Contractual Governance: Effects of Risk Allocation on Contractors’ Cooperative Behavior in Construction Projects

Publication: Journal of Construction Engineering and Management
Volume 142, Issue 6

Abstract

When designing contracts in practice, project owners often allocate excessive risks to contractors. Although previous studies have suggested that such improper risk allocation may harm the relationship between the owner and the contractor and thus lower project performance, few have explicitly investigated the effects of risk allocation on the contractor’s cooperative behavior. This paper fills this gap by empirically exploring whether, how, and when risk allocation influences the contractor’s cooperative behavior. To do this, data were collected from 284 Chinese project professionals and hierarchical regression analysis was performed. The results show that pro-owner contractual terms with regard to risk allocation negatively affect the contractor’s cooperative behavior, and the contractor’s fairness perception partially mediates such an effect. Moreover, risk premium weakens the effect of environmental risks allocation on the contractor’s fairness perception, and term specificity strengthens the effect of the contractor’s fairness perception on the contractor’s cooperative behavior. Theoretically, these insights extend risk allocation studies by identifying the underlying mechanism behind the relationship of risk allocation and interfirm cooperation and thus contribute to sound contractual governance. Practically, this study’s findings can help project owners design better contracts, particularly by bearing in mind that risk premium should not always be used to restore the contractor’s fairness perception to elicit the contractor’s cooperative behavior because it does little to help when owner risks are allocated to contractors.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

We thank the National Natural Science Foudation of China (NSFC) for its financial support for this research (Grant Nos. 71172149 and 71231006). Thanks also go to all the respondents and interviewees who participated in our survey.

References

Adams, J. S. (1965). “Inequity in social exchange.” Advances in experimental social psychology, Academic, New York, 267–299.
AIA (American Institute of Architects). (2007). “Standard form of agreement between owner and contractor.” New York.
Aibinu, A. A., Ling, F. Y. Y., and Ofori, G. (2011). “Structural equation modelling of organizational justice and cooperative behaviour in the construction project claims process: contractors’ perspectives.” Constr. Manage. Econ., 29(5), 463–481.
Aiken, L. S., and West, S. G. (1991). Multiple regression: Testing and interpreting interactions, Sage, Newbury Park, CA.
Andi. (2006). “The importance and allocation of risks in Indonesian construction projects.” Constr. Manage. Econ., 24(1), 69–80.
Andrews, F. M., and Robinson, J. P. (1991). “Measures of subjective well-being.” Measures of personality and social psychological attitudes: Measures of social psychological attitudes, Vol. 1, J. P. Robinson, P. R. Shaver, and L. S. Wrightsman, eds., Academic Press, San Diego, 61–114.
Anvuur, A. M. (2008). “Cooperation in construction projects: Concept, antecedents and strategies.” Univ. of Hong Kong, Hong Kong.
Ariño, A., and Ring, P. S. (2010). “The role of fairness in alliance formation.” Strategic Manage. J., 31(10), 1054–1087.
Barnes, M. (1983). “How to allocate risks in construction contracts.” Int. J. Project Manage., 1(1), 24–28.
Baron, R. M., and Kenny, D. A. (1986). “The moderator-mediator variable distinction in social psychological research: Conceptual, strategic, and statistical considerations.” J. Personal. Social Psychol., 51(6), 1173–1182.
Barthélemy, J., and Quélin, B. V. (2006). “Complexity of outsourcing contracts and ex post transaction costs: An empirical investigation.” J. Manage. Stud., 43(8), 1775–1797.
Bryde, D. J., and Volm, J. M. (2009). “Perceptions of owners in German construction projects: Congruence with project risk theory.” Constr. Manage. Econ., 27(11), 1059–1071.
Bunni, N. G. (2005). The FIDIC forms of contract, Wiley, Oxford, U.K.
Carson, S. J., Madhok, A., and Wu, T. (2006). “Uncertainty, opportunism, and governance: The effects of volatility and ambiguity on formal and relational contracting.” Acad. Manage. J., 49(5), 1058–1077.
Chang, C.-Y. (2014). “Principal-agent model of risk allocation in construction contracts and its critique.” J. Constr. Eng. Manage., 04013032.
Chen, C., and Hubbard, M. (2012). “Power relations and risk allocation in the governance of public private partnerships: A case study from China.” Policy Soc., 31(1), 39–49.
CII (Construction Industry Institute). (1988). “Contract risk allocation and cost effectiveness.” Austin, TX.
CII (Construction Industry Institute). (2007). “Contracting to appropriately allocate risk.” Austin, TX.
Cohen, J., Cohen, P., West, S. G., and Aiken, L. S. (2002). Applied multiple regression/correlation analysis for the behavioral sciences, Routledge Academic, New York.
Cohen-Charash, Y., and Spector, P. E. (2001). “The role of justice in organizations: A meta-analysis.” Organ. Behav. Hum. Decis. Process., 86(2), 278–321.
Colquitt, J. A. (2001). “On the dimensionality of organizational justice: A construct validation of a measure.” J. Appl. Psychol., 86(3), 386–400.
Coote, L. V., Forrest, E. J., and Tam, T. W. (2003). “An investigation into commitment in non-Western industrial marketing relationships.” Ind. Market. Manage., 32(7), 595–604.
Das, T. K., and Teng, B. S. (1998). “Between trust and control: Developing confidence in partner cooperation in alliances.” Acad. Manage. Rev., 23(3), 491–512.
Dyer, J. H., and Singh, H. (1998). “The relational view: Cooperative strategy and sources of interorganizational competitive advantage.” Acad. Manage. Rev., 23(4), 660–679.
El-Sayegh, S. M. (2008). “Risk assessment and allocation in the UAE construction industry.” Int. J. Project Manage., 26(4), 431–438.
Eriksson, P. E. (2010). “Partnering: What is it, when should it be used, and how should it be implemented?” Constr. Manage. Econ., 28(9), 905–917.
Faems, D., Janssens, M., Madhok, A., and Van Looy, B. (2008). “Toward an integrative perspective on alliance governance: Connecting contract design, trust dynamics, and contract application.” Acad. Manage. J., 51(6), 1053–1078.
Fang, D., Li, M., Fong, P. S. W., and Shen, L. (2004). “Risks in Chinese construction market—Contractors’ perspective.” J. Constr. Eng. Manage., 853–861.
FIDIC (International Federation of Consulting Engineers). (1999a). “Conditions of contract for EPC/Turnkey projects.” Geneva.
FIDIC (International Federation of Consulting Engineers). (1999b). “Conditions of contract for construction.” Geneva.
Frame, J. D. (2003). Managing risk in organizations: A guide for managers, Wiley, San Francisco.
Franke, N., Keinz, P., and Klausberger, K. (2013). “’Does this sound like a fair deal?’: Antecedents and consequences of fairness expectations in the individual’s decision to participate in firm innovation.” Organ. Sci., 24(5), 1495–1516.
Gilliland, S. W. (1993). “The perceived fairness of selection systems: An organizational justice perspective.” Acad. Manage. Rev., 18(4), 694–734.
Gransberg, D. D., and Ellicott, M. A. (1997). “Best-value contracting criteria.” Cost Eng. Morgantown, 39(6), 31–34.
Griffith, D. A., Harvey, M. G., and Lusch, R. F. (2006). “Social exchange in supply chain relationships: The resulting benefits of procedural and distributive justice.” J. Oper. Manage., 24(2), 85–98.
Groton, J., and Smith, R. J. (2010). “Realistic risk allocation: Allocating each risk to the party best able to handle it.” Conflict Prevention and Resolution (CPR)-International Institute for Conflict Prevention & Resolution Research Rep., New York.
Haitao Cui, T., Raju, J. S., and Zhang, Z. J. (2007). “Fairness and channel coordination.” Manage. Sci., 53(8), 1303–1314.
Hanna, A. S., Thomas, G., and Swanson, J. R. (2013). “Construction risk identification and allocation: Cooperative approach.” J. Constr. Eng. Manage., 1098–1107.
Hartman, F., and Snelgrove, P. (1996). “Risk allocation in lump-sum contracts-concept of latent dispute.” J. Constr. Eng. Manage., 291–296.
Heide, J. B., and Miner, A. S. (1992). “The shadow of the future: Effects of anticipated interaction and frequency of contact on buyer-seller cooperation.” Acad. Manage. J., 35(2), 265–291.
Husted, B. W., and Folger, R. (2004). “Fairness and transaction costs: The contribution of organizational justice theory to an integrative model of economic organization.” Organ. Sci., 15(6), 719–729.
ICE (Institution of Civil Engineers). (2005). “NEC3 engineering and construction contract.” London.
Jin, X. H. (2010). “Determinants of efficient risk allocation in privately financed public infrastructure projects in Australia.” J. Constr. Eng. Manage., 138–150.
Jin, X. H., and Doloi, H. (2008). “Interpreting risk allocation mechanism in public-private partnership projects: An empirical study in a transaction cost economics perspective.” Constr. Manage. Econ., 26(7), 707–721.
Jin, X. H., and Zhang, G. (2011). “Modelling optimal risk allocation in PPP projects using artificial neural networks.” Int. J. Project Manage., 29(5), 591–603.
Kadefors, A. (2005). “Fairness in interorganizational project relations: Norms and strategies.” Constr. Manage. Econ., 23(8), 871–878.
Kangari, R. (1995). “Risk management perceptions and trends of US construction.” J. Constr. Eng. Manage., 422–429.
Keey, R. (1998). “Australia/New Zealand risk management standard.” Owning the future: Integrated risk management in practice, D. Elms, ed., Centre for Advanced Engineering, New Zealand, 91–98.
Khazaeni, G., Khanzadi, M., and Afshar, A. (2012). “Fuzzy adaptive decision making model for selection balanced risk allocation.” Int. J. Project Manage., 30(4), 511–522.
Kim, K. K., Park, S. H., Ryoo, S. Y., and Park, S. K. (2010). “Inter-organizational cooperation in buyer-supplier relationships: Both perspectives.” J. Bus. Res., 63(8), 863–869.
Knights, D., Noble, F., Vurdubakis, T., and Willmott, H. (2001). “Chasing shadows: Control, virtuality and the production of trust.” Organ. Stud., 22(2), 311–336.
Kumar, N., Scheer, L. K., and Steenkamp, J. B. E. (1995). “The effects of perceived interdependence on dealer attitudes.” J. Market. Res., 32(3), 348–356.
Laan, A., Voordijk, H., and Dewulf, G. (2011). “Reducing opportunistic behaviour through a project alliance.” Int. J. Manage. Project Bus., 4(4), 660–679.
Lam, K. C., Wang, D., Lee, P. T., and Tsang, Y. T. (2007). “Modelling risk allocation decision in construction contracts.” Int. J. Proj. Manage., 25(5), 485–493.
Lehtiranta, L. (2014). “Risk perceptions and approaches in multi-organizations: A research review 2000–2012.” Int. J. Project Manage., 32(4), 640–653.
Li, H., Bingham, J. B., and Umphress, E. E. (2007). “Fairness from the top: perceived procedural justice and collaborative problem solving in new product development.” Organ. Sci., 18(2), 200–216.
Liu, S., and Wang, L. (2014). “Understanding the impact of risks on performance in internal and outsourced information technology projects: The role of strategic importance.” Int. J. Project Manage., 32(8), 1494–1510.
Liu, Y., Huang, Y., Luo, Y., and Zhao, Y. (2012). “How does justice matter in achieving buyer-supplier relationship performance?” J. Oper. Manage., 30(5), 355–367.
Loosemore, M. (1999). “Responsibility, power and construction conflict.” Constr. Manage. Econ., 17(6), 699–709.
Loosemore, M., and McCarthy, C. (2008). “Perceptions of contractual risk allocation in construction supply chains.” J. Prof. Issues Eng. Educ. Pract., 95–105.
Loosemore, M., Raftery, J., and Reilly, C. (2006). Risk management in projects, Taylor & Francis, London.
Lu, S., and Hao, G. (2013). “The influence of owner power in fostering contractor cooperation: Evidence from China.” Int. J. Project Manage., 31(4), 522–531.
Lui, S. S., Wong, Y. Y., and Liu, W. (2009). “Asset specificity roles in interfirm cooperation: Reducing opportunistic behavior or increasing cooperative behavior?” J. Bus. Res., 62(11), 1214–1219.
Luo, Y. (2002). “Contract, cooperation, and performance in international joint ventures.” Strategic Manage. J., 23(10), 903–919.
Luo, Y. (2007). “The independent and interactive roles of procedural, distributive, and interactional justice in strategic alliances.” Acad. Manage. J., 50(3), 644–664.
Luo, Y. (2008). “Procedural fairness and interfirm cooperation in strategic alliances.” Strategic Manage. J., 29(1), 27–46.
Mead, P. (2007). “Current trends in risk allocation in construction projects and their implications for industry participants.” Constr. Law J., 23(1), 23–45.
Meng, X. (2012). “The effect of relationship management on project performance in construction.” Int. J. Project Manage., 30(2), 188–198.
Michael, S. C. (2000). “Investments to create bargaining power: The case of franchising.” Strategic Manage. J., 21(4), 497–514.
Nasirzadeh, F., Khanzadi, M., and Rezaie, M. (2014). “Dynamic modeling of the quantitative risk allocation in construction projects.” Int. J. Project Manage., 32(3), 442–451.
Pearce, R. J. (2001). “Looking inside the joint venture to help understand the link between inter-parent cooperation and performance.” J. Manage. Stud., 38(4), 557–582.
Peckiene, A., Komarovska, A., and Ustinovicius, L. (2013). “Overview of risk allocation between construction parties.” Procedia Eng., 57, 889–894.
Podsakoff, P. M., MacKenzie, S. B., Lee, J. Y., and Podsakoff, N. P. (2003). “Common method biases in behavioral research: A critical review of the literature and recommended remedies.” J. Appl. Psychol., 88(5), 879–903.
Poppo, L., and Zenger, T. (2002). “Do formal contracts and relational governance function as substitutes or complements?” Strategic Manage. J., 23(8), 707–725.
Poppo, L., and Zhou, K. Z. (2014). “Managing contracts for fairness in buyer-supplier exchanges.” Strategic Manage. J., 35(10), 1508–1527.
Preacher, K. J., and Hayes, A. F. (2004). “SPSS and SAS procedures for estimating indirect effects in simple mediation models.” Behav. Res. Methods, 36(4), 717–731.
Ring, P. S., and Van de Ven, A. H. (1992). “Structuring cooperative relationships between organizations.” Strategic Manage. J., 13(7), 483–498.
Ring, P. S., and Van de Ven, A. H. (1994). “Developmental processes of cooperative interorganizational relationships.” Acad. Manage. Rev., 19(1), 90–118.
Scheer, L. K., Kumar, N., and Steenkamp, J. B. E. (2003). “Reactions to perceived inequity in U.S. and Dutch interorganizational relationships.” Acad. Manage. J., 46(3), 303–316.
Schepker, D. J., Oh, W. Y., Martynov, A., and Poppo, L. (2014). “The many futures of contracts moving beyond structure and safeguarding to coordination and adaptation.” J. Manage., 40(1), 193–225.
Shumway, R., Richard, A., and Ritti, J. (2004a). “New trends and bad results in construction contracts, part I.” Leadersh. Manage. Eng., 93–98.
Shumway, R., Richard, A., and Ritti, J. (2004b). “New trends and bad results in construction contracts, part II.” Leadersh. Manage. Eng., 99–104.
SPSS version 19.0 [Computer software]. IBM, Armonk, NY.
Tiwana, A. (2010). “Systems development ambidexterity: Explaining the complementary and substitutive roles of formal and informal controls.” J. Manage. Inf. Syst., 27(2), 87–126.
Wong, P. P., and Cheung, S. O. (2004). “Trust in construction partnering: Views from parties of the partnering dance.” Int. J. Project Manage., 22(6), 437–446.
Wong, P. T., and Weiner, B. (1981). “When people ask ‘why’ questions, and the heuristics of attributional search.” J. Personal. Social Psychol., 40(4), 650–663.
Xu, Y., Chan, A. P., and Yeung, J. F. (2010). “Developing a fuzzy risk allocation model for PPP projects in China.” J. Constr. Eng. Manage., 894–903.
Zhang, S., Gao, Y., Feng, Z., and Sun, W. (2015). “PPP application in infrastructure development in China: Institutional analysis and implications.” Int. J. Project Manage., 33(3), 497–509.
Zhang, S., Zhang, L., and Gao, W. (2006). “Risk allocation in construction contracts: A comparison of China’s standard form of construction contract and FIDIC conditions of contract for construction.” Surveyors Times, 15(5), 35–41.
Zhang, Z., and Jia, M. (2010). “Procedural fairness and cooperation in public-private partnerships in China.” J. Manage. Psychol., 25(5), 513–538.
Zhou, K. Z., and Poppo, L. (2010). “Exchange hazards, relational reliability, and contracts in China: The contingent role of legal enforceability.” J. Int. Bus. Stud., 41(5), 861–881.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 142Issue 6June 2016

History

Received: Sep 28, 2014
Accepted: Oct 21, 2015
Published online: Jan 8, 2016
Published in print: Jun 1, 2016
Discussion open until: Jun 8, 2016

Permissions

Request permissions for this article.

Authors

Affiliations

Shuibo Zhang [email protected]
Professor, Dept. of Construction Management, College of Management and Economics, Tianjin Univ., Tianjin 300072, P.R. China. E-mail: [email protected]
Shuaijun Zhang [email protected]
Dept. of Construction Management, College of Management and Economics, Tianjin Univ., Tianjin 300072, P.R. China. E-mail: [email protected]
Ying Gao, Ph.D. [email protected]
Dept. of Construction Management, College of Management and Economics, Tianjin Univ., Tianjin 300072, P.R. China (corresponding author). E-mail: [email protected]
Xiaoming Ding [email protected]
Ph.D. Candidate, Dept. of Construction Management, College of Management and Economics, Tianjin Univ., Tianjin 300072, P.R. China. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share