autom. Constr., 24, 120–129.
Elliott, K. S. (2016). Precast concrete structures, CRC Press, Oxford, U.K.
Englekirk, R. (1995). “Development and testing of a ductile connector for assembling precast concrete beams and columns.” PCI J., 40(2), 36–51.
Guan, D., Guo, Z., Xiao, Q., and Zheng, Y. (2016). “Experimental study of a new beam-to-column connection for precast concrete frames under reversal cyclic loading.” Adv. Struct. Eng., 19(3), 529–545.
Henin, E., and Morcous, G. (2015). “Non-proprietary bar splice sleeve for precast concrete construction.” Eng. Struct., 83, 154–162.
Hu, J.-Y., Hong, W. K., and Park, S. C. (2016). “Experimental investigation of precast concrete based dry mechanical column–column joints for precast concrete frames.” Struct. Des. Tall Special Build., 26(5), 1–15.
Johnson, C. D. (1969). “Erection of precast concrete.” PCI J., 14(2), 54–62.
Nzabonimpa, J. D., Hong, W. K., and Kim, J. (2017a). “Mechanical connections of the precast concrete columns with detachable metal plates.” Struct. Des. Tall Special Build., 26(17), 1–14.
Nzabonimpa, J. D., Hong, W. K., and Kim, J. (2017b). “Nonlinear finite element model for the novel mechanical beam-column joints of precast concrete-based frames.” Comput. Struct., 189, 31–48.
Nzabonimpa, J. D., Hong, W. K., and Park, S. C. (2017c). “Experimental investigation of dry mechanical beam-column joints for precast concrete based frames.” Struct. Des. Tall Special Build., 26(1), 1–19.
Pall, A. S., Marsh, C., and Fazio, P. (1980). “Friction joints for seismic control of large panel structures.” PCI J., 25(6), 38–61.
Pampanin, S. (2005). “Emerging solutions for high seismic performance of precast/prestressed concrete buildings.” J. Adv. Concr. Technol., 3(2), 207–223.
Parastesh, H., Hajirasouliha, I., and Ramezani, R. (2014). “A new ductile moment-resisting connection for precast concrete frames in seismic regions: An experimental investigation.” Eng. Struct., 70, 144–157.
Priestley, M. N., and MacRae, G. (1996). “Seismic tests of precast beam-to-column joint subassemblages with unbonded tendons.” PCI J., 41(1), 64–81.
Proverbs, D. G., Holt, G. D., and Olomolaiye, P. O. (1998). “Factors impacting construction project duration: A comparison between France, Germany and the UK.” Build. Environ., 34(2), 197–204.
Shim, C. S., Chung, C. H., and Kim, H. H. (2008). “Experimental evaluation of seismic performance of precast segmental bridge piers with a circular solid section.” Eng. Struct., 30(12), 3782–3792.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 144Issue 6June 2018

History

Received: Jun 28, 2017
Accepted: Nov 15, 2017
Published online: Mar 28, 2018
Published in print: Jun 1, 2018
Discussion open until: Aug 28, 2018

Permissions

Request permissions for this article.

Authors

Affiliations

J. D. Nzabonimpa
Postdoctoral Fellow, Dept. of Architectural Engineering, Kyung Hee Univ., Yongin 446-701, Korea.
Won-Kee Hong [email protected]
Professor, Dept. of Architectural Engineering, Kyung Hee Univ., Yongin 446-701, Korea (corresponding author). E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share