Technical Papers
Jan 25, 2016

Impacts of the Social Subcontract and Last Planner System Interventions on the Trade-Crew Workflows of Multistory Residential Construction Projects

Publication: Journal of Construction Engineering and Management
Volume 142, Issue 7

Abstract

Despite empirical evidence of the effects of the Last Planner System. (LPS), the mechanisms by which it works are less well understood. Its strengthening of the social networks within construction projects implies the possibility of enhancing collaboration using means other than or in addition to the LPS. Inspired by Rousseau’s Social Contract, a new management artefact called the Social Subcontract (SSub) was devised to test this hypothesis. The impacts of SSub and LPS interventions on the workflow in eight residential construction projects were studied using action research over periods from 7 to 16 months. The results provide anecdotal evidence that application of SSub together with LPS improves coordination and workflow more than application of LPS alone. SSub also appears to motivate the general contractor to perform the make-ready process, which otherwise is often not implemented. The research provides new understanding of how the LPS functions. It contributes to industry and academia by relating theory to practice, potentially strengthening the confidence with which practitioners can apply such interventions to improve production flows.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

This research was funded in part by a grant from Tidhar Construction. The authors are particularly grateful to the company’s management and staff at all levels for their willingness to host the research and expose their projects as living laboratories.

References

Alarcón, D. M., Alarcón, I. M., and Alarcón, L. F. (2013). “Social network analysis: A diagnostic tool for information flow in the AEC industry.” 21st Annual Conf. of the Int. Group for Lean Construction, IGLC, Fortaleza, Brazil, 947–956.
Alarcón, L. F., Diethelm, S., Rojo, O., Calderon, R. (2005). “Assessing the impacts of implementing lean construction.” 13th Conf. of the Int. Group for Lean Construction, R. Kenley, ed., Univ. of New South Wales (UNSW), Sydney, Australia, 387–393.
AlSehaimi, A. O., Fazenda, P. T., and Koskela, L. (2014). “Improving construction management practice with the last planner system: A case study.” Eng. Constr. Archit. Manage., 21(1), 51–64.
Alves, T. d. C. L., Milberg, C., and Walsh, K. D. (2012). “Exploring lean construction practice, research, and education.” Eng. Constr. Archit. Manage., 19(5), 512–525.
Arashpour, M., and Arashpour, M. (2015). “Analysis of workflow variability and its impacts on productivity and performance in construction of multistory buildings.” J. Manage. Eng., 04015006.
Arashpour, M., Wakefield, R., Blismas, N., and Lee, E. W. M. (2014). “Analysis of disruptions caused by construction field rework on productivity in residential projects.” J. Constr. Eng. Manage., 04013053.
Azhar, S., Ahmad, I., and Sein, M. (2010). “Action research as a proactive research method for construction engineering and management.” J. Constr. Eng. Manage., 87–98.
Ballard, G. (2000). “The last planner™ system of production control.” Ph.D. dissertation, Univ. of Birmingham, Birmingham, U.K.
Ballard, G., and Rybkowski, Z. (2009). “Overcoming the hurdle of first cost: Action research in target costing.” Construction Research Congress 2009, ASCE, Reston, VA, 1038–1047.
Bashford, H. H., Walsh, K., and Sawhney, A. (2005). “Production system loading-cycle time relationship in residential construction.” J. Constr. Eng. Manage., 15–22.
Bavelas, A. (1973). “The five squares problem: An instructional aid in group cooperation.” Stud. Personnel Psychol., 5(2), 29–38.
Brodetskaia, I., Sacks, R., and Shapira, A. (2013). “Stabilizing production flow of finishing works in building construction with re-entrant flow.” J. Constr. Eng. Manage., 665–674.
Chan, W. T., and Hu, H. (2002). “Constraint programming approach to precast production scheduling.” J. Constr. Eng. Manage., 513–521.
Chinowsky, P., Diekmann, J., and Galotti, V. (2008). “Social network model of construction.” J. Constr. Eng. Manage., 804–812.
Connaughton, J., and Weller, S. (2013). “Improving collaboration in construction: An opportunity for action research.” 29th Annual ARCOM Conf., Association of Researchers in Construction Management, Reading, U.K.
Cruz-Cunha, M. M. (2011). Handbook of research on business social networking: Organizational, managerial, and technological dimensions, IGI Global, Hershey, PA.
D’Andrea, A., Ferri, F., and Grifoni, P. (2010). An overview of methods for virtual social network analysis, London.
Dave, B., Hämäläinen, J.-P., and Koskela, L. (2015). “Exploring the recurrent problems in the last planner implementation on construction projects.” Proc., Indian Lean Construction Conf. (ILCC 2015), ILCC, Mumbai, India.
Fiallo, C. M., and Revelo, P. V. H. (2002). “Applying the last planner control system to a construction project—A case study in Quito, Ecuador.” Proc., 10th Annual Conf. of the Int. Group for Lean Construction, C. T. Formoso and G. Ballard, eds., IGLC, Gramado, Brazil.
Flores, F., and Ludlow, J. J. (1980). “Doing and speaking in the office. Decision support systems: Issues and challenges.” International Institute for Applied Systems, Analysis, Laxenburg, Austria.
Forbes, L. H., and Ahmed, S. M. (2011). Modern construction: Lean project delivery and integrated practices, CRC Press, Boca Raton, FL.
Freeman, L. C., White, D. R., and Romney, A. K. (1989). Research methods in social network analysis, George Mason Univ., Fairfax, VA.
Gonzalez, V., Alarcon, L. F., and Mundaca, F. (2008). “Investigating the relationship between planning reliability and project performance.” Prod. Plann. Control, 19(5), 461–474.
González, V., Alarcón, L., Maturana, S., Mundaca, F., Bustamante, J. (2010). “Improving planning reliability and project performance using the reliable commitment model.” J. Constr. Eng. Manage., 1129–1139.
Hamzeh, F. R. (2009). “Improving construction workflow—The role of production planning and control.” Ph.D. dissertation, Univ. of California, Berkeley, CA.
Higgin, G., and Jessop, N. (1964). Communications in the building industry: The report of a pilot study, Tavistock Institute of Human Relations, London.
Kenley, R., and Seppänen, O. (2009). Location-based management for construction: Planning, scheduling and control, Spon Press, Abingdon, U.K., 584.
Kim, Y., and Jang, J. (2005). “Case study: An application of last planner to heavy civil construction in Korea.” Proc., 13th Conf. of the Int. Group for Lean Construction, Univ. of New South Wales (UNSW), Sydney, Australia, 405–411.
Kim, Y.-W., and Ballard, G. (2000). “Is the earned-value method an enemy of work-flow?” Proc., 9th Annual Conf. of the Int. Group for Lean Construction, D. Chua, and G. Ballard, eds., National Univ. of Singapore, Singapore.
Koskela, L. (2000). An exploration towards a production theory and its application to construction D, Helsinki Univ. of Technology, Espoo, Finland.
Lewin, K. (1946). “Action research and minority problems.” J. Social Issues, 2(4), 34–46.
Linhard, S. (2014). “Understanding the effect of variation in a production system.” J. Constr. Eng. Manage., 04014051.
Linhard, S., and Wandahl, S. (2011). “Handling soundness and quality to improve reliability in LPS—A case study of an offshore construction site in Denmark.” COBRA 2011: Proc., RICS Construction and Property Conf., L. Ruddock and P. Chynoweth, eds., Royal Institution of Chartered Surveyors (RICS), Salford, U.K., 1408–1418.
Macomber, H., Howell, G. A., and Reed, D. (2005). “Managing promises with the last planner system: Closing in on uninterrupted flow.” Proc., 13th Annual Conf. of the Int. Group for Lean Construction, Univ. of New South Wales (UNSW), Sydney, Australia, 13–18.
McGuinness, J. (2008). The law and management of building subcontracts, Wiley, Oxford, U.K.
Nicolini, D., Holti, R., and Smalley, M. (2001). “Integrating project activities: The theory and practice of managing the supply chain through clusters.” Constr. Manage. Econ., 19(1), 37–47.
Nohria, N., and Eccles, R. (1992). “Face to face: Making network organizations work.” Networks and organizations: Structure, form, and action, Harvard Business School Press, Boston, 288–308.
Ochieng, E. G., and Price, A. D. F. (2010). “Managing cross-cultural communication in multicultural construction project teams: The case of Kenya and UK.” Int. J. Project Manage., 28(5), 449–460.
Park, H., Jeong, W. Y., and Han, S. H. (2009). “Social network analysis of collaborative entries for construction firms in international construction projects.” 2009 Int. Symp. on Automation and Robotics in Construction (ISARC 2009), International Association for Automation and Robotics in Construction (IAARC), 169–175.
Pikas, E., Sacks, R., and Priven, V. (2012). “Go or no-go decisions at the construction workface: Uncertainty, perceptions of readiness, making ready and making-do.” Proc., 20th Annual Conf. of the Int. Group for Lean Construction, I. Tommelein and C. Pasquire, eds., San Diego State Univ., San Diego, 431–440.
Porwal, V., Fernández-Solís, J., Lavy, S., and Rybkowski, Z. (2010). “‘Last planner system implementation challenges.” Proc., 18th Annual Conf. of the Int. Group for Lean Construction, Technion–Israel Institute of Technology, Haifa, Israel, 548–556.
Priven, V., and Sacks, R. (2015). “Effects of the last planner system on social networks among construction trade crews.” J. Constr. Eng. Manage., 04015006.
Priven, V., Sacks, R., Seppanen, O., and Savosnick, J. (2014). “A lean workflow index for construction projects.” 22nd Annual Conf. of the Int. Group for Lean Construction, B. T. Kalsaas, T. A. Saurin, and L. Koskela, eds., Univ. of Adger, Kristiansand, Norway, 715–726.
Proctor, J., Jr. (1996). “Golden rule of contractor-subcontractor relations.” ASCE Pract. Period. Struct. Des. Constr., 12–14.
Pryke, S. D. (2005). “Towards a social network theory of project governance.” Constr. Manage. Econ., 23(9), 927–939.
Pryke, S. D. (2012). Social network analysis in construction, Wiley, Oxford, U.K.
Rousseau, J.-J. (1762). Du contrat social ou Principes du droit politique (of the social contract, or principles of political right), Marc-Michel Rey, Amsterdam, Netherlands.
Saaty, T. L. (1980). The analytic hierarchy process: Planning, priority setting, resource allocation, McGraw-Hill, New York.
Sacks, R., Esquenazi, A., and Goldin, M. (2007). “LEAPCON: Simulation of lean construction of high-rise apartment buildings.” J. Constr. Eng. Manage., 529–539.
Sacks, R., and Goldin, M. (2007). “Lean management model for construction of high-rise apartment buildings.” J. Constr. Eng. Manage., 374–384.
Sacks, R., and Harel, M. (2006). “An economic game theory model of subcontractor resource allocation behavior.” Constr. Manage. Econ., 24(8), 869–881.
Soares, A. C., Bernardes, M. M. S., and Formoso, C. T. (2002). “Improving the production planning and control system in a building company: Contributions after stabilization.” Proc., 10th Annual Conf. of the IGLC, IGLC, Gramado, Brazil.
Sterzi, M. P., Isatto, E. L., and Formoso, C. T. (2007). “Integrating strategic project supply chain members in production planning and control.” Proc., 15th Annual Conf. of the IGLC, Michigan State Univ., East Lansing, MI.
Taggart, M., Koskela, L., and Rooke, J. (2014). “The role of the supply chain in the elimination and reduction of construction rework and defects: An action research approach.” Constr. Manage. Econ., 32(7–8), 829–842.
Tommelein, I. D., Riley, D. R., and Howell, G. (1999). “Parade game: Impact of work flow variability on trade performance.” J. Constr. Eng. Manage., 304–310.
Tommelein, S., and Ballard, G. (1997). “Coordinating specialists.”, Construction Engineering and Management Program, Civil and Environmental Engineering Dept., Univ. of California, Berkeley, CA.
Viana, D., Mota, B., Formoso, C., Echeveste, M., Peixoto, M., and Rodrigues, C. (2010). “A survey on the last planner system: Impacts and difficulties for implementation in Brazilian companies.” Proc., 18th Annual Conf. of the Int. Group for Lean Construction, K. Walsh and T. Alves, eds., Technion–Israel Institute of Technology, Haifa, Israel, 497–507.
Yang, R., and Shen, G. (2014). “Framework for stakeholder management in construction projects.” J. Manage. Eng., 04014064.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 142Issue 7July 2016

History

Received: Dec 30, 2014
Accepted: Oct 9, 2015
Published online: Jan 25, 2016
Discussion open until: Jun 25, 2016
Published in print: Jul 1, 2016

Permissions

Request permissions for this article.

Authors

Affiliations

Vitaliy Priven, M.ASCE [email protected]
Ph.D. Candidate, Virtual Construction Laboratory, National Building Research Institute, Technion–Israel Institute of Technology, Haifa 32000, Israel (corresponding author). E-mail: [email protected]
Rafael Sacks, M.ASCE [email protected]
Associate Professor, Dept. of Structural Engineering and Construction Management, Technion–Israel Institute of Technology, Haifa 32000, Israel. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share