Technical Papers
Feb 23, 2016

Hybrid Simulation Framework for Immediate Facility Restoration Planning after a Catastrophic Disaster

Publication: Journal of Construction Engineering and Management
Volume 142, Issue 8

Abstract

Since the effects of external conditions, such as limited resource supplies and poor working environments in damaged regions, are critical to facility restoration projects after a catastrophic disaster, a lack of understanding regarding restoration conditions may lead to unexpected delays and additional project costs. The fact that various elements of postdisaster restoration conditions interact with each other and vary with a facility’s surrounding damage and recovery situations over time makes many stakeholders’ comprehension even more challenging. To support immediate and appropriate facility restoration planning under changing project conditions, this study developed a hybrid system dynamics (SD)–discrete event simulation (DES) framework. In this hybrid restoration simulation, SD allows for a comprehensive understanding of the dynamic features of various restoration conditions, while DES enables an in-depth examination of facility restoration operations according to external condition changes. By allowing two simulations to seamlessly interact together, this study provides key insights into postdisaster restoration, including how complex and critical restoration conditions change over time depending on facility types and subregions, and to what extent these conditions adversely impact a project’s performance and uncertainty throughout lengthy project durations, especially when restoration work scope and processes vary with damage patterns. A test tool for analyzing the effectiveness of managerial policies is also provided by showing experimental results. For instance, a project initiation, postponed to avoid unfavorable restoration conditions, can be delayed to reduce the project’s uncertainty by alleviating possible increases in wasted time and cost of running an unproductive site. Therefore, the major contribution of this research to the body of knowledge in construction engineering resides in the capacity for the developed hybrid model to make facility restoration planning and execution deal with project uncertainties caused by chaotic and disrupting external conditions. As such, unexpected delays and additional costs common for postdisaster recovery can be alleviated.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

This research was supported by a grant (12TRPI-C064106-01) from the Technology Advancement Research Program funded by the Ministry of Land, Infrastructure, and Transport of the Korean government.

References

AnyLogic 7 [Computer software]. AnyLogic, Chicago.
AbouRizk, S., Halpin, D., Mohamed, Y., and Hermann, U. (2011). “Research in modeling and simulation for improving construction engineering operations.” J. Constr. Eng. Manage., 843–852.
Ahmad, S., and Simonovic, S. (2000). “System dynamics modeling of reservoir operations for flood management.” J. Comput. Civ. Eng., 190–198.
Alvanchi, A., Lee, S., and AbouRizk, S. (2011). “Modeling framework and architecture of hybrid system dynamics and discrete event simulation for construction.” Comput.-Aided Civ. Infrastruct. Eng., 26(2), 77–91.
Alvanchi, A., Lee, S., and AbouRizk, S. M. (2012). “Dynamics of working hours in construction.” J. Constr. Eng. Manage., 66–77.
Back, W. E., Boles, W. W., and Fry, G. T. (2000). “Defining triangular probability distributions from historical cost data.” J. Constr. Eng. Manage., 29–37.
Djanatliev, A., Kolominsky-Rabas, P., Hofmann, B. M., and German, R. (2012). “Hybrid simulation with loosely coupled system dynamics and agent-based models for prospective health technology assessments.” Proc., 2012 Winter Simulation Conf., IEEE, Piscataway, NJ, 770–781.
Eidinger, J., Davis, C., Tang, A., and Kempner, L. (2012). “M 9.0 Tohoku earthquake March 11 2011 performance of water and power systems.” G & E Engineering Systems Inc, Oakland, CA.
e-Stat (Portal Site of Official Statistics of Japan). (2013). “Statistics of Japan.” 〈http://www.e-stat.go.jp/SG1/estat/eStatTopPortalE.do〉 (Aug. 12, 2013).
Ford, D. N., and Sterman, J. D. (1998). “Dynamic modeling of product development process.” Syst. Dyn. Rev., 14(1), 31–68.
Harrison, J. R., Lin, Z., Carroll, G. R., and Carley, K. M. (2007). “Simulation modeling in organizational and management research.” Acad. Manage. Rev., 32(4), 1229–1245.
Herroelen, W., and Leus, R. (2005). “Project scheduling under uncertainty: Survey and research potentials.” Eur. J. Oper. Res., 165(2), 289–306.
Holguin-Veras, J., and Jaller, M. (2012). “Immediate resource requirements after Hurricane Katrina.” Nat. Hazards Rev., 117–131.
Hwang, S., Park, M., Lee, H., Lee, S., and Kim, H. (2015). “Postdisaster interdependent built environment recovery efforts and the effects of governmental plans: A case analysis using system dynamics.” J. Constr. Eng. Manage., 04014081.
Jaiswal, K., and Wald, D. J. (2013). “Estimating economic losses from earthquakes using an empirical approach.” Earthquake Spectra, 29(1), 309–324.
Kanno, T., Narita, A., Morikawa, N., Fujiwara, H., and Fukushima, Y. (2006). “A new attenuation relation for strong ground motion in Japan based on recorded data.” Bull. Seismol. Soc. Am., 96(3), 879–897.
Law, A., and Kelton, W. D. (2006). Simulation modeling and analysis, 3rd Ed., McGraw-Hill, New York.
Lee, S., Han, S., and Peña-Mora, F. (2009). “Integrating construction operation and context in large-scale construction using hybrid computer simulation.” J. Comput. Civ. Eng., 75–83.
Lee, S., Pena-Mora, F., and Park, M. (2005). “Quality and change management model for large scale concurrent design and construction projects.” J. Constr. Eng. Manage., 890–902.
Martinez, J. C. (2010). “Methodology for conducting discrete-event simulation studies in construction engineering and management.” J. Constr. Eng. Manage., 3–16.
Mosterman, P. J. (1999). “An overview of hybrid simulation phenomena and their support by simulation packages.” Hybrid systems: Computation and control. Lecture notes in computer science, Springer, Berlin, 165–177.
NIRA (National Institute for Research Advancement of Japan). (2013). “Status of recovery and current problems in three disaster-hit prefectures.” 〈http://www.nira.or.jp/pdf/1301english_summary.pdf〉 (Jul. 8, 2014).
Olshansky, R. B., Hopkins, L. D., and Johnson, L. A. (2012). “Disaster and recovery: Processes compressed in time.” Nat. Hazards Rev., 173–178.
Orabi, W., Senouci, A. B., El-Rayes, K., and Al-Derham, H. (2010). “Optimizing resource utilization during the recovery of civil infrastructure systems.” J. Manage. Eng., 237–246.
Pachakis, D., and Kiremidjian, A. S. (2004). “The use of simulation in disaster response planning and risk management of ports and harbors.” Proc., 6th U.S. Conf. and Workshop on Lifeline Earthquake Engineering, ASCE, Reston, VA, 425–434.
Park, M. (2005). “Model-based dynamic resource management for construction projects.” Autom. Constr., 14(5), 585–598.
Peña-Mora, F., Han, S., Lee, S., and Park, M. (2008). “Strategic-operational construction management: Hybrid system dynamics and discrete event approach.” J. Constr. Eng. Manage., 701–710.
Peña-Mora, F., and Li, M. (2001). “Dynamic planning and control methodology for design/build fast-track construction projects.” J. Constr. Eng. Manage., 1–17.
Pich, M. T., Loch, C. H., and Meyer, A. D. (2002). “On uncertainty, ambiguity, and complexity in project management.” Manage. Sci., 48(8), 1008–1023.
Rabelo, L., Helal, M., Jones, A. and Min, H. (2005). “Enterprise simulation: A hybrid system approach.” Int. J. Comput. Integr. Manuf., 18(6), 498–508.
RA (Reconstruction Agency of Japanese Government). (2013). “Current status and path toward reconstruction.” 〈http://www.reconstruction.go.jp/english/130328_CurrentStatus_PathToward_FINAL.pdf〉 (May 20, 2013).
Riley, D. R., and Sanvido, V. E. (1995). “Patterns of construction-space use in multistory buildings.” J. Constr. Eng. Manage., 464–473.
Shoji, G., and Toyota, A. (2009). “Modeling of restoration process associated with critical infrastructure and its interdependency to a seismic disaster.” TCLEE 2009, ASCE, Reston, VA, 647–658.
Sterman, J. (2000). Business dynamics: System thinking and modeling for a complex world, Irwin/McGraw-Hill, Boston.
Swan, R. C. (2000). “Debris management planning for the 21st century.” Nat. Hazards Rev., 222–225.
Taranath, B. S. (2005). Wind and earthquake resistant buildings: Structural analysis and design, drift limitation, CRC Press, Boca Raton, FL.
Taylor, T. R. B., and Ford, D. N. (2008). “Managing tipping point dynamics in complex construction projects.” J. Constr. Eng. Manage., 421–431.
Venkateswaran, J., Son, Y., and Jones, A. (2004). “Hierarchical production planning using a hybrid system dynamic-discrete event simulation architecture.” Proc., 2004 Winter Simulation Conf., IEEE, Piscataway, NJ.
Wald, D. J., Quitoriano, V., Heaton, T. H., and Kanamori, H. (1999). “Relationships between peak ground acceleration, peak ground velocity, and modified Mercalli intensity in California.” Earthquake Spectra, 15(3), 557–564.
Williams, T. (2002). Modelling complex projects, Wiley, New York.
Zeigler, B. P., Cho, H. J., Kim, J. G., Sarjoughian, H. S., and Lee, J. S. (2002). “Quantization-based filtering in distributed discrete event simulation.” J. Parallel Distrib. Comput., 62(11), 1629–1647.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 142Issue 8August 2016

History

Received: Aug 22, 2014
Accepted: Dec 15, 2015
Published online: Feb 23, 2016
Discussion open until: Jul 23, 2016
Published in print: Aug 1, 2016

Permissions

Request permissions for this article.

Authors

Affiliations

Sungjoo Hwang, A.M.ASCE [email protected]
Postdoctoral Research Fellow, Dept. of Civil and Environmental Engineering, Univ. of Michigan, 2350 Hayward St., Ann Arbor, MI 48109. E-mail: [email protected]
Moonseo Park, A.M.ASCE [email protected]
Professor, Dept. of Architecture and Architectural Engineering, Seoul National Univ., 1 Gwanak-ro, Gwanak-gu, Seoul, Korea (corresponding author). E-mail: [email protected]
Hyun-Soo Lee, A.M.ASCE [email protected]
Professor, Dept. of Architecture and Architectural Engineering, Seoul National Univ., 1 Gwanak-ro, Gwanak-gu, Seoul, Korea. E-mail: [email protected]
SangHyun Lee, M.ASCE [email protected]
Associate Professor, Dept. of Civil and Environmental Engineering, Univ. of Michigan, 2350 Hayward St., Ann Arbor, MI 48109. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share